24 Month Operating Cycle Svc Water Sys Surveillance Test Improvements
ML20087K747
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/27/1994
From: Kaucher J, Schillinger F, Wittich W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20087K720 List:
References
JAF-RPT-SWS-015, JAF-RPT-SWS-01538, JAF-RPT-SWS-15, JAF-RPT-SWS-1538, NUDOCS 9508240125
Download: ML20087K747 (11)


Text

q. m 4 ,. l

.g j y i 1

'b; I

i

/

P FITZPATRICK - 24 MONTH OPERATING CYCLE SERVICE WATER SYSTEM SURVEILLANCE TEST IMPROVEMENTS JAF-RPT-SWS-01538 l

FOR INFORMATION ONLY June, 1994 h Rd 74 Prepared by: /lld .

F. Scffillinger U Date  !

Senid Engineer Nuclear O&M 1

s Reviewed by: d 2r /

W. Wittich / Date l Supervising Engineer '

Nuclear Operations & Safety Ebasco Services Inc.

l l

Approved by: U d ' 3 7' [! '

J. KaucherV Date l Director Nuclear ~O&M 3?ST!_M:_._. MM

? 5C[$Q% #A7 #

7 -i t - T'+ i QA CAT: l M )} v.. FILS#:

l COh1P PI'INTOUT LOC:  !

9508240125 950816 1 PDR ADDCK 05000333 p PDR

n z--

6' 3:4 l

f .

L 24 MONTH OPERATING-CYCLE-SERVICE WATER SYSTEM SURVEILLANCE TEST EXTENSIONS TABLE OF CONTENTS l^

I. EXECUTIVE

SUMMARY

1-I II. LPURPOSE. 1 III. . SYSTEM DESCRIPTION 1 IV. SURVEILLANCE TEST EVALUATIONS 4 V.

SUMMARY

AND CONCLUSIONS 6 VI. REFERENCES- 7 i ATTACHMENT A TECHNICAL SPECIFICATIONS CliANGES 8 l

i

?

)

)

l l

\

'l i

.i I

t

y_,., '-

s.  ;

1.- .

24 MONTH OPERATING CYCLE SERVICE WATER SYSTEM SURVEILLANCE TEST EXTENSIONS i

I. Executive Summary I The Fitzpatrick plant .will be operating on a 24 month' i operating cycle. This longer cycle length has a direct effect j

on surveillance testing and maintenance activities that are  ;

currently performed on an 18 month or refuel outage basis.

At Fitzpatrick, the Service Water System (SWS) is routinely inspected, tested, and maintained to provide high reliability.

This system is subject to tests which verify the operability' of two subsystems; the Emergency Service Water System (ESW),

and the Residual Heat Removal Service Water System (RHRSW).

Test frequencies are mandated by the plants' technical specifications, operational requirements, inservice inspection schedules, IST Program, and Generic Letter 89-13.

This study evaluates the changes to surveillance requirements to support a nominal twenty four month operating cycle. 1 Justification is provided, where appropriate, to support test extensions.

Our evaluations conclude that one of two current surveillance test intervals can be-safely extended to support'a nominal 24 month operating cycle.

II. PurDose j l

The Fitzpatrick plant will be . operating .on a 24 month operating cycle. To avoid either an 18 month surveillance outage or an' extended mid-cycle outage, changes are required to the Service Water System surveillance test intervals-prescribed by the Fitzpatrick Technical Specifications.

Substantiating the impacts of the longer cycle length on the SWS surveillance, and test activities requires a comprehensive review of the system, its individual components, and the ,

integrated effect of all test activities on operability. I III. System Description l

The Service Water System consists of three subsystems: the i Emergency Service Water System, the Normal Service Water System, and the RHR Service Water System. The three systems transfer heat from selected plant components to Lake Ontario during various modes of operation. Specific functions are i described below.

1 l

t .

24 MONTH OPERATING CYCLE SERVICE WATER SYSTEM SURVEILLANCE TEST EXTENSIONS A. Eneroency Service Water The Emergency Service Water System (ESW) is a safety related system. It provides heat removal for Emergency Core Cooling System components and other equipment essential to safe reactor shutdown.

