|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML20309A6072020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML20309A5972020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20309A5982020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML20309A5942020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Frontmatter ML20309A5932020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML20309A5952020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20309A5992020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging ML20309A5962020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System ML20309A5882020-09-30030 September 2020 6 to Updated Final Safety Analysis Report ML20309A6002020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML20309A6012020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program ML20309A6082020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML20309A6092020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Requirements ML20309A6122020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power System ML20309A6102020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML20309A6132020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control ML20309A6062020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20309A6032020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20309A6022020-09-30030 September 2020 6 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML18285A0462018-09-27027 September 2018 Revision 54 to Updated Final Safety Analysis Report, Frontmatter - Revision Summary ML18285A0642018-09-27027 September 2018 Revision 54 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging ML18285A0632018-09-27027 September 2018 Revision 54 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program ML18285A0622018-09-27027 September 2018 Revision 54 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Requirements ML18285A0602018-09-27027 September 2018 Revision 54 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML18285A0592018-09-27027 September 2018 Revision 54 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML18285A0562018-09-27027 September 2018 Revision 54 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML18285A0472018-09-27027 September 2018 Revision 54 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML17033B5852016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 16 ML17033B5182016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 5 ML17033B5902016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 17 ML17033B5732016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 13 ML17033B5912016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 18 ML17033B5752016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 14 ML17033B4922016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 1 ML17033B5702016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 12 ML17033B4802016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report ML17033B5312016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 7 ML17033B5502016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 11 ML17033B5332016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 8 ML17033B5452016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 10 ML17033B5402016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 9 ML17033B5832016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 15 ML17033B5252016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 6 ML17033B5002016-09-29029 September 2016 North Anna Power Station, Units 1 and 2 - Redacted Updated Final Safety Analysis Report Chapter 3 ML17033B5152016-09-29029 September 2016 Redacted Updated Final Safety Analysis Report Chapter 2 ML17033B5092016-09-26026 September 2016 Redacted Updated Final Safety Analysis Report Chapter 4 ML14233A4882014-06-0505 June 2014 Redacted - North Anna, Units 1 & 2, Independent Spent Fuel Storage Installation (ISFSI) - Safety Analysis Report - Revision 8 ML0928201602009-09-30030 September 2009 Updated Final Safety Analysis Report, Revision 45, Chapter 11, Radioactive Waste Management ML0928201542009-09-30030 September 2009 Updated Final Safety Analysis Report, Revision 45, Chapter 5, Reactor Coolant System ML0928201662009-09-30030 September 2009 Updated Final Safety Analysis Report, Revision 45, Chapter 17, Quality Assurance Program 2020-09-30
[Table view] |
Text
SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10* CFR 2.390 VIRGINIA JELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 30, 2020 U.S. Nuclear Regulatory Commission Serial No.: 20-324 Attention: Document Control Desk NRA/ENC: RO Washington, DC 20555 Docket Nos.: 50-338 50-339 License Nos.: NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY {DOMINION ENERGY VIRGINIA)
NORTH ANNA POWER STATION UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT - REVISION 56 Pursuant to 10 CFR 50.71(e), Dominion Energy Virginia submits Revision 56 to the Updated Final Safety Analysis Report (UFSAR) for North Anna Power Station.
Two CD-ROMs are attached to this submittal. Attachment 1 contains Security-Related Information that Dominion Energy Virginia requests be withheld from public disclosure in accordance with 10 CFR 2.390. CD-ROM is labeled, "North Anna Power Station Updated Final Safety Analysis Report, Revision 56, Docket Nos. 50-338/339, Security-Related Information -
Withhold Under 10 CFR 2.390," and contains the following files:
000 NAPS UFSAR Frontmatter.pdf 1,617,920 bytes 001 NAPS UFSAR Chapter 1.pdf 995,328 bytes 002 NAPS UFSAR Chapter 2.pdf 48,558,080 ___ bytes 003 NAPS UFSAR Chapter 3.pdf 27,688,960 bytes 004 NAPS UFSAR Chapter 4.pdf 5,709,824 bytes 005 NAPS UFSAR Chapter 5.pdf 11,016,192 bytes 006 NAPS UFSAR Chapter 6.pdf 15,495,168 bytes 007 NAPS UFSAR Chapter 7.pdf 4,042,752 bytes ftP53 008 NAPS UFSAR Chapter 8.pdf 4,771,840 bytes rJ,e{Z 009 NAPS UFSAR Chapter 9.pdf 8,286,208 bytes 010 NAPS UFSAR Chapter 10.pdf 5,122,048 Bytes ATTACHMENT 1 TO THIS LETTER CONTAINS SECURITY-RELAT ED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON REMOVAL OF ATTACHMENT 1, THIS PAGE IS DECONTROLLED.
Serial No.: 20-324 Docket Nos.: 50-338/339 NAPS UFSAR Revision 56 Page 2 of 4 011 NAPS UFSAR Chapter 11.pdf 5,404,672 bytes 012 NAPS UFSAR Chapter 12.pdf 2,365,440 bytes 013 NAPS UFSAR Chapter 13.pdf 153,600 bytes 014 NAPS UFSAR Chapter 14.pdf 516,096 bytes 015 NAPS UFSAR Chapter 15.pdf 17,768,448 bytes 016 NAPS UFSAR Chapter 16.pdf 79,872 bytes 017 NAPS UFSAR Chapter 17.pdf 59,392 bytes 018 NAPS UFSAR Chapter 18.pdf 339,968 bytes contains a CD-ROM labeled, "North Anna Power Station Updated Final Safety Analysis Report, Revision 56- Redacted, Docket Nos. 50-338/339," and contains the following files:
000 NAPS UFSAR Frontmatter.pdf 1,617,920 bytes, publicly available 001 NAPS UFSAR Chapter 1.pdf 432,128 bytes, publicly available 002 NAPS UFSAR Chapter 2.pdf 47,804,416 bytes, publicly available 003 NAPS UFSAR Chapter 3.pdf 27,629,568 bytes, publicly available 004 NAPS UFSAR Chapter 4.pdf 5,709,824 bytes, publicly available 005 NAPS UFSAR Chapter 5.pdf 11,016,192 bytes, publicly available 006 NAPS UFSAR Chapter 6.pdf 14,057,472 bytes, publicly available 007 NAPS UFSAR Chapter 7.pdf 4,042,752 bytes, publicly available 008 NAPS UFSAR Chapter 8.pdf 4,771,840 bytes, publicly available 009 NAPS UFSAR Chapter 9.pdf 6,180,864 bytes, publicly available 010 NAPS UFSAR Chapter 10.pdf 5,122,048 bytes, publicly available 011 NAPS UFSAR Chapter 11.pdf 5,404,672 bytes, publicly available 012 NAPS UFSAR Chapter 12.pdf 2,365,440 bytes, publicly available 013 NAPS UFSAR Cl1apter 13.pdf 153,600 bytes, publicly avail8;ble 014 NAPS UFSAR Chapter 14.pdf 516,096 bytes, publicly available 015 NAPS UFSAR Chapter 15.pdf 17,768,448 bytes, publicly available 016 NAPS UFSAR Chapter 16.pdf 79,872 bytes, publicly available 017 NAPS UFSAR Chapter 17.pdf 59,392 bytes, publicly available 018 NAPS UFSAR Chapter 18.pdf 339,968 bytes, publicly available Third-party documents included by reference in the North Anna UFSAR and contained in these files may not be text searchable.
Serial No.: 20-324 Docket Nos.: 50-338/339 NAPS UFSAR Revision 56 Page 3 of 4 If you have any questions or require additional information regarding this submittal, please contact Erica Combs at (804)-273-3386.
Sincerely, Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mark D. Sartain, who is Vice President - Nuclear Engineering & Fleet Support of Dominion Energy Virginia. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me t h i s ~ day of ~ k ( .2020.
MyCommissionExpires: /~~ . ~~
CRAIG D SLY ~ r v Public Notary Public Commonwealth of Virginia Reg. # 7518653 Attachments:,,,_ My_Commission
___ Expires
__ December
__ 20~
31,_ """"'-
- 1. CD-ROM labeled: "North Anna Power Station Units 1 and 2, Updated Final Safety Analysis Report, Docket Nos. 50-338/339, Revision 56, Security-Related Information
- Withhold Under 10 CFR 2.390" [Security-Related Information]
- 2. CD-ROM 'labeled: "North Anna Power Station Units 1 and 2, Updated Final Safety Analysis Report, Docket Nos. 50-338/339, Revision 56, Redacted" Commitments made in this letter: None
Serial No.: 20-324 Docket Nos.: 50-338/339 NAPS UFSAR Revision 56 Page 4 of 4 cc: Regional Administrator, Region II (w/attachments)
U.S. Nuclear Regulatory Commission Marquis One Tower Suite 1200 245 Peachtree Center Avenue, NE Atlanta, Georgia 30303-1257 Mr. G. Edward Miller NRC Senior Project Manager- North Anna Power Station (w/attachments)
U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, Maryland 20852-2738 NRC Senior Resident Inspector (w/attachments)
North Anna Power Station
ATTACHMENT 1 CD-ROM labeled:
North Anna Power Station Units 1 and 2 Updated Final Safety Analysis Report Docket Nos. 50-338/339 Revision 56 Security-Related Information -Withhold Under 10 CFR 2.390 Virginia Electric and Power Company (Dominion Energy Virginia)
North Anna Power Station Units 1 and 2 ATTACHMENT 1 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLQSURE UNDER 10 CFR 2.390.
UPON SEPARATION FROM ATTACHMENT 1, THIS PAGE IS DECONTROLLED.
ATTACHMENT 2 CD-ROM labeled:
North Anna Power Station Units 1 and 2 Updated Final Safety Analysis Report Revision 56 REDACTED Virginia Electric and Power Company (Dominion Energy Virginia)
North Anna Power Station Units 1 and 2 ATTACHMENT 1 TO THIS LETTER CONTAINS SECURITY-RELATED INFORMATION WHICH IS TO BE WITHHELD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390.
UPON SEPARATION FROM ATTACHMENT 1, THIS PAGE IS DECONTROLLED.
North Anna Power Station Updated Fina/ SatetyAna1,,, . o
- Revision 56 ., sis r{.ePort Se . Docket Nos. 50..338/339 cunty-Relatec1 lntonnation-VV;u,hoJd U d n er 10 CFR 2.390 September 2020
© 2020 Dominion All rights reserved.