ML20309A607 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 4, Reactor | Boric Acid Shutdown Margin Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Aging Management Exemption Request Earthquake Fuel cladding Power change Flow Induced Vibration |
ML20309A597 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Boric Acid Ultimate heat sink Hydrostatic Reserve Station Service Transformer Aging Management Earthquake Fuel cladding |
ML20309A598 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid High Radiation Area Anticipated operational occurrence Coatings Deep Dose Equivalent |
ML20309A594 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Frontmatter | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Tornado Missile Coatings Met Tower Reserve Station Service Transformer Nondestructive Examination Emergency Lighting Aging Management Tornado Missile Protection Surveillance Frequency Control Program Open Phase Condition Spent Fuel Pool Instrumentation Tornado Missile Risk Evaluator License Renewal Earthquake Control of Heavy Loads Fuel cladding Pressure Boundary Leakage Scaffolding Power Uprate Measurement Uncertainty Recapture |
ML20309A593 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | Safe Shutdown Boric Acid Shutdown Margin Packing leak Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Tornado Missile Hydrostatic Coatings Nondestructive Examination Emergency Lighting Tornado-Generated Missile Aging Management Job Performance Measure Tornado Missile Protection Exemption Request Earthquake Control of Heavy Loads Fuel cladding Recently irradiated fuel Fire Protection Program |
ML20309A595 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Met Tower Aging Management Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Power Uprate Measurement Uncertainty Recapture |
ML20309A599 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging | Boric Acid Non-Destructive Examination Fire Barrier Safe Shutdown Earthquake Coatings Aging Management License Renewal Earthquake Maintenance Rule Program Control of Heavy Loads Biofouling Fire Protection Program Dissimilar Metal Weld |
ML20309A596 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System | Boric Acid Loop seal Non-Destructive Examination Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Aging Management Design basis earthquake License Renewal Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Power change Measurement Uncertainty Recapture Affidavit |
ML20309A588 | 30 September 2020 | 6 to Updated Final Safety Analysis Report | |
ML20309A600 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | Boric Acid Shutdown Margin Hydrostatic |
ML20309A601 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program | |
ML20309A608 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features | Boric Acid Shutdown Margin Packing leak High Radiation Area Mission time Stroke time Tornado Missile Hydrostatic Coatings Emergency Lighting Aging Management Tornado Missile Protection Earthquake Fuel cladding Scaffolding GOTHIC |
ML20309A609 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Requirements | Fuel cladding |
ML20309A612 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power System | Hot Short Safe Shutdown Boric Acid Fire Barrier Tornado Missile Reserve Station Service Transformer Aging Management Tornado Missile Protection Open Phase Condition Earthquake |
ML20309A610 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Backfit |
ML20309A613 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Emergency Lighting Aging Management Tornado Missile Protection Surveillance Frequency Control Program Open Phase Condition Earthquake Fuel cladding Power change Power Uprate Measurement Uncertainty Recapture |
ML20309A606 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Boric Acid Loop seal Hydrostatic Finite Element Analysis Aging Management Earthquake Turbine Missile Liquid penetrant Coast down |
ML20309A603 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Safe Shutdown Boric Acid Shutdown Margin Loop seal Ultimate heat sink Hydrostatic Exemption Request Earthquake Deep Dose Equivalent Fuel cladding Power change GOTHIC |
ML20309A602 | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics | |
ML18285A046 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Frontmatter - Revision Summary | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Coatings Met Tower Nondestructive Examination Emergency Lighting Aging Management Surveillance Frequency Control Program Spent Fuel Pool Instrumentation License Renewal Earthquake Control of Heavy Loads Fuel cladding Pressure Boundary Leakage Scaffolding Power Uprate Measurement Uncertainty Recapture |
ML18285A064 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging | Boric Acid Non-Destructive Examination Fire Barrier Safe Shutdown Earthquake Coatings Aging Management License Renewal Earthquake Maintenance Rule Program Control of Heavy Loads Biofouling Fire Protection Program Dissimilar Metal Weld |
ML18285A063 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program | |
ML18285A062 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Requirements | Fuel cladding |
ML18285A060 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | Boric Acid Shutdown Margin Hydrostatic |
ML18285A059 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | Safe Shutdown Backfit |
ML18285A056 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Boric Acid Loop seal Hydrostatic Finite Element Analysis Aging Management Earthquake Turbine Missile Liquid penetrant Coast down |
ML18285A047 | 27 September 2018 | Revision 54 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Boric Acid Ultimate heat sink Hydrostatic Reserve Station Service Transformer Aging Management Earthquake Fuel cladding |
