Issue date | Title | Topic | |
---|---|---|---|
ML20217A993 | 30 September 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data | |
ML20196H862 | 30 June 1999 | NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept | High Radiation Area Power change |
ML20197G622 | 6 November 1998 | Non-proprietary Rev 7 to HI-971661, Licensing Rept for Reracking of Ja FitzPatrick Sfp | Earthquake Fuel cladding |
ML20155C282 | 30 October 1998 | Non-proprietary Rev 0 to GENE-187-30-1598 Np, CRD Bolting Flaw Evaluation for Ja FitzPatrick Nuclear Power Plant | |
ML20153B561 | 1 September 1998 | Rev 1 to JAF-SE-98-013, RHR & Core Spray Suppression Pool Suction Strainer Replacement | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Non-Destructive Examination Fire Barrier Hydrostatic VT-2 Emergency Lighting Safeguards Contingency Plan Code Reconciliation Control of Heavy Loads Fire Protection Program Power Uprate Failure to Scram |
ML20153B578 | 28 July 1998 | Rev 0 to JAF-SE-98-025, HPCI & RCIC Suppression Pool Suction Strainer Replacement | Safe Shutdown Ultimate heat sink Fire Barrier Emergency Lighting Safeguards Contingency Plan Code Reconciliation Control of Heavy Loads Fire Protection Program Power Uprate |
ML20236X383 | 14 July 1998 | Rev 2 to JAF-RPT-MULTI-02671, Summary of Detailed Evaluation for NRC Generic Ltr 96-06 | Hydrostatic Residual transfer Design basis earthquake |
ML20202G908 | 6 February 1998 | Safety Evaluation Re Amend to License DPR-59 to Revise TS Tables 3.2-2 & 4.2-2 | Fire Protection Program |
ML20236V830 | 31 January 1998 | Review & Evaluation of Historical Fire Protection Licensing Basis Related to Fire Areas Ix,X,Xi,Xv,Xvii & Xviii at Ja FitzPatrick Nuclear Power Plant | Safe Shutdown |
ML20211H086 | 26 September 1997 | Safety Evaluation for Proposed TS Changes to ASME Section XI Surveillance Testing | Stroke time Scram Discharge Volume Fuel cladding Offsite Circuit Fire Protection Program Grace period |
ML20217J009 | 21 July 1997 | Rev 4 to JAF-RPT-DHR-02413, Evaluation of Decay Heat Removal Sys | Safe Shutdown Time to boil Internal Flooding Tornado-Generated Missile Abnormal operational transient Design basis earthquake Earthquake Power Uprate |
ML20217J018 | 18 July 1997 | Non-proprietary Version of Rev 3 to Licensing Rept for Reracking of Ja FitzPatrick Spent Fuel Pool | |
ML20135E377 | 30 November 1996 | Evaluation of Ultrasonic Indications in RPV Closure Head Weld VC-TH-1-2 at James a Fitzpatrick Nuclear Power Plant | |
ML20129F900 | 18 July 1996 | Nonproprietary Ja FitzPatrick Nuclear Power Plant ATWS Analysis for Recirculation Pump Trip (RPT) Setpoint Changes | |
ML20116D898 | 16 July 1996 | Installation & Acceptance Testing of Dhrs | Safe Shutdown Fire Barrier Abnormal operational transient Fire Protection Program |
ML20116D892 | 16 July 1996 | Evaluation of Dhrs | Safe Shutdown Ultimate heat sink Time to boil Internal Flooding Tornado-Generated Missile Abnormal operational transient Design basis earthquake Earthquake Power Uprate |
ML20116D902 | 16 July 1996 | Use of Dhrs in Various Plant Modes & Configurations | Safe Shutdown Abnormal operational transient Earthquake |
ML20094M059 | 30 September 1995 | Ja FitzPatrick Nuclear Power Plant USI A-46 Seismic Evaluation Rept | |
ML20094M048 | 30 September 1995 | Ja FitzPatrick Nuclear Power Plant Safe Shutdown Equipment & Relay Evaluation for USI A-46 | Safe Shutdown Reactor Vessel Water Level Safe Shutdown Earthquake Probabilistic Risk Assessment Squib Seismically rugged Scram Discharge Volume Severe Accident Management Guideline Earthquake |
ML20094M039 | 30 September 1995 | Ja FitzPatrick Nuclear Power Plant USI A-46 Project Summary | Safe Shutdown Earthquake |
ML20094B678 | 1 September 1995 | Containment Sys Surveillance Test Extensions, for Ja Fitzpatrick-24 Month Operating Cycle | High winds Coatings Design basis earthquake Fuel cladding Grace period |
ML20094R700 | 18 August 1995 | SLC Surveillance Extensions | Squib |
ML20087K743 | 31 May 1995 | Jaf - 24 Month Operating Cycle Nuclear Steam Supply Sys Surveillance Test Improvements | Safe Shutdown Packing leak Temporary Modification Missed surveillance |