The system consists of two independent supply loops, each supplied by a 100% (loop capacity), motor driven, vertical wet

pit pump. Each pump takes suction from a separate bay in the i

screenwell and discharges through independent strainers into separate supply headers. The system also includes five Movs (two pump discharges, two test valves, and one cross-connect) .

Each train of the ESW system is required to supply raw water l cooling to one train of the following safety related loads:

I

  • EDG Jacket Water Heat Exchangers
  • Electric Bay Unit Coolers
  • Cable Tunnel /Switchgear Room Coolers
  • Control Room and Relay Room Air Handling Units
  • Crescent Area Unit Coolers Each train also has the caMoility to supply raw water to several non-safety related loads.

The ESW system is provided with a keep-full system which maintains the system full of water when the pumps are not running. Makeup water is supplied by the SWS.

Twin basket strainers are located at each pump discharge to prevent plugging of component coolers. DP alarms annunciate in the CR on high strainer dp. System flow data can be displayed on the EPIC.

Normally, the ESW System is maintained in standby condition l and operates automatically in response to an indicated loss of RBCLCW, or upon start of one or more Emergency Diesel Generator.

B. Normal Service Water The Normal Service Water System (SWS) is not a nuclear safety related system. It acts as the ultimate heat sink for the TBCLCW (Turbine Building Closed Loop Cooling Water System) and the RBCLCW (Reactor Building Closed Loop Cooling Water System) during all planned operations. The system also provides a heat sink for plant AC units, mechanical vacuum pump and vacuum priming pump seal water coolers, and the steam jet air 2

  • 1

. i l

3 i i 24 MONTH OPERATING CYCLE SERVICE WATER SYSTEM SURVEILLANCE TEST EXTENSIONS -!

ejectors precooler. Additionally, the system supplies water. I to the traveling screen water wash nozzles, backup seal water

'for the Service Water and Circulating Water pumps, backup '

motor bearing ' cooling water to the Service Water pumps, Condenser Vacuum Priming System Drain Tank makeup, and the Makeup Water Treatment System.

Three motor driven, 50% (system capacity), vertical wet pit pumps, arranged in parallel,-take suction from the screenwell and discharge through separate automatic backwash strainers to a common supply header.

Normally, two pumps operate continuously. The running pump (s)  !

are operated manually from the CR. The standby pump starts automatically on low service water header pressure or on trip of a running pump.

C. Residual Heat Removal Service Water System  !

The Residual Heat Removal Service Water (RHRSW) System is a. .

safety related system. It acts as the ultimate heat sink for-the RHR- heat exchangers during normal and post accident conditions. The system also provides an additional source of '

water for post-accident containment flooding.

Two 100% capacity independent loops are provided for ,

redundancy. Only one loop is necessary for safe shutdown.  :

Each loop consists of two motor driven vertical pumps, one '

twin basket strainer, and three MOVs (one HX outlet isolation, and two cross-connect isolations).

A twin basket strainer is located downstream of each pump pair, in a common supply header, to prevent _ plugging of system components. DP alarms annunciate in the CR on high strainer  ;

dp.

Total flow through the inlet header to each RHR heat exchanger '

is monitored and indicated in the CR.

Normally the system is maintained in a standby mode. The system is manually actuated in the event of a LOCA.  ;

3 i

c'W -~

24 MONTH OPERATING CYCLE SERVICE WATER SYSTEM SURVEILLANCE TEST EXTENSIONS IV. Surveillance Test Evaluations A. Surveillance Tests The operability of systems and components required by plant safety analyses is established by the surveillance requirements contained in the JAF Technical Specifications.

Service Water System surveillance and calibration activities were thoroughly. evaluated to determine the impacts of a 24 month operating cycle. The longer cycle length requires an extension. of the ESW Logic System Functional Test and Simulated Automatic Actuation Test (ST-08E) and the RHRSW Pump Motor Cooling Water Solenoid Valve and RHRSW Loop Crosstie Drain Scienoid Valve Test (ST-2AA).

B. Surveillance Test Extension Justifications  ;

The decision to extend surveillance test intervals considered the function of the test in determining overall system availability.

