Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20211M298 | 6 August 1999 | Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 | |
ML20210J939 | 30 June 1999 | CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 | Temporary Modification |
ML20205R570 | 14 April 1999 | Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys | Safe Shutdown Fire Barrier Design basis earthquake Earthquake Fire Protection Program Backfit |
ML20151Q121 | 14 August 1998 | Rev 0 to Control of Hazard Barriers | |
ML20199J539 | 2 February 1998 | CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 | Temporary Modification |
ML20198Q718 | 24 October 1997 | Rev 5 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Systems | Safe Shutdown Fire Barrier Design basis earthquake Earthquake Fire Protection Program Backfit |
ML20137D360 | 20 March 1997 | Engineering Self-Assessment Rept | Safe Shutdown Ultimate heat sink Probabilistic Risk Assessment Temporary Modification Maintenance Rule Program |
ML20129F699 | 25 October 1996 | Justification for SPC 1986 LBLOCA Evaluation Model W/Interim Adjustment for Non-Physical Behavior | |
ML20100F276 | 13 February 1996 | Rev 0 of Engineering Rept, Resolution of NRC GL 95-07 'Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves.' | Safe Shutdown Stroke time Anticipated operational occurrence |
ML20116M402 | 1 February 1996 | Commitment Matl Change Evaluation Rept 0001 for 941101- 960201 | Fire Watch |
ML20095K541 | 18 December 1995 | Nonproprietary Small Break LOCA Analysis Methodology | Loop seal |
ML20094P782 | 22 November 1995 | CPSES Risk-Based IST Program Risk Ranking Determination Study Summary Rept | Boric Acid Internal Flooding Probabilistic Risk Assessment Incorporated by reference Earthquake |
ML20094P797 | 22 November 1995 | Rev 0 to CPSES Risk-Based IST Program Risk Ranking Determination Study | |
ML20094P423 | 29 September 1995 | Pyrolysis Gas Chromatography Analysis of 10 Thermo-Lag Fire Barrier Samples | Fire Barrier |
ML20085N291 | 21 June 1995 | Individual Plant Exam of External Events for Severe Accident Vulnerabilities | Hot Short Safe Shutdown High winds Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Emergency Lighting Tornado-Generated Missile Tornado Generated Missile Seismically rugged Design basis earthquake Earthquake Continuous fire watch Fire Protection Program Fire Watch |
TXX-9432, Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity | 9 December 1994 | Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity | |
ML20097A382 | 19 August 1994 | Individual Plant Exam of External Events,Seismic,Cpses | Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Slow transfer Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Emergency Lighting FLEX Tornado Generated Missile Seismically rugged Design basis earthquake Earthquake |
ML20069M876 | 10 June 1994 | Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations | |
ML20064M608 | 21 March 1994 | Engineering Rept Evaluation of Thermo-Lag Fire Barrier Sys | Safe Shutdown Fire Barrier FLEX Design basis earthquake Earthquake Fire Protection Program Backfit |
ML20059F543 | 5 October 1993 | Engineering Rept, Evaluation of Fir Endurance Test Results Related to Cable Functionality in 1-1/2 & 2 Inch Conduits | Safe Shutdown Fire Barrier |
ML18010B084 | 5 May 1993 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Safe Shutdown Boric Acid Shutdown Margin Loop seal Stroke time Temporary Modification Stress corrosion cracking Liquid penetrant Overspeed trip |
ML20127K812 | 19 January 1993 | Rev 0,to Evaluation of Unit 2 Thermo-Lag Configurations | Safe Shutdown Fire Barrier FLEX Backfit |
