ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML18017A898 | 12 May 1999 | Technical Rept Entitled, Harris Nuclear Plant-Bacteria Detection in Water from C&D Spent Fuel Pool Cooling Lines. | |
ML18016A894 | 5 April 1999 | Revised Pages 20-25 to App 4A of non-proprietary Version of Rev 3 to HI-971760 | |
ML18016A866 | 31 March 1999 | Shnpp Operator Training Simulator,Simulator Certification Quadrennial Rept. | Boric Acid Shutdown Margin Emergency Lighting Overspeed trip |
ML18017A893 | 28 February 1999 | Risks & Alternative Options Associated with Spent Fuel Storage at Shearon Harris Nuclear Power Plant. | Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Chernobyl Fuel cladding Power Uprate |
ML18016A853 | 18 February 1999 | Non-proprietary Rev 3 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris SFP 'C' & 'D'. | High Radiation Area Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Depleted uranium Water rod |
ML18016A937 | 30 June 1998 | Technical Rept on Matl Identification of Spent Fuel Piping Welds at Hnp. | |
ML18016A771 | 26 May 1998 | Non-proprietary Rev 2 to HI-971760, Licensing Rept for Expanding Storage Capacity in Harris Spent Fuel Pools 'C' & 'D'. | High Radiation Area Ultimate heat sink Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Water rod |
ML18016A263 | 30 June 1997 | 1997 Automated Inservice Exam of RPV & Adjacent Piping Welds at Shearon Harris Nuclear Plant,Unit 1, Vol 1,final Rept W/Apps | Nondestructive Examination |
ML20217Q275 | 30 June 1997 | CP&L Fitness for Duty Program Performance Data for Period 970101-0630 | Fitness for Duty Blind Performance Test |
ML18022A962 | 30 June 1995 | NPP IPEEE Final Rept. | Hot Short Safe Shutdown Boric Acid High winds Shutdown Margin High Radiation Area Ultimate heat sink Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Finite Element Analysis FLEX Tornado Generated Missile Seismically rugged Design basis earthquake Severe Accident Management Guideline Exemption Request Earthquake Fire Protection Program Fire Watch Scaffolding Weak link Manual Operator Action |
ML18011A904 | 3 March 1995 | Shnpp Operator Training Simulator Certification Quadrennial Rept. | Boric Acid Shutdown Margin Stroke time Emergency Lighting Overspeed trip |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML18010A854 | 9 October 1992 | Flow Calibration Rept Carolina Power & Light Harris Plant. | |
ML18005A852 | 30 November 1988 | Criticality Analysis of Shearon Harris Spent Fuel Racks W/ Ifba Fuel. | |
ML18005A640 | 31 July 1988 | Revised Shearon Harris Nuclear Power Plant Emergency Response Facility Info Sys Verification & Validation Final Rept. | |
ML18022A694 | 31 May 1988 | SPDS Dynamic Operational/Human Factors Evaluation, Final Rept | Safe Shutdown Shutdown Margin Earthquake Fuel cladding Unidentified leakage |
ML18005A418 | 31 March 1988 | Metallurigical Evaluation of EDG Bases from Cp&L,Shearon Harris Nuclear Station. | |
ML18004B827 | 31 January 1987 | Criticality Analysis of Shearon Harris Fuel Racks. | |
ML18004A347 | 23 July 1986 | Chatham County Emergency Response Plan:Unanswered Questions. | Chernobyl |
ML18019B046 | 13 June 1986 | Rev 1 to Analysis for Location of Battery RM SA & SB Eyewash Station & Shower. | Coatings Exclusive Use |
ML18019B008 | 30 April 1986 | Rev 2 to Tdi Diesel Generator Design Review & Quality Revalidation Rept. | Overspeed trip |
ML20203N417 | 30 April 1986 | Rev 2 to Tdi Owners Group App Ii:Generic Maint Matrix & Justifications | Nondestructive Examination Liquid penetrant |
