Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20212H03527 September 1999Revised Notification of 991007 Meeting with Util to Discuss Status of Radiation Protection Program
ML20211P1808 September 1999Notification of 991007 Meeting with Util at DD Eisenhower Learning Ctr to Discuss Status of Radiation Protection Program
ML20196G12926 June 1999Notification of 990727-28 Meeting with Util to Discuss Licensee Use of Risk Info in Low Power & Shutdown Operations at Wolf Creek Generating Station.Meeting Held in Burlington,Ks
ML20207K34011 March 1999Notification of 990325 Meeting with Util to Discuss Results of Plant Performance Review Completed on 990211
ML20196F7121 December 1998Notification of 981203 Meeting with Util to Discuss Spent Fuel Pool Structural Evaluations Performed by Wolf Creek Nuclear Operating Corp & Union Electric Co in Support of Increasing Spent Fuel Pool Capacity at Plants
ML20154B70329 September 1998Notification of 981014-15 Meeting with Utils in Rockville,Md to Discuss Wolf Creek & Union Electric Co Proposed TS Amends to Support Mod to Increase SFP Capacity at Wolf Creek & Callaway PlantsSafe Shutdown Earthquake
Earthquake
ML20236T27923 July 1998Notification of 980806 Meeting W/Util in Rockville,Md to Discuss Util Planned Revs to Plant Radiological Emergency Response Plan
IR 05000482/199830120 May 1998Forwards Exam Rept 50-482/98-301 Administered on 980217, Along W/Facility Initial License Exam Comments,Final Written Exam & Answer KeyShutdown Margin
Time to boil
Temporary Modification
Missed surveillance
Pressure Boundary Leakage
Continuous fire watch
Power change
ML20247M63320 May 1998Forwards NRC Approved Operator Licensing Exam,Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 980217Shutdown Margin
Time to boil
Missed surveillance
Pressure Boundary Leakage
Continuous fire watch
Power change
ML20216C92813 May 1998Notification of 980617 Meeting W/Util in New Strawn,Kansas to Discuss Latest Systematic Assessment of Licensee Performance ResultsSystematic Assessment of Licensee Performance
ML20217Q60129 April 1998Notification of 980513 Meeting W/Wolf Creek Nuclear Operating Corp & Union Electric Co to Discuss Proposed TS Amends to Support Mod to Increase Spent Fuel Pool Capacity at Wolf Creek & Callaway
ML20202J08818 February 1998Notification of 980306 Mgt Meeting W/Licensee in Arlington, Tx to Discuss Plant Design & Licensing Bases Fidelity
ML20198A65831 December 1997Notification of 980122-23 Licensee Meeting W/Util in Arlington,Tx to Review Exam for Operator Licensing
ML20198A16731 December 1997Notification of Meeting W/Licensee on 980209-10 in Arlington,Tx to Review Exam for Operator Licensing.Meeting Not Open to General Public,Due to Subj Matter & Nature of Meeting
ML20198B30219 December 1997Forwards AEOD 6th Yr Engineering Evaluation NPP Cold Weather Problems & Protective Measures. Evaluation Initiated as Result of 960130 Event at WCGS Re Icing of Cold Water Intake Trash Racks & Other Complications
ML20203E71411 December 1997Notification of 971222 Meeting W/Licensee in Arlington,Tx to Review Exam Preparation for Operator License Exams
ML20203E62611 December 1997Notification of 971216 Meeting W/Licensee in Arlington,Tx to Discuss Recent Exam Results.Meeting Cancelled
ML20202B11825 November 1997Notification of 971216 Meeting W/Util in Arlington,Texas to Discuss Recent Exam Results
ML20212F58730 October 1997Notification of Licensee Meeting W/Util on 971113 to Discuss Root Causes & Corrective Actions from Recent Initial License Class Failures
ML20211J9416 October 1997Forwards Operator Licensing Exam Rept Administered on 970825-29Boric Acid
Shutdown Margin
High Radiation Area
Temporary Modification
Job Performance Measure
Unidentified leakage
ML20211D78818 September 1997Notification of 970924 Meeting W/Wolf Creek Nuclear Operating Corp to Discuss Status & Activities Associated W/ Generic Ltr 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident
IA-97-480, Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re Overtime4 September 1997Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re OvertimeCondition Adverse to Quality
