Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212H035 | 27 September 1999 | Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program | |
ML20211P180 | 8 September 1999 | Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program | |
ML20196G129 | 26 June 1999 | Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks | |
ML20207K340 | 11 March 1999 | Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211 | |
ML20196F712 | 1 December 1998 | Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants | |
ML20154B703 | 29 September 1998 | Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway Plants | Safe Shutdown Earthquake Earthquake |
ML20236T279 | 23 July 1998 | Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan | |
IR 05000482/1998301 | 20 May 1998 | Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer Key | Shutdown Margin Time to boil Temporary Modification Missed surveillance Pressure Boundary Leakage Continuous fire watch Power change |
ML20247M633 | 20 May 1998 | Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217 | Shutdown Margin Time to boil Missed surveillance Pressure Boundary Leakage Continuous fire watch Power change |
ML20216C928 | 13 May 1998 | Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance Results | Systematic Assessment of Licensee Performance |
ML20217Q601 | 29 April 1998 | Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway | |
ML20202J088 | 18 February 1998 | Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity | |
ML20198A658 | 31 December 1997 | Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing | |
ML20198A167 | 31 December 1997 | Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting | |
ML20198B302 | 19 December 1997 | Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications | |
ML20203E714 | 11 December 1997 | Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams | |
ML20203E626 | 11 December 1997 | Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled | |
ML20202B118 | 25 November 1997 | Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results | |
ML20212F587 | 30 October 1997 | Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures | |
ML20211J941 | 6 October 1997 | Forwards Operator Licensing Exam Rept Administered on 970825-29 | Boric Acid Shutdown Margin High Radiation Area Temporary Modification Job Performance Measure Unidentified leakage |
ML20211D788 | 18 September 1997 | Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident | |
IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime | 4 September 1997 | Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime | Condition Adverse to Quality |
ML20202E956 | 4 September 1997 | Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime | Condition Adverse to Quality |
ML20217M091 | 15 August 1997 | Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions | |
ML20196H337 | 22 July 1997 | Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl | |
ML20149G189 | 17 July 1997 | Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16 | |
ML20149G152 | 17 July 1997 | Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16 | Time of Discovery Shutdown Margin Ultimate heat sink Missed surveillance Job Performance Measure Continuous fire watch |
ML20141C530 | 19 June 1997 | Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action | |
ML20141H888 | 16 May 1997 | Notification of 970603 Meeting W/Wolf Creek Nuclear Operating Corp in Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Addl Submittals | |
ML20138E448 | 30 April 1997 | Notification of 970415 Meeting W/Wcnoc in Arlington,Texas to Discuss Afp Issues | |
ML20137Z920 | 22 April 1997 | Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP Results | Systematic Assessment of Licensee Performance |
ML20137C920 | 20 March 1997 | Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement | Unanalyzed Condition |
ML20134M247 | 14 February 1997 | Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 | |
ML20147C077 | 4 February 1997 | Notification of 970212 Meeting W/Wolf Creek Nuclear Operating Corp,In Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Any Addl Submittals | |
ML20133B169 | 31 December 1996 | Notification of 970116 Licensee Meeting W/Util in Arlington, Tx Re Predecisonal EC to Discuss Engineering Insp Issues | |
ML20134P120 | 25 November 1996 | Discusses 961016 Meeting W/Licensee to Discuss NRC SE Approving Use of Code Case N-517 to ASME & Pressure Vessel Code,For Use at Plant | |
ML20134P220 | 21 November 1996 | Notification of 961206 Meeting W/Util to Discuss Licensee Corrective Action Program & Safety Sys Functional Assessment of Auxiliary Feedwater Sys | |
ML20236M034 | 12 November 1996 | Discusses Interpretation of TS Requirements for Quadrant Power Tilt Ratio at Wolf Creek Plant | |
ML20128L348 | 8 October 1996 | Notification of 961016 Meeting W/Util in Rockville,Md to Discuss ASME Code N-517 & NRC Staff Safety Evaluation Approving Use | |
ML20236L580 | 31 August 1994 | Responds to 940531 Memo Requesting Clarification of NRR Response to Region II TIA Re Voluntary Use of Shutdown Time in TS for Corrective Maint | |
ML20059K535 | 21 January 1994 | Notification of 940201 Meeting W/Util & R Anderson in Arlington,Tx to Discuss Engineering Initiatives | |
ML20058G544 | 30 November 1993 | Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co | |
ML20058F439 | 26 November 1993 | Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports | |
ML20059E842 | 28 October 1993 | Notification of Significant Licensee Meeting W/Util on 931109 to Discuss Plant Operator Performance Weaknesses | |
ML20057F946 | 8 October 1993 | Notification of Significant Licensee Meeting W/Util on 931022 to Discuss Facility Performance & Continuing Status of Performance Enhancement Program | |
ML20057F243 | 4 October 1993 | Notification of 931015 Meeting W/Util in Rockville,Md to Discuss Licensee Program Re MOVs & Completion of Actions Recommended in GL-89-10 | |
ML20056E457 | 5 August 1993 | Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant | |
ML20127M952 | 22 January 1993 | Notification of Significant Licensee Meeting W/Util on 920211 to Discuss Licensee Engineering Initiatives | |
ML20128B449 | 22 January 1993 | Notification of Significant Licensee Meeting W/Util on 930211 to Conduct Mgt Meeting to Discuss Licensee Engineering Initiatives.Meeting Canceled | |
ML20126J394 | 30 December 1992 | Notification of Significant Licensee Meeting W/Util on 930114 to Discuss Licensee QA Program Initiatives |