ML20081K079 | 31 March 1995 | Ja FitzPatrick Nuclear Power Plant Core Shroud Vertical & Top Guide Support Ring Radial Weld Flaw Evaluation Screening Criteria | |
ML20080P976 | 28 February 1995 | Response to NUREG-0737,III.D.3.4 CR Habitability for Jafnpp | |
ML20081K069 | 20 December 1994 | Nonproprietary Version of Cert Testing of Type XM-19 in Simulated BWR Environ | |
ML20077A263 | 30 November 1994 | Response to NUREG-0737,III.D.3.4,Control Room Habitability for Ja FitzPatrick Nuclear Power Plant | High winds Tornado Missile |
ML20077A559 | 16 November 1994 | Nonproprietary Ja FitzPatrick Cycle 12 ATRIUM-10A Lead Fuel Assembly Licensing Evaluation | Shutdown Margin Anticipated operational occurrence |
ML20077A563 | 16 November 1994 | Nonproprietary Ja FitzPatrick ATRIUM-10A Design Description | |
ML20080B944 | 27 October 1994 | Shroud Safety Assessment | Safe Shutdown Earthquake |
ML20076H387 | 11 October 1994 | Shroud Safety Assessment | Safe Shutdown Earthquake Feedwater Controller Failure |
ML20092H559 | 20 September 1994 | 24 Month Operating Cycle Auxiliary Electrical Sys Surveillance Test Extensions | Safe Shutdown |
ML20072K717 | 22 August 1994 | Probabilistic Risk Assessment of Effects of Postulated Events w/360 Degree Shroud Through-Wall Crack | Reactor Vessel Water Level Weld Overlay Probabilistic Risk Assessment Design basis earthquake Earthquake |
ML17059A361 | 6 July 1994 | Emergency Action Level Verification & Validation Rept. | Earthquake |
ML20087K747 | 27 June 1994 | 24 Month Operating Cycle Svc Water Sys Surveillance Test Improvements | Safe Shutdown Ultimate heat sink |
ML17311A018 | 13 May 1994 | New York State EAL Upgrade Project Verification & Validation Rept. | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Safeguards Contingency Plan Battery sizing Earthquake Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Unidentified leakage |
ML20247F971 | 30 April 1994 | Rept EP 91-28, Eastern Lake Ontario On-Shore Flow Field Study | High winds Mission time |
ML20126H475 | 22 December 1992 | Rev 0 to Alternate Electrical Separation Criteria | |
ML20126H472 | 22 December 1992 | Rev 0 to Evaluation of Apparent Electrical Separation Anomalies | |
ML20115J387 | 26 October 1992 | Safe Shutdown Capability Reassessment,10CFR50,App R | Safe Shutdown |
ML20087K726 | 21 July 1992 | Jaf - 24 Month Operating Cycle Shock Suppressors (Snubbers) Surveillance & Maint Extensions | Earthquake |
ML20086T578 | 16 December 1991 | Results Improvement Program | Fitness for Duty High Radiation Area Commercial Grade Dedication Weld Overlay Temporary Modification Zebra Mussel Fire Protection Program |
ML20086U021 | 26 November 1991 | Vols 1 & 2 of Qualification of Inconel 82 Temperbead Weld Overlay Repair W/Reduced Preheat & No Post Weld Heating W/Appendices | Weld Overlay |
ML20087K755 | 12 November 1991 | 24 Month Operating Cycle CRD Surveillance Test Extensions | Shutdown Margin Stroke time Scram Discharge Volume |
ML20087A029 | 9 October 1991 | Rev 1 to Ja Fitzpatrick Nuclear Power Plant Evaluation of Suppression Chamber & Main Steam Safety Relief Lines for Simultaneous Actuation of All Safety Relief Valves Set at 1,145 Psig | |
ML20091C247 | 30 July 1991 | Engineering Assessment Turbine Bldg Fire Area Ie,Ja Fitzpatrick Nuclear Power Plant | Safe Shutdown Exemption Request |
ML20091C257 | 30 July 1991 | Engineering Assessment Battery Room Corridor,Ja Fitzpatrick Nuclear Power Plant | Safe Shutdown |
ML20076C419 | 12 July 1991 | Suppl a to Holtec Rept HI-89399 Re Mod to Util Application for Storage Capacity Expansion of Spent Fuel Pool to Incorporate Dimensional Changes in Module Layout | Safe Shutdown Earthquake Fuel cladding |
ML20247F948 | 30 June 1991 | Final Task Rept Review of Formulas & Observation of Thermal Internal Boundary Layers in Shoreline Environments | |
ML20247F910 | 31 December 1990 | Final Task Rept Fumigation Frequency Analysis:Nine Mile Point Mile Point Nuclear Power Station,Lycoming,Ny |