ML17033B585 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 16 | Fuel cladding |
ML17033B518 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 5 | Boric Acid Loop seal Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Aging Management License Renewal Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Power change Measurement Uncertainty Recapture |
ML17033B590 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 17 | |
ML17033B573 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 13 | Safe Shutdown Backfit |
ML17033B591 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 18 | Boric Acid Non-Destructive Examination Fire Barrier Safe Shutdown Earthquake Coatings Aging Management License Renewal Earthquake Maintenance Rule Program Control of Heavy Loads Biofouling Fire Protection Program Dissimilar Metal Weld |
ML17033B575 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 14 | Boric Acid Shutdown Margin Hydrostatic |
ML17033B492 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 1 | Safe Shutdown Boric Acid Ultimate heat sink Hydrostatic Reserve Station Service Transformer Aging Management Earthquake Fuel cladding |
ML17033B570 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 12 | Boric Acid High Radiation Area Anticipated operational occurrence Coatings Deep Dose Equivalent |
ML17033B480 | 29 September 2016 | Redacted Updated Final Safety Analysis Report | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Non-Destructive Examination Coatings Met Tower Nondestructive Examination Emergency Lighting Aging Management Surveillance Frequency Control Program Spent Fuel Pool Instrumentation License Renewal Earthquake Control of Heavy Loads Fuel cladding Pressure Boundary Leakage Scaffolding Power Uprate Measurement Uncertainty Recapture |
ML17033B531 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 7 | Safe Shutdown Boric Acid Shutdown Margin Anticipated operational occurrence Water Inventory Control Post Accident Monitoring Emergency Lighting Aging Management Tornado Missile Protection Surveillance Frequency Control Program Earthquake Fuel cladding Power change Power Uprate Measurement Uncertainty Recapture |
ML17033B550 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 11 | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Met Tower Aging Management Annual Radiological Environmental Operating Report Process Control Program Fuel cladding Power Uprate Measurement Uncertainty Recapture |
ML17033B533 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 8 | Hot Short Safe Shutdown Boric Acid Fire Barrier Tornado Missile Reserve Station Service Transformer Aging Management Tornado Missile Protection Earthquake |
ML17033B545 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 10 | Boric Acid Loop seal Hydrostatic Finite Element Analysis Aging Management Earthquake Turbine Missile Liquid penetrant Coast down |
ML17033B540 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 9 | Safe Shutdown Boric Acid Shutdown Margin Packing leak Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Tornado Missile Hydrostatic Coatings Nondestructive Examination Emergency Lighting Tornado-Generated Missile Aging Management Job Performance Measure Tornado Missile Protection Exemption Request Earthquake Control of Heavy Loads Fuel cladding Recently irradiated fuel Fire Protection Program |
ML17033B583 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 15 | Safe Shutdown Boric Acid Shutdown Margin Loop seal Ultimate heat sink Hydrostatic Exemption Request Earthquake Deep Dose Equivalent Fuel cladding Power change GOTHIC |
ML17033B525 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 6 | Boric Acid Shutdown Margin Packing leak High Radiation Area Mission time Stroke time Tornado Missile Hydrostatic Coatings Emergency Lighting Aging Management Tornado Missile Protection Earthquake Fuel cladding Scaffolding |
ML17033B500 | 29 September 2016 | North Anna Power Station, Units 1 and 2 - Redacted Updated Final Safety Analysis Report Chapter 3 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Tornado-Generated Missile Tornado Generated Missile Seismically rugged Tornado Missile Protection Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Power change |
ML17033B515 | 29 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 2 | High winds Ultimate heat sink Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake |
ML17033B509 | 26 September 2016 | Redacted Updated Final Safety Analysis Report Chapter 4 | Boric Acid Shutdown Margin Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Aging Management Exemption Request Earthquake Fuel cladding Power change Flow Induced Vibration |
ML14233A488 | 5 June 2014 | Redacted - North Anna, Units 1 & 2, Independent Spent Fuel Storage Installation (ISFSI) - Safety Analysis Report - Revision 8 | Safe Shutdown Tornado Missile Hydrostatic Coatings Incorporated by reference Design basis earthquake Safeguards Contingency Plan Earthquake Fuel cladding Liquid penetrant Loctite |
ML092820160 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Met Tower Aging Management Annual Radiological Environmental Operating Report Process Control Program Fuel cladding |
ML092820154 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 5, Reactor Coolant System | Boric Acid Loop seal Non-Destructive Examination Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference Aging Management Design basis earthquake License Renewal Earthquake Fuel cladding Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Power change Affidavit |
ML092820166 | 30 September 2009 | Updated Final Safety Analysis Report, Revision 45, Chapter 17, Quality Assurance Program | |