Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
LIC-22-0001, Well Water Results with River Stage13 January 2022Well Water Results with River StageGrab sample
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML16057A07426 February 2016Response to Regulatory Information Summary (RIS) 2015-16, Planned Licensing Action Submittals for All Power Reactor Licensees.
ML15355A08722 December 2015Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request- Flood Causing Mechanism ReevaluationFLEX
Fukushima Dai-Ichi
ML13351A47616 December 2013Recommendation for NRC to Close Confirmatory Action Letter EA-13-020 Supporting the Restart of Fort Calhoun Station and Recommendation to Issue Post-Restart Confirmatory Action LetterSafe Shutdown
Unanalyzed Condition
Fire Barrier
Met Tower
Temporary Modification
B.5.b Mitigating Strategies
Maintenance Rule Program
ML13109A30220 December 2012G20120458/EDATS: OEDO-2012-0390 - Attachment 6
ML13109A30320 December 2012G20120458/EDATS: OEDO-2012-0390 - Attachment 7
ML12145001423 May 2012NFPA 805 LAR Status Matrix - May 2012
ML12012A2518 June 2011Email from Edward Mccutchen to Louis Carson, Brownville, Ne Flood Forecast
LIC-11-0041, Transmittal of Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)5 April 2011Transmittal of Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)Hydrostatic
Pressure and Temperature Limits Report
LIC-07-0073, Closure of NRC TAC Issues11 July 2008Closure of NRC TAC IssuesB.5.b Mitigating Strategies
LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 91 Through End31 March 2008Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 91 Through End
ML08107032631 March 2008Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 51 Through 90
ML08107032531 March 2008Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System.
LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 51 Through 9031 March 2008Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System, Attachment 2, Pages 51 Through 90
LIC-08-0037, Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System.31 March 2008Calculation FC05694, Calculation of Minimum Reactor Coolant Time Using Shutdown Cooling System.
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
LIC-06-0116, Spreadsheet File of Instructions, Time Temp Ph Input, Material Input, Materials Conversions, Results Tables10 October 2006Spreadsheet File of Instructions, Time Temp Ph Input, Material Input, Materials Conversions, Results Tables
ML06286043210 October 2006Spreadsheet File of Instructions, Materials Conversions, Results Table, Releases by Material, & Precipitate by Material, Reports
ML0514304243 June 2005Summary of Meeting with Omaha Public Power District, Fort Calhoun - Summary of Conference Call 2005 Steam Generator Inspection
LIC-05-0040, Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors7 April 2005Relaxation Request for First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water ReactorsNondestructive Examination
ML18346A2468 August 1978Furnishing Information Re Combustion Engineering Owners' Group Proposed Plan to Resolve the Asymmetric LOCA Loads Issue