Notification of 970625 Meeting W/Wolf Creek Nuclear Operating Corp in Rockville,Md to Discuss Licensees Response to GL 96-06,including Corrective Action to Be Taken & Schedule for Completion of Corrective Action
ML20141C530
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/19/1997
From: Stone J
NRC (Affiliation Not Assigned)
To: Bateman W
NRC (Affiliation Not Assigned)
References
GL-96-06, GL-96-6, NUDOCS 9706250271
Download: ML20141C530 (4)


Text

- .. . - . - - . - . - _ . - . . . . . - . - . - - . - . - . . . . . - - . _ - .

June 19,1997 -

MEMORANDUM T0: William H. Bateman Director Project Directorate IV-2  !

Division of Reactor Projects III/IV  :

Office of Nuclear Reactor Regulation  ;

FROM: James C. Stone. Senior Project Manager Project Directorate IV-2 Original Signed By Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

SUBJECT:

MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION i DATE & TIME: June 25, 1997 1:00 p.m. - 4:30 p.m.  ;

LOCATION: U. S. NRC Headquarters One White Flint North 11555 Rockville Pike .

Rockville. Maryland 20852 Room 0 13-B-9 PURPOSE: To discuss the licensee's res)onse to Generic Letter 96-06.

' Assurance of Equipment Opera)ility and Containment Integrity During Design-Basis Accident Conditions." including the corrective action to be taken and the schedule for completion (

of the corrective action. i PARTICIPANTS *- NRC Wolf Creek Nuclear Ooeratino Corooration i R. Wessman R. Muench  !

T. Marsh T. Garrett K. Manoly R. Flannigan G. Hubbard B. Selbe J. Fair T. Damashek J. Tatum C. Saadu J. Stone Docket No.'50-482

Attachment:

Agenda gg g Q{pyQ@@py D@

cc: See next page '

i I I

}

CONTACT: James Stone ,

415-3063

  • Meetings between NRC technical staff and applicants or licensees are open for interested members of the public. petitioners, intervenors, or other parties i to attend as observers aursuant to " Commission Policy Statement on Staff i Meetings Open to the Pu)1ic" 59 Federal Reaister 48340, 9/20/94.  !

l l

DOCUMENT N4ME:n t NGO97.MTG OFC PDIV-2[PM PDIV-2/LA PDIV-2/R j '

NAME JStone:yd EPey @ WBatem k d DATE 6/ 8 /97 6/18/97 6/lk/97 9706250271 970619 RD LOPY PDR ACOCK 05000482 l '

- (P FP[D] _ , . , _ _

l i

l l

cc w/att:

Jay Silberg, Esq. Chief Operating Officer Shaw, Pittman, Potts & Trowbridge Wolf Creek Nuclear Operating Corporation 2300 N Street, NW P. O. Box 411 i

Washington, D.C. 20037 Burlington, Kansas 66839 l l Regional Administrator, Region IV Supervisor Licensing l U.S. Nuclear Regulatory Comission Wolf Creek Nuclear Operating Corporation

! 611 Ryan Plaza Drive, Suite 1000 P.O. Box 411 Arlington, Texas 76011 Burlington, Kansas 66839 Senior Resident Inspector U.S. Nuclear Regulatory Comission

! U.S. Nuclear Regulatory Comission Resident Inspectors Office 4 l P. O. Box 311 8201 NRC Road Burlington, Kansas 66839 Steedman, Missouri 65077-1032 Chief Engineer Mr. Otto L. Maynard Utilities Division President and Chief Executive Office Kansas Corporation Comission Wolf Creek Nuclear Operating Corporation 1500 SW Arrowhead Road Post Office Box 411 Topeka, Kansas 66604-4027 Burlington, Kansas 66839 Office of the Governor State of Kansas Topeka, Kansas 66612 Attorney General Judicial Center 301 S.W. 10th 2nd Floor Topeka, Kansas 66612 County Clerk Coffey County Courthouse Burlington, Kansas 66839 Vick L. Cooper, Chief Radiation Control Program Kansas Department of Health and Environment Bureau of Air and Radiation Forbes Field Building 283 Topeka, Kansas 66620 l

1 I

AGENDA FOR MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION 1

GENERIC LETTER 96-06 JUNE 25. 1997 i

1. Discussion of the operability of containment coolers in the event of a

, LOCA. including design features to withstand a water hammer, forces generated during the event and ability of coolers to achieve the heat  !

removal assumptions for design basis accidents.

, 2. Assessment of any 2-phase flow conditions that were identified, plans for resolution of the condition and the schedule for completion.

3. For piping inside containment that may be subject to thermally induced overpressurization:

i

a. Discuss the results of evaluations done to date, schedule for  !

completion of the detailed calculations.  !

b. Discuss any anticipated staff ap3rovals required to complete the analysis and the schedule for su) mission
b. Discuss any identified modifications and the schedule for

. completion.

4 I

DISTRIBUTION - June 25. 1997. Meetina with WCNOC Docket F.ile*4

  • PUBLIC

'OIV-2 Reading

  • iC* 0-15B18

,RS*

receptionist (0WFN)*

S. Collins /F. Miraglia R. Zimmerman (RPZ)

J. Roe E. Adensam (EGA1)

J. Stone

  • E. Peyton*

D. Ross (SLM3)

OPA (OPA)

M. Dapas. EDO R. Wessman*

T. Marsh

  • K. Manoly*

G. Hubbard*

J. Fair

  • J. Tatum*

C. Saadu*

M. Hammond (MFH2)

B. Henderson (BWH)

A. Howell . RGN-IV K. Perkins, RGN-IV/WCF0 PMNS