ML18019A793 | 28 April 1986 | Rev 1 to Shearon Harris Nuclear Power Plant Crdr Final Summary Rept. | Hot Short Safe Shutdown Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Coatings Emergency Lighting Earthquake Fire Protection Program Scaffolding Backfit |
ML18019A559 | 4 November 1985 | Predicted Behavior of Containment Bldg During Structural Integrity Test. | |
ML18019A455 | 25 October 1985 | Containment Recirculation Sump Evaluation. | Loop seal |
ML18019A380 | 30 September 1985 | Crdr Final Summary Rept. | Boric Acid Emergency Lighting Earthquake Backfit |
ML18019A383 | 11 September 1985 | Environ Qualification of Mechanical Equipment. | Boric Acid B.5.b |
ML18019A256 | 2 July 1985 | Containment Purge & Vent Valve Operability Review. | |
ML20205B131 | 17 April 1985 | Technical Evaluation Rept of Spds,Shearon Harris Nuclear Power Plant | |
ML18003B098 | 31 March 1985 | Control Room Design Review Summary Rept for Shearon Harris Nuclear Power Plant,Unit 1. | Boric Acid Emergency Lighting Earthquake Backfit |
ML18018B898 | 13 February 1985 | Elimination of Arbitrary Intermediate Break Points in Main Feedwater Sys. | Safe Shutdown Stress corrosion cracking Flow Induced Vibration |
ML18018B895 | 11 February 1985 | Seismic & Dynamic Qualification of Mechanical & Electrical Equipment,Master List, Vols 1 & 2 | |
ML18003B124 | 31 December 1984 | Electrical Separation Analysis. | Fire Barrier Coatings |
ML18018B851 | 17 December 1984 | Emergency Diesel Generator Equipment. | Safe Shutdown Eddy Current Testing Liquid penetrant |
ML18018B852 | 30 November 1984 | Vols 1-4 of Tdi Diesel Generator Design Review & Quality Revalidation Rept. | |
ML20134G162 | 9 November 1984 | Revised Rept of Results of Interviews Conducted W/Cp&L Personnel Re Selected Aspects of Affidavit Submitted by Former CP&L Employee C Van Vo | Affidavit |
ML18018B762 | 31 August 1984 | Rev 7 to Functional Capability of ASME Class 1 Auxiliary Piping Sys. | Finite Element Analysis |
ML18018B694 | 30 April 1984 | Rept on Operability of Pressurizer Safety Relief Valves, PORVs & Electrical Motor Operated Block Valves. | Loop seal Stroke time Operability Determination |
ML18018B632 | 28 March 1984 | Audit Rept, Human Factors Engineering Detailed Control Room Design Review In-Progress Audit. | Backfit |
ML18018B541 | 10 January 1984 | Revised Mgt Capability Rept. | Shutdown Margin Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Earthquake Biofouling Overexposure |
ML18018B434 | 28 October 1983 | Responses to Requests for Addl Info Re Draft SER Open Items 372,63,30,172 & 213 | Shutdown Margin Operating Basis Earthquake Turbine Missile Flow Induced Vibration Overspeed trip |
ML18018B413 | 14 October 1983 | Nonproprietary Table of Control Rod Drive Mechanism (CRDM) 400 Series Stainless Steel Items. | |
ML18018B429 | 30 September 1983 | Analysis of Habitability of Shearon Harris Nuclear Power Plant Emergency Operations Facility. | |
ML18018B510 | 30 September 1983 | Safety Analysis of Shearon Harris Safety Parameter Display Sys. | Boric Acid |
ML18018B430 | 30 September 1983 | Analysis of Habitability of Shearon Harris Nuclear Power Plant Technical Support Ctr. | |
ML18018A652 | 4 August 1983 | Revised Mgt Capability Rept. | Hot Short Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Safe Shutdown Earthquake Post Accident Monitoring Coatings Operating Basis Earthquake Nondestructive Examination Emergency Lighting Exemption Request Earthquake Biofouling Fire Protection Program Scaffolding Backfit Power change Overexposure |
ML18018A483 | 31 January 1983 | Rept on Proposed Neuse Fault. | Earthquake |