Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217C531 | 8 October 1999 | Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public | |
ML20217F084 | 8 October 1999 | Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed | |
ML20212K890 | 5 October 1999 | Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 | |
ML20216J015 | 29 September 1999 | Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site | |
ML20216G367 | 10 September 1999 | Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 | |
ML20211D100 | 20 August 1999 | Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md | |
ML20210U757 | 20 August 1999 | Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed | Scaffolding |
ML20210G616 | 28 July 1999 | Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 | |
ML20210C999 | 22 July 1999 | Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed | |
ML20210E951 | 12 July 1999 | Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status | |
ML20212H962 | 23 June 1999 | Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 | |
ML20212H949 | 23 June 1999 | Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon | |
ML20195H852 | 18 June 1999 | Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, | |
ML20195H991 | 15 June 1999 | Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup | |
ML20206U204 | 19 May 1999 | Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI | |
ML20206F292 | 5 May 1999 | Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 | |
ML20206D129 | 28 April 1999 | Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status | |
ML20205N316 | 9 April 1999 | Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies | |
ML20205J355 | 16 March 1999 | Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves | |
ML20197G638 | 7 December 1998 | Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 | |
ML20196E280 | 30 November 1998 | Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure | |
ML20155G775 | 4 November 1998 | Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses | |
IR 05000289/1998301 | 4 November 1998 | Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility | Boric Acid High Radiation Area Job Performance Measure Continuous fire watch Fire Watch |
ML20155G593 | 3 November 1998 | Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl | |
ML20154G345 | 1 October 1998 | Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings | |
ML20153D968 | 24 September 1998 | Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 | |
ML20153B972 | 14 September 1998 | Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 | |
ML20153E360 | 3 September 1998 | Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 | |
ML20237E838 | 28 August 1998 | Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen | |
ML20237E459 | 20 August 1998 | Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed | |
ML20237C940 | 14 August 1998 | Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings | |
ML20248H820 | 4 June 1998 | Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl | |
ML20248D635 | 29 May 1998 | Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication | |
ML20247M219 | 19 May 1998 | Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 | |
ML20216B687 | 8 May 1998 | Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 | |
ML20216C427 | 17 April 1998 | Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference | Foreign Material Exclusion |
ML20216C925 | 7 April 1998 | Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility | Packing leak Half scram Squib Locked High Radiation Area Scram Discharge Volume Grace period |
IR 05000289/1998099 | 26 February 1998 | Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 | Systematic Assessment of Licensee Performance |
IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 | 6 February 1998 | Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 | |
ML20154B793 | 6 February 1998 | Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 | |
ML20236N420 | 30 January 1998 | Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 | Nondestructive Examination Exemption Request |
ML20199H670 | 20 November 1997 | Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 | |
ML20199E707 | 14 November 1997 | Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice | |
ML20199B311 | 6 November 1997 | Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability | |
ML20212G953 | 5 November 1997 | Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange | Fire Barrier |
ML20211A536 | 12 September 1997 | Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues | |
ML20216E987 | 8 September 1997 | Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits | |
ML20210K300 | 15 August 1997 | Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status | |
ML20151L777 | 1 August 1997 | Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants | Fire Barrier |
IR 05000277/1997099 | 21 July 1997 | Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 |