This consideration was applied to an evaluation of Fitzpatrick l Service Water System (SWS) surveillance tests. i l

The following Service Water System surveillance tests are presently required to be performed once per operating cycle (18 months) : l

.i

1. ST-06.E ESW Locic' System ' Functional Test and Simulated I Automatic Actuation Test (Rev 141. j l

The purpose of this procedure is to demonstrate RBCLC l pump discharge header pressure switches and ESW Lockout '

Matrix Relays will cause ESW pumps to start and RBCLC and ESW motor operated valves (MOVs) .to reposition to an ESW injection lineup.

Ten tests (1987 to 1993) were reviewed. Two problems were noted. Both problems dealt with contacts 3 & 4, on ESW Lockout Matrix Logic Relay 63A1ESWB04, failing to operate. These contacts are required to operate and-automatically open 46MOV-101B (ESW System B Injection Valve). A work request '(71435)- was written to troubleshoot this problem. The relay was removed from service, tested, and operated correctly. A decision was made to replace the relay with a new one. Surveillance testing frequency was increased to quarterly. Seven I consecutive tests were performed satisfactorily. The 4

p

~~

j i

L . ?.  :

24 MONTH OPERATING CYCLE SERVICE WATER SYSTEM '

SURVEILLANCE TEST EXTENSIONS I l- i testing frequency was returned to once per operating '

cycle. '

There are no documented failures of similar (General Electric HFA) relays used in this system. All other system logic functions operated satisfactorily during the test periods reviewed. The November, 1988 test failure appears to be a random and isolated occurrence. The GE' HFA relays have a history of good performance at the i Fitzpatrick Plant. Additionally, HFA relays are checked .

on-line during channel functional testing of other ,

systems (eg. , RPS and ECCS instrument channel functional tests) and any common cause type failures of these relays would be detected and investigated.

Extension of this test to 24 months will not. negatively affect system performance or reliability because:

e the relays used by this logic matrix have proven to be reliable as documented by numerous tests, and f

e all pumps, and valves operated by this system.are frequently tested with the plant on line (flow rate  ;

tests are performed quarterly, pump and MOV l operability is checked monthly, instrumentation is >

checked both daily and quarterly and calibrated "

quarterly).

Note: ISP-32 "RHR and RHR Service ~ Water. Flow Loop A and B Calibration" and ISP-40 " Remote Shutdown RHR B and RHR Service' Water Flow -Instrument Calibration" will be covered by the Accident monitoring instrumentation .,

evaluation. -l l

2. ST-2AA RHRSW Pumo Motor Coolina Water Solenoid Valve l and RHRSW Loon Crosstie Drain Solenoid Valve ~

Test (IST) (Rv 2) ,

'l' The purpose of this procedure is to demonstrate the operability of the RHRSW loop crosstie drain solenoid  !

valves and that each RHRSW pump motor cooling water i solenoid valve is capable of passing greater than or i equal to 5 gpm. I 2

The RHRSW Loop Crosstie Drain Solenoid valves (10SOV-150A

& B) are designed to keep the line between " heir . i

. respective RHRSW to RHR crosstie MOVs (10MOV-148A & B and 149A & B) drained during normal operation. The MOVs are 5

1 4

i

24 MONTH OPERATING CYCLE SERVICE WATER SYSTEM SURVEILLANCE TEST EXTENSIONS normally closed and the SOVs are normally open. When it is necessary to cross connect the RHRSW and RHR systems by opening the MOVs, the respective loop drain SOV automatically closes (allowing the line to fill) . When the MOVs are closed, the SOV opens and drains the line.

The purpose of keeping this line drained is an effort to prevent RHRSW (lake water) from leaking into the RHR system during normal operations. In addition to ensuring Sov operability, drainage flow is monitored to ensure the drain line is not plugging up with silt (JSEM-92-072).

It was agreed in a memo (JTS-92-0751) that observation of drainage flow would be required only once per operating cycle. It appears that these two SOVs continue to clog and block drainage of this line. A modification is scheduled for the 1994 refueling outage to solve this problem. Based on the probability that these solenoids are continuing to clog whenever RHRSW is flowing through them, the current 18 month frequency is probably not sufficient to ensure that they are performing the function they were installed to perform.

I Pending approval and implementation of this modification, extension of this portion of the test is not justified.

The RHRSW Pump Motor Cooling Water Solenoid Valves (10SOV-101A, B, C, & D) are designed to provide a continuous flow path for RHRSW pump bearings when the pumps are running. The SOVs are normally closed, and open automatically when their respective pump is started.