ML20126G212 | 23 December 1992 | Rev 2 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier Systems | Safe Shutdown Fire Barrier Design basis earthquake Earthquake Fire Protection Program Backfit |
ML20126C042 | 18 December 1992 | Suppl 6 to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station | Emergency Lighting |
ML20126A362 | 15 December 1992 | Rev 3 to Receipt,Dispensing,Quality & Insp Requirements for Thermo-Lag Fire Barrier Matls | Fire Barrier |
ML18010A952 | 30 November 1992 | NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216. | Nondestructive Examination Liquid penetrant |
ML20116C951 | 27 October 1992 | Individual Plant Exam Submittal:Comanche Peak Steam Electric Station Vol II:Back-End Analysis | |
ML20115D224 | 29 September 1992 | Rev 1 to HI-92880, Criticality SE of Comanche Peak Fuel Storage Facilities W/Fuel of 5% Enrichment | Fuel cladding Flow Induced Vibration |
ML20127C829 | 8 September 1992 | Rev 1 to Interim Engineering Rept, Evaluation of Thermo-Lag Fire Barrier Sys | Safe Shutdown Fire Barrier Fire Protection Program Backfit |
ML20114B805 | 1 September 1992 | Suppl 5 to Human Factors Control Room Design Review of Comanche Peak Steam Electric Station | Boric Acid |
ML20114C610 | 31 August 1992 | Individual Plant Exam Comanche Peak Steam Electric Station Vol 1:Front-End Analysis | Safe Shutdown Boric Acid Slow transfer Internal Flooding Probabilistic Risk Assessment Emergency Lighting |
ML20105A782 | 14 August 1992 | Engineering Rept on Thermo-Lag 330-1 Fireproofing Coating Thicknesses Required for 1 & 2 Hour Fire Ratings for Various Structural Steel Members Used by Texas Utils Svcs,Inc | Coatings |
ML20105A847 | 6 August 1992 | Rev 0 to Comanche Peak Steam Electric Station Unit 2 Engineering Bwip Check Valve 2AF-0083 Failure Investigation | |
ML20116C962 | 16 July 1992 | Review of IPE Level 2 Draft Repts for Cpses | Mission time Slow transfer Internal Flooding |
ML20078H158 | 19 June 1992 | CPSES Thermo-Lag Barrier Applications Thermo-Lag Fire Test Conduit & J-Box Test Assemblies. Preliminary Test Results | |
ML20095H241 | 13 April 1992 | Validation Efforts for Comanche Peak Steam Electric Station Unit 2 | Safe Shutdown Non-Destructive Examination Fire Barrier Safe Shutdown Earthquake |
ML20094P337 | 26 March 1992 | Control Room Simulator 10CFR55 Certification Initial Rept | |
TXX-9200, RHR Line Summary Rept | 23 March 1992 | RHR Line Summary Rept | |
ML20086E386 | 31 October 1991 | Pressurizer Surge Line Transient Justification | |
ML20079D048 | 21 June 1991 | Engineering Rept, Testing & Analysis of Commercial-Grade Swing Arms in Borg-Warner Check Valves, June 1991 | Finite Element Analysis Liquid penetrant |
ML20217C460 | 31 May 1991 | Reactivity Anomaly Events Methodology | Boric Acid Shutdown Margin Stroke time Rod Drop Event Fuel cladding |
ML20077E027 | 31 May 1991 | Methodology for Reactor Core Response to Steamline Break Events | Boric Acid Shutdown Margin Anticipated operational occurrence |
ML20073Q829 | 17 May 1991 | Small Break LOCA Analysis Methodology | Loop seal |
ML20084V140 | 31 March 1991 | Safety Evaluation for Operation of Comanche Peak Unit 1 W/ Positive Moderator Temp Coefficient | Shutdown Margin |
ML20079D057 | 31 March 1991 | Final Rept on Analysis of Check Valve Swing Arms, Mar 1991 | Liquid penetrant |
ML20066F433 | 31 January 1991 | Draft Analysis of Flow Stratification in Surge Line of Comanche Peak Reactor | |
ML20066L069 | 31 December 1990 | Large Break LOCA Analysis Methodology | |
ML20066B239 | 31 December 1990 | Control Rod Worth Analysis | |
ML20067B129 | 24 December 1990 | Suppl 1 to TUE-1 DNB Correlation | |
ML20062D904 | 12 November 1990 | Unit One Loose Parts Monitoring Sys Special Rept |