ML20202E9564 September 1997Forwards Excerpts from Recent Plant Insp Rept,Which Addresses Part of Area Questioned Re OvertimeCondition Adverse to Quality
ML20217M09115 August 1997Notification of Significant Licensee Meeting W/Util on 970829 to Discuss Status of SALP Followup Actions
ML20196H33722 July 1997Responds to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, W/List of Attendees & Handouts Encl
ML20149G18917 July 1997Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered on 970415-16
ML20149G15217 July 1997Forwards NRC Operator Licensing Exam Rept (Including Completed & Graded Tests) for Tests Administered on 970415-16Time of Discovery
Shutdown Margin
Ultimate heat sink
Missed surveillance
Job Performance Measure
Continuous fire watch
ML20141C53019 June 1997Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action
ML20141H88816 May 1997Notification of 970603 Meeting W/Wolf Creek Nuclear Operating Corp in Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Addl Submittals
ML20138E44830 April 1997Notification of 970415 Meeting W/Wcnoc in Arlington,Texas to Discuss Afp Issues
ML20137Z92022 April 1997Notification of 970522 Meeting W/Util in Burlington,Ks to Discuss SALP ResultsSystematic Assessment of Licensee Performance
ML20137C92020 March 1997Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated EnforcementUnanalyzed Condition
ML20134M24714 February 1997Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13
ML20147C0774 February 1997Notification of 970212 Meeting W/Wolf Creek Nuclear Operating Corp,In Burlington,Ks to Discuss Status of Pending Licensing Actions & Plans for Any Addl Submittals
ML20133B16931 December 1996Notification of 970116 Licensee Meeting W/Util in Arlington, Tx Re Predecisonal EC to Discuss Engineering Insp Issues
ML20134P12025 November 1996Discusses 961016 Meeting W/Licensee to Discuss NRC SE Approving Use of Code Case N-517 to ASME & Pressure Vessel Code,For Use at Plant
ML20134P22021 November 1996Notification of 961206 Meeting W/Util to Discuss Licensee Corrective Action Program & Safety Sys Functional Assessment of Auxiliary Feedwater Sys
ML20236M03412 November 1996Discusses Interpretation of TS Requirements for Quadrant Power Tilt Ratio at Wolf Creek Plant
ML20128L3488 October 1996Notification of 961016 Meeting W/Util in Rockville,Md to Discuss ASME Code N-517 & NRC Staff Safety Evaluation Approving Use
ML20236L58031 August 1994Responds to 940531 Memo Requesting Clarification of NRR Response to Region II TIA Re Voluntary Use of Shutdown Time in TS for Corrective Maint
ML20059K53521 January 1994Notification of 940201 Meeting W/Util & R Anderson in Arlington,Tx to Discuss Engineering Initiatives
ML20058G54430 November 1993Notification of 931208 Meeting W/Util in Rockville,Md to Discuss Proposed TS Improvement Program to Be Jointly Undertaken by Wolf Creek Nuclear Operating Corp & Union Electric Co
ML20058F43926 November 1993Notification of 931209 Meeting W/Util in Rockville,Md to Discuss Possible Replacement of Steam Generator Hydraulic Supports W/Other Types of Mechanical Components Supports
ML20059E84228 October 1993Notification of Significant Licensee Meeting W/Util on 931109 to Discuss Plant Operator Performance Weaknesses
ML20057F9468 October 1993Notification of Significant Licensee Meeting W/Util on 931022 to Discuss Facility Performance & Continuing Status of Performance Enhancement Program
ML20057F2434 October 1993Notification of 931015 Meeting W/Util in Rockville,Md to Discuss Licensee Program Re MOVs & Completion of Actions Recommended in GL-89-10
ML20056E4575 August 1993Forwards Technical Review Rept Re, Tardy Licensee Actions Initiated Because of Delayed Replacement of Batteries in Uninterruptible Power Supplies at Plant
ML20127M95222 January 1993Notification of Significant Licensee Meeting W/Util on 920211 to Discuss Licensee Engineering Initiatives
ML20128B44922 January 1993Notification of Significant Licensee Meeting W/Util on 930211 to Conduct Mgt Meeting to Discuss Licensee Engineering Initiatives.Meeting Canceled
ML20126J39430 December 1992Notification of Significant Licensee Meeting W/Util on 930114 to Discuss Licensee QA Program Initiatives