Seven tests were reviewed, all performed during 1992, some for post maintenance testing. Test results were satisfactory in all cases.

Present information indicates that extending this portion of the test to 24 months will not have a negative impact on RHRSW system performance or reliability.

V. Summary and Conclusions

1. To support the 24 month fuel cycle, extension of the ESW Logic System Functional Test and Simulated Automatic Actuation Test (ST-8E) can be safely extended for the following reasons: a) a review of past performance indicates that the components making up the logic system are reliable, b) on-line testing and calibration of individual components actuated by this system is performed and will provide early indication of functional degradation.

6

7 j i

- t 24 MONTH OPERATING CYCLE SERVICE WATER SYSTEM >

SURVEILIANCE TEST EXTENSIONS ,

2. The'RHRSW Pump Motor Cooling Water' Solenoid Valve and RHRSW; Loop Crosstie Drain Solenoid Valve Test (ST-2AA) should not' be ,

extended because a review of past performance indicates that  !

there is a probability that the RHRSW Loop Crosstie Drain  !'

Solenoid Valves will clog each time flow is initiated through the valves. Potential clogging of these valves may occur '

during performance of ST-2A which is performed quarterly.

There is no requirement to check flow through these lines  !

during this test. JAF should reevaluate- adding this requirement to ST-2A until a modification can remedy the  ;

clogging problem. '

3. Based on this review one technical specification change will be required. Section 4.11.D.l.a, under the column labeled frequency, should be changed from "Each operating cycle" to l "Once every 24 months." Refer to the markup page contained in {

Attachment A.  !

VI. JLeferences ,

1. James A. Fitzpatrick Nuclear Power Plant Final safety:

Analysis. I

2. James A. Fitzpatrick Nuclear Power Plant Technical l Specifications. '
3. DBD-046, Rev. . O, James A. Fitzpatrick Nuclear Power Plant ,

Design Bases Document for the Normal Service Water, Emergency '

Service Water, and Residual Heat Removal Service Water '

systems. I

4. JSEM-92-072, Investigation of Silt Buildup in RHRSW to RHR l Crosstie. ,
5. JTS-92-0751, Observation of Drainage Flow From the RHRSW to  ;

RHR Crosstie.

6. ST-08E, RV 14, ESW Logic System Functional Test and Simulated Automatic Actuation Test.
7. ST-2AA, Rv 2, RHRSW Pump Motor Cooling Water Solenoid Valve and RHRSW. Loop Crosstie Drain Solenoid Valve Test (IST).
8. ESK-11AC, Elementary Diagram - 125VDC Circuit Lockout Matrix .;

for ESW System MOV. 1 7

1 l

, _.g -

.s. - -

p ,

7 -s r- 'l f

,, e 24 MONTH OPERATING CYCLE

' SERVICE WATER' SYSTEM  !

.S_U,]lVEILLANCE TEST EXTENSIONS 1

i i

h j.

l

-i e

ATTACHMENT A  !

TECHNICAL SPECIFICATION CHANGES l 0

K i

s 5

l t

6 l

l I

l i

i l

4 1

8

JAFNPP

,(cost'd) 4.11 (Cont *d)

.D. Emeramacy Earvian Matar Eystan D. " rammer Earvice u=*ar Evne==

c

1. To ensure adegeste eh lpment and area 1. Serve 111ance of the ESN system shall be 4 coollag, both BSt systems shall he operable performed as follows:

when the requiressets of specification k 3.5.A and 3.5.3 meet he satis- Itam Frequency fled, escept as apoolflod below in specifi- f cation 3.11.D.3. a. Simulated ac

( , 0 i f '.

  • j

' N, Automatic 4 ra i p g/t T y j }

Actuation cyc ,

~ / i 4

Test s

$ ',l #3rN <)' '

b. Flow Bate Once/

Test - ESW pumps 3 months fj shall deliver at ',

least 3,250 gym T agaleet a system $

head correspondlag to a total pump k.

4 head of A._80 poi, as determined from the pump certifi-cation curve by

, measuring the pump shutoff head which p i shallhed117pai. )

l i

c. Pump Operability ~ Once/ month .---

) ;l l

4. Motor Operated once/ month i l

Valves '

i i I

' mondmext No. , 134 l

240

\