Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20216D872 | 26 July 1999 | Review of Submittal in Response to USNRC GL 88-20,Suppl 4: 'Ipeees,' Fire Submittal Screening Review Technical Evaluation Rept:Hope Creek Rev 1:980518 | Hot Short Safe Shutdown Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Fire Protection Program Fire Watch |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML18107A315 | 30 April 1999 | Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 | Safe Shutdown Mission time Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake |
ML20216D845 | 30 April 1999 | Rev 1, Submittal-Only Screening Review of Hope Creek Unit 1 IPEEE (Seismic Portion). Finalized April 1999 | Mission time Safe Shutdown Earthquake Earthquake |
ML20198N416 | 12 November 1998 | MSIV Alternate Leakage Treatment Pathway Seismic Evaluation | Hydrostatic Design basis earthquake Exemption Request Earthquake |
ML18106A682 | 24 June 1998 | Revised Charting Our Future. | |
ML18106A668 | 17 June 1998 | Charting the Future. | |
ML20248C738 | 22 May 1998 | Rev 0 to Safety Evaluation 98-015, Extension of Allowed Out of Service Time for B Emergency Diesel Generator | Enforcement Discretion |
ML18106A257 | 19 January 1998 | Nuclear Business Unit Future Objectives. | Shutdown Margin Temporary Modification |
ML20216E543 | 31 December 1997 | Rev 1 to GE-NE-523-A164-1294, Hope Creek 1 Generating Station RPV Surveillance Matls Testing & Fracture Toughness Analysis | |
ML18106A213 | 15 December 1997 | Safety Evaluation Supporting Rev to TS to Adopt Option B of 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing | |
ML20199A679 | 31 October 1997 | RF07 Shroud Circumferential Weld Ultrasonic Exams, Final Rept | |
ML20249A828 | 5 June 1997 | 100 F Sacs Design Temp Limit Evaluation | Ultimate heat sink |
ML18102B333 | 28 February 1997 | Rev 0 to Cfcu Return Piping Inside CTMT,221F Temp Effect. | Safe Shutdown |
ML20133D220 | 6 December 1996 | Root Cause Analysis of Struthers-Dunn Operate-Reset Relay Latch Failures for Salem Generating Station | Boric Acid Time of Discovery |
ML20133D225 | 30 October 1996 | Struthers-Dunn Model 255XCXP Relay Root Cause Evaluation for Salem Nuclear Generation Station | Boric Acid Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML18102A323 | 1 July 1996 | Reg Guide 1.121 Assessment of Indications at Salem Unit 2. | |
ML18102A159 | 4 June 1996 | Fuel Handling Accident Analysis Radiological Evaluation. | |
ML20101M660 | 24 March 1996 | Supplemental Submittal in Response to NRC GL 87-02/USI A-46, 'Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.' | |
ML18102A132 | 15 March 1996 | Change 2EC-3332 to Rev 0 to Design Analysis, 125 Vdc Battery Charger Replacement. | Fire Barrier Fire Watch |
ML18102B020 | 28 February 1996 | Rev 0 to Evaluation of Structures for Increased Temps Due to Updated Main Steam Line Break. | Operating Basis Earthquake Design basis earthquake |
ML20129K103 | 10 July 1995 | Exam of Fasteners from Salem Nuclear Generating Station | |
ML18101A748 | 19 May 1995 | Safe Shutdown Equipment List Rept for Salem Generating Station Units 1 & 2 | Safe Shutdown Shutdown Margin Loop seal Safe Shutdown Earthquake Power change |
ML20085F122 | 30 April 1995 | RPV Surveillance Matls Testing & Fracture Toughness Analysis | |
ML18101A749 | 25 April 1995 | Relay Evaluation Rept, Volumes 1 & 2, for Salem Generating Station Units 1 & 2 | Safe Shutdown Safe Shutdown Earthquake Earthquake |
ML18101A750 | 20 April 1995 | Seismic Evaluation Rept, for Salem Generating Station | Safe Shutdown Loop seal High Radiation Area Fire Barrier Tornado Missile Commercial Grade Dedication Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Seismically rugged Exemption Request Earthquake Fire Protection Program Weak link |
ML18102B654 | 24 March 1995 | Organizational Effectiveness Assessment Rept for Plant, Redacted Version | |
ML20134K103 | 24 March 1995 | Organizational Effectiveness Assessment Rept for Sngs, | |
ML18101A439 | 21 December 1994 | Fire Protection Review of Salem Reactor Coolant Pump Oil Collection Sys, Dtd 941221 | Safe Shutdown Safe Shutdown Earthquake Fire Protection Program Backfit |
ML20134C579 | 23 October 1994 | Salem/Maint SC.MD-GP.SW-0001(Q) Svc Water Silt Survey, Rev 5 | Boric Acid Biofouling |
ML20082V188 | 11 October 1994 | Investigation of an Allegation of Inadequate CR Staffing at Hope Creek Generating Station | |
ML18106B054 | 31 January 1994 | Criticality Analysis of Salem Units 1 & 2 Fresh Fuels Racks. | Shutdown Margin |
ML18100A797 | 23 December 1993 | Simulator Four-Year Certification Rept. | Boric Acid Probabilistic Risk Assessment Fuel cladding |
ML20069M222 | 15 October 1993 | Flux Thimble Thermocouple Ultrasonic Profilometry & Eddy Current Encircling Coil Insp of Stored Thimble Tubes Jul-Aug 1993 | |
ML18100A628 | 16 September 1993 | Updated Page A4-4 of Boric Acid Concentration Reduction Effort Technical Bases & Operational Analysis, Changing Figure Numbers A5-1 & A5-2 to A4-1 & A4-2 at End of First Paragraph | Boric Acid Shutdown Margin |
ML18100A680 | 20 August 1993 | Engineering Evaluation of Sgs 1 & 2 Control Room Evacuation for Fire Induced MOV Hot Shorts as Discussed in NRC Info Notice 92-018. | Hot Short Safe Shutdown Boric Acid |
ML20045B880 | 21 May 1993 | Boric Acid Concentration Reduction Effort Technical Bases & Operational Analysis for Salem Nuclear Generating Station, Units 1 & 2. | Safe Shutdown Boric Acid Shutdown Margin |
ML18100A340 | 28 April 1993 | Licensing Rept for Spent Fuel Storage Capacity Expansion Pse&G,Salem Generation Station,Units 1 & 2. | Boric Acid High Radiation Area Non-Destructive Examination Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Design basis earthquake Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant |
ML18096B356 | 11 February 1993 | Cycle 8 Peaking Factor Limit Rept. | |
ML20135A814 | 29 December 1992 | Control Room Overhead Annunciator Lock-Up of 921213 | |
ML20125D917 | 11 December 1992 | Simulator 4-Yr Recertification Rept | Squib Feedwater Controller Failure Fuel cladding |
ML18096B166 | 13 November 1992 | Rev 1 to Fracture Toughness Analysis for Salem Units 1 & 2 Reactor Pressure Vessels to Protect Against Pressurized Thermal Shock Events,10CFR50.61. | |
ML18096B008 | 2 September 1992 | Analytical Data Rept, for Project 28173 | |
ML18096A806 | 17 June 1992 | Rev 0 to Salem Unit 2 Response to Generic Ltr 92-01,Rev 1, 'Reactor Vessel Structural Integrity.' | Exemption Request |
ML18096A805 | 17 June 1992 | Rev 0 to Salem Unit 1 Response to Generic Ltr 92-01,Rev 1, 'Reactor Vessel Structural Integrity.' | Exemption Request |
ML18096A583 | 31 March 1992 | Rev 1 to Estimated Frequency of Loss of Off-Site Power Due to Extremely Severe Weather & Severe Weather for Salem & Hope Creek Generating Stations. | Probabilistic Risk Assessment |
ML20076E274 | 1 July 1991 | Rev 0 to Hope Creek Generating Station Bailey 862 Sys Logic Module Failure Data Rept,Second Quarter 1991 | |
ML20077C496 | 8 April 1991 | Rev 1 to Hope Creek Generating Station Bailey 862 Sys Logic Module Failure Data Rept,First Quarter 1991 | |
ML20067B375 | 8 January 1991 | Bailey 862 Sys Logic Module Failure Data Rept,Fourth Quarter 1990 |