 Issue dateTitleTopic
ML20211M2986 August 1999Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1
ML20210J93930 June 1999CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630Temporary Modification
ML20205R57014 April 1999Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier SysSafe Shutdown
Fire Barrier
Design basis earthquake
Earthquake
Fire Protection Program
Backfit
ML20151Q12114 August 1998Rev 0 to Control of Hazard Barriers
ML20199J5392 February 1998CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801Temporary Modification
ML20198Q71824 October 1997Rev 5 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier SystemsSafe Shutdown
Fire Barrier
Design basis earthquake
Earthquake
Fire Protection Program
Backfit
ML20137D36020 March 1997Engineering Self-Assessment ReptSafe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Temporary Modification
Maintenance Rule Program
ML20129F69925 October 1996Justification for SPC 1986 LBLOCA Evaluation Model W/Interim Adjustment for Non-Physical Behavior
ML20100F27613 February 1996Rev 0 of Engineering Rept, Resolution of NRC GL 95-07 'Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves.'Safe Shutdown
Stroke time
Anticipated operational occurrence
ML20116M4021 February 1996Commitment Matl Change Evaluation Rept 0001 for 941101- 960201Fire Watch
ML20095K54118 December 1995Nonproprietary Small Break LOCA Analysis MethodologyLoop seal
ML20094P78222 November 1995CPSES Risk-Based IST Program Risk Ranking Determination Study Summary ReptBoric Acid
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
Earthquake
ML20094P79722 November 1995Rev 0 to CPSES Risk-Based IST Program Risk Ranking Determination Study
ML20094P42329 September 1995Pyrolysis Gas Chromatography Analysis of 10 Thermo-Lag Fire Barrier SamplesFire Barrier
ML20085N29121 June 1995Individual Plant Exam of External Events for Severe Accident VulnerabilitiesHot Short
Safe Shutdown
High winds
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Emergency Lighting
Tornado-Generated Missile
Tornado Generated Missile
Seismically rugged
Design basis earthquake
Earthquake
Continuous fire watch
Fire Protection Program
Fire Watch
TXX-9432, Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity9 December 1994Rev 0 to CPSES Fuel Storage Licensing Rept,Cpses Expansion of Spent Fuel Storage Capacity
ML20097A38219 August 1994Individual Plant Exam of External Events,Seismic,CpsesSafe Shutdown
Boric Acid
Ultimate heat sink
Fire Barrier
Slow transfer
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Emergency Lighting
FLEX
Tornado Generated Missile
Seismically rugged
Design basis earthquake
Earthquake
ML20069M87610 June 1994Engineering Rept Evaluation of Unit 1 & Unit 2 Thermo-Lag Configurations
ML20064M60821 March 1994Engineering Rept Evaluation of Thermo-Lag Fire Barrier SysSafe Shutdown
Fire Barrier
FLEX
Design basis earthquake
Earthquake
Fire Protection Program
Backfit
ML20059F5435 October 1993Engineering Rept, Evaluation of Fir Endurance Test Results Related to Cable Functionality in 1-1/2 & 2 Inch ConduitsSafe Shutdown
Fire Barrier
ML18010B0845 May 1993NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216.Safe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Stroke time
Temporary Modification
Stress corrosion cracking
Liquid penetrant
Overspeed trip
ML20127K81219 January 1993Rev 0,to Evaluation of Unit 2 Thermo-Lag ConfigurationsSafe Shutdown
Fire Barrier
FLEX
Backfit
ML20126G21223 December 1992Rev 2 to ER-ME-067, Evaluation of Thermo-Lag Fire Barrier SystemsSafe Shutdown
Fire Barrier
Design basis earthquake
Earthquake
Fire Protection Program
Backfit
ML20126C04218 December 1992Suppl 6 to Human Factors Control Room Design Review of Comanche Peak Steam Electric StationEmergency Lighting
ML20126A36215 December 1992Rev 3 to Receipt,Dispensing,Quality & Insp Requirements for Thermo-Lag Fire Barrier MatlsFire Barrier
ML18010A95230 November 1992NRC Licensing Submittal Review of Licensing Conditions Imposed by NUREG-1216.Nondestructive Examination
Liquid penetrant
ML20116C95127 October 1992Individual Plant Exam Submittal:Comanche Peak Steam Electric Station Vol II:Back-End Analysis
ML20115D22429 September 1992Rev 1 to HI-92880, Criticality SE of Comanche Peak Fuel Storage Facilities W/Fuel of 5% EnrichmentFuel cladding
Flow Induced Vibration
ML20127C8298 September 1992Rev 1 to Interim Engineering Rept, Evaluation of Thermo-Lag Fire Barrier SysSafe Shutdown
Fire Barrier
Fire Protection Program
Backfit
ML20114B8051 September 1992Suppl 5 to Human Factors Control Room Design Review of Comanche Peak Steam Electric StationBoric Acid
ML20114C61031 August 1992Individual Plant Exam Comanche Peak Steam Electric Station Vol 1:Front-End AnalysisSafe Shutdown
Boric Acid
Slow transfer
Internal Flooding
Probabilistic Risk Assessment
Emergency Lighting
ML20105A78214 August 1992Engineering Rept on Thermo-Lag 330-1 Fireproofing Coating Thicknesses Required for 1 & 2 Hour Fire Ratings for Various Structural Steel Members Used by Texas Utils Svcs,IncCoatings
ML20105A8476 August 1992Rev 0 to Comanche Peak Steam Electric Station Unit 2 Engineering Bwip Check Valve 2AF-0083 Failure Investigation
ML20116C96216 July 1992Review of IPE Level 2 Draft Repts for CpsesMission time
Slow transfer
Internal Flooding
ML20078H15819 June 1992CPSES Thermo-Lag Barrier Applications Thermo-Lag Fire Test Conduit & J-Box Test Assemblies. Preliminary Test Results
ML20095H24113 April 1992Validation Efforts for Comanche Peak Steam Electric Station Unit 2Safe Shutdown
Non-Destructive Examination
Fire Barrier
Safe Shutdown Earthquake
ML20094P33726 March 1992Control Room Simulator 10CFR55 Certification Initial Rept
TXX-9200, RHR Line Summary Rept23 March 1992RHR Line Summary Rept
ML20086E38631 October 1991Pressurizer Surge Line Transient Justification
ML20079D04821 June 1991Engineering Rept, Testing & Analysis of Commercial-Grade Swing Arms in Borg-Warner Check Valves, June 1991Finite Element Analysis
Liquid penetrant
ML20217C46031 May 1991Reactivity Anomaly Events MethodologyBoric Acid
Shutdown Margin
Stroke time
Rod Drop Event
Fuel cladding
ML20077E02731 May 1991Methodology for Reactor Core Response to Steamline Break EventsBoric Acid
Shutdown Margin
Anticipated operational occurrence
ML20073Q82917 May 1991Small Break LOCA Analysis MethodologyLoop seal
ML20084V14031 March 1991Safety Evaluation for Operation of Comanche Peak Unit 1 W/ Positive Moderator Temp CoefficientShutdown Margin
ML20079D05731 March 1991Final Rept on Analysis of Check Valve Swing Arms, Mar 1991Liquid penetrant
ML20066F43331 January 1991Draft Analysis of Flow Stratification in Surge Line of Comanche Peak Reactor
ML20066L06931 December 1990Large Break LOCA Analysis Methodology
ML20066B23931 December 1990Control Rod Worth Analysis
ML20067B12924 December 1990Suppl 1 to TUE-1 DNB Correlation
ML20062D90412 November 1990Unit One Loose Parts Monitoring Sys Special Rept