Bailey 862 Sys Logic Module Failure Data Rept,Fourth Quarter 1990
ML20067B375
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 01/08/1991
From:
Public Service Enterprise Group
To:
Shared Package
ML20067B373 List:
References
NUDOCS 9102080232
Download: ML20067B375 (4)


Text

r 3

I HOPE CREEK GENERATING STATION--

EAILEY 862 SYSTEM LOGIC MODULE FAILURE DATA REPORT PERIOD:

FOURTH QUARTER 1990 l fT fgf.

PREPARED BY:

L SYSTEM ENCrINEER DATE APPROVED BY:

[)d4

/-7 9f TECHNICAL ENGINEER TATE i

1 PAGE 1 9102080232 910201 PDR ADOCK 05000354 R

PDR WLL '7(0/7 L

j 2

l BAILEY SSLM REPORT A.

SUMMARY

OF FAILURES BY MONTH DURING-REPORT PERIOD i

OCTOBER 1990 1) 10/02/90 1CC653 SLOTL8-6-15 0-2399-N-0600 INPUT BUFFER #8 FAILED.

CONFIRMED FAILURE-W.O.

901001308 PROBLEM: - 1C-P-209,.C RACS PUMP 1 TRIPPED ON LOWJFLOW.'

TOTAL MONTHLY FAILURES = 1 i

NOVEMBER 1990 1) 11/04/90 1AC652-SLOT 9-6 0-1241

-N-0617-i INPUT BUFFER #5 FAILED.

CONFIRMED FAILURE WO 901104088 PROBLEM:

NO OPEN INDICATION FOR 1BEHV-F005A-E21. CORE SPRAY LOOP A CONTAINMENT ISOLATION.'-

- j 2) 11/08/90 1CC653 SLOT 8-7-6 0-2403-

'N-1379.

INPUT BUFFER #1 FAILED CONFIRMED-FAILURE.

W.O.

901019077 PROBLEM:

DUAL INDICATION ON.-1CGHV-1962A, 2ND; STAGE AIR-

' EJECTOR A SUCTION.

3).

11/11/90-1CC653 SLOT'5-4-2 0-1558 N-1232 INPUT BUFFER #1 FAILED CONFIRMED. FAILURE-W.O.

901110095 PROBLEM:

1C-P-137', C SEC COND PUMP,; DUAL: START /STOPn INDICATION WITH PUMP OOS.

l 4)

-11/12/90 1BC653 SLOT 4-7-12 0-1088-

N-1269 INPUT BUFFER #1 FAILED.

L CONFIRMED--- FAILURE-W.O.

901105143-PROBLEM:

1AFHV-1502B1, 6B'FW HTR STARTUP-VENT, DUAL.

l INDICATION.

l 5) 11/13/90:

1BC653-SLOT-12-5 aO-1694 N-0603i 1

OUTPUT BUFFERS #2,4,6 FAILED,

CONFIRMED. FAILURE W.O.

900927151.

PROBLEM:

- 1F2V-212, DRYWELL-COOLER. FAN INDICATED-BOTH STOP AND START.HI WHEN FAN WAS RUNNING.

6) 11/21/90.

~1BC652 SLOT:8-9-5' O-0212'

N-1362 INPUT BUFFER-#5' FAILED CONFIRMED FAILURE W.O.

900208293

. PROBLEM:

1BDHV-4405 WOULD NOT~SHOW OPEN. ACTUAL MODULE-FAILURE WOULD HAVE:AFFECTED 1FCHV-F060-E51,' RCIC' VACUUM ~

-PUMP DISCHARGE VALVE. THE LATTER-VALVE WOULD.HAVELALWAYSj

'HAD AN OPEN INDICATION.

1 PAGE 2-A y++r'-

?

t > 9M+-

g e

g'N p

vg cir

? wet-M W

w-p em 4 91P gr-*

e e-as ie--

ee e

7) 11/27/90 1AC652 SLOT 8-9-7 O-2'410-N-1125 INPUT BUFFER #6 FAILED:

CONFIRMED FAILURE W.O.

901127093 PROBLEM:- 1FDHV-F001-E41, HPCI TURBINE STEAM SUPPLY VALVE, HAD FLASHING OVLD/PWR FAIL INDICATION WHICH WOULD NOT ACKNOWLEDGE.

TOTAL MONTHLY FAILURES = 7 DECEMBER 1990 1) 12/05/90

-1CC653 SLOT 8-6-8 O-1274

. N-0358 INPUT BUFFER #8 FAILED CONFIRMED FAILURE-W.O.

901119107 PROBLEM:

1C-S-100, C RFPT TURNING GEAR, WOULD NOT-START:

WHEN REQUESTED FROM THE CONTROL ROOM.

i TOTAL MONTHLY FAILURES = 1 TOTAL QUARTERLY FAILURES = 9 SSLM'8 B.

FAILURE RATE DATA 1)

-25 CONFIRMED FAILURES.FROM 01/01/90 THRU 12/31/90.

2) 2278 SSLM POPULATION 3)

ANNUAL FAILURS RATE PERCENTAGE:

a.

25 + 2278 = 0.01009 x 100 = 1.10 %

4)

MEAN TIME BETWEEN FAILURES' DETERMINATION:

MTBF FROM.01/01/90 THRU 12/31/90.-

a.

12 MONTH SERVICE HOURS-= 8760 HOURS b.

TOTAL MODULE SERVICE HOURS f8760 X 2278 = 19.95'x 106'

'19.95 x 106 +.25 FAILURES = 798,211 HOURS-t c.

25-+ 19.95 x 106 = 1.25 FAILURES PER MILLION LHOURS' FAILURE RATE.

C.

COMPARISON STANDARD, 1)

THE lEEE 50_Q-STANDARD-EXPECTED-FAILURE RATE OF SOLIDL STATE COMPUTATION DEVICES IS EQUAL TO_1.19 FAILURES R

EIE'MILLION HOURS FAILURE BATE 2 PAGE 3-I

~

r 7

- 1 i

-i

  • - ~ -

...s...

a

(-

2)

THE'HCfd BAILEY 312. SSLM FAILURE RATE-FROM JAH 1990 THRU QEC 1990 IS-EQUAL TO-1.25 FAILURES EIB MILLION HOURS FAILURE RATE.

1 D.

-ANALYSIS 1)

HCGS BAILEY 862 SSLM FAILURE RATE APPEARS TO.HAVE i

STABILIZED'IAW-IEEE 500 STANDARD._

l 2)

NO CONFIRMED FAILURE RESULTED'IN INOPERABILITY OFe ANY SAFETY RELATED FUNCTION. ALL FAILURES RELATED TO SAFETY RELATED'FUNCTIONSLWERE-INDICATION PROBLEMS ONLY. THOSE VALVES AFFECTED-OPERATED'AS PER DESIGN.-

E.

RECOMMENDATIONS-1)

NONE J

P PAGE 4-

-