Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211K559 | 3 December 1986 | Package of Four Undated Memos Forwarding Part 21 & Deficiency Repts from Utils.Followup of Generic Aspects of Problem Requested.W/O Repts.Supporting Documentation Encl | |
ML20136E341 | 8 December 1982 | Submits Review of Memo Re Procedures for Cancelling Cps. Applicant Should Write Procedure to Allow Timely NRC Final Insp & Disposition | |
ML20054K958 | 15 June 1982 | Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology | |
ML20054M214 | 9 November 1981 | Discusses 811105 Telcon W/P Kirby of FBI Concerning Allegation of Falsified QA Records Re Atlas Machine & Iron Works | |
ML20215A520 | 2 February 1981 | Forwards 10CFR50.55(e) & Part 21 Telephone Rept Re Tdi Diesel Generator Turbocharger Thrust Bearings Defect. Followup on Generic Aspects of Problem Requested | |
ML20147D219 | 12 December 1978 | Based on Evidence to Date,Fault 5 Is Not Capable W/In Meaning of 10CFR100.Due to Apparent Association of Fault 5 to Faults Previously Described,Staff Does Not Feel Site Visit Is Necessary | |
ML20147C518 | 11 December 1978 | on 781114 TVA Reported the Discovery of a Reverse Fault 106 Feet North of Reactor'S east-west Center Line.Tva Will Submit Rept Detailing Description of Reverse Fault & Faults Relationship to Regional Geology | |
ML20148K956 | 2 November 1978 | Forwards NRC Memos Re Problems W/Pipe Support Base Plate Design.Ofc of Nuc Reactor Reg States That Problems Apply to Subj Facil.W/Encl ANO:7811020332 & 7811020336.) | Flow Induced Vibration |
ML20147D266 | 6 October 1978 | Forwards 780829 Internal NRC Memo Re Pipe Cracks Reported in Large Diameter Piping Sys of a Foreign Boiling Water Reactor (Bwr),The Significance of Which Is Being Reviewed Relative to Domestic Bwr'S | |
ML20147D301 | 29 August 1978 | Updates Info in 780331 Memo Re Pipe Cracks in Large Diameter Piping Sys of Foreign Boiling Water Reactors(Bwr).Concludes That Occurrence Is Noteworthy & Significance for Domestic Bwr'S Is Being Assessed | |
ML20235D235 | 24 November 1975 | Discusses Proposed CP Stage Health & Safety Review Schedule for Util Application for CP Docketed on 751107.Proposed Schedule Includes 761004 as Date for Issuing SER W/Final Sser Scheduled for 770110 |