j$
UNITE D STA TES p
- Q NUCLEAR REGULATORY COMMISSION g
WASHINGTON, D. C. 20555
\\,
/
DEC 1153 1
MEMORANDUM FOR: Olan D. Parr, Chief _
Light Water Reactors Branch #3, DPM FROM:
J.-Carl Stepp, Chief Geosciences Branch,'OSE
SUBJECT:
FAULTING IN THE FUEL BUILDING EXCAVATION OF UNIT 2 TAC # 4954 f
PLANT NAME: Phipps Bend Nuclear Power Plant, Units 1 & 2
\\
LICENSING STAGE:
CP DOCKET NUMBER:
50-553/554 MILESTONE NUMBER: N/A RESPONSIBLE BRANCH: Sid' Miner, LWR-3 As per the requirements outlined in my. August 14, 1978 memo, the Tennessee Valley Authority (TVA) informed Sandra Wastler on November -
14, 1978 that while excavating the foundation for the Phipps Bend, Unit 2 fuel building they had found a fault. According to-TVA, the reverse fault uncovered in the foundation excavation of the reactor building, Unit 2, lies approximately 106 feet north of the east-west centerline.cf the reactor. Fault #5 trends approximately N450 with an' approximate dip of 840 to the north and an apparent offset of 1 foot or less. The fault extends 65 feet to the west of the east wall and extends eastwardly beyond the excavation and beneath undisturbed high-level Quaternary terrace deposits.
,, g TVA will be submitting a letter report providing a detailed descrip-tion of this reverse fault and discussion of the faults' relationship to the regional geology. The staff will ev7.luate this report and determine if a site visit is necessary.
Q [~
J in
$4wm ~A
/nN. - Carl Stepp, Chief v
Geosciences Branch Division of Site Safety and i
Environmental Analysis i
cc:
R. Boyd R. Jackson Local PDR q
.R.
DeYoung-S. Miner j
D. Muller S. Goldberg R. Denise POR 7 8'1'218 0 3/V u
-