Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20055H95717 July 1990Forwards Preliminary Cost Estimate for Decommissioning Reactor.Cost Estimate Based on Methods Described in May 1989 NRC Draft Reg Guide on Assuring Availability of Funds for Decommissioning Nuclear Reactors
ML20244B30929 March 1989Responds to NRC Re Violations Noted in Insp Rept 50-188/89-01.Corrective Actions:Procedure Re Entrance to Reactor Bay Revised to Include Provisions for Key Control, Accountability & Compliance Audit
ML20235X8281 August 1988Notifies That Emergency Exercise Will Be Conducted on 880812,involving Notifications of Declarations of Unusual Event,Alert & Cancellation by Telephone
ML20154J40811 May 1988Responds to NRC Re Violations Noted in Insp Rept 50-188/88-01.Corrective actions:10CFR55.53(f) Will Be Interpreted to Mean That Continuous Presence of Reactor Operator Required
ML20214L90721 May 1987Advises That Effective on 870527,JL Daniels Appointed Reactor Supervisor for Univ of Kansas Triga MK-II Nuclear Reactor Facility.Daniels Replaces J Higginbotham
ML20214P12817 November 1986Forwards Response to Violations Noted in Insp Rept 50-188/86-02.Corrective Actions:At Time of Next Calibr, Instruments Not Required for Reactor Surveillance Will Be Sequestered in Storage Location
ML20204E76524 July 1986Advises of Emergency Exercise Scheduled for 860807 in Order to Meet Requirements of Emergency Plan.Nrc Will Be Notified on 860807 of Unusual Event,Alert & Closeout.Scenario Does Not Require Response from Offsite Agency
ML20100A86327 November 1984Advises That Emergency Plan Fully Implemented,Effective 841127
ML20096A44320 August 1984Ack Receipt of 840813 Emergency Plan Evaluation Rept.Last Paragraph on Page 2 of Rept in Error.Operations Boundary Encompasses Reactor Facility Room 110 of Ward Hall,Per Paragraph 1.1 of Emergency Plan
ML20092J86720 June 1984Forwards Revised Emergency Plan for Kansas State Univ Triga Mark II Nuclear Reactor Facility, in Response to 840504 Request.List of Revs Encl
ML20076G77210 June 1983Advises of Appointment of J Higginbotham as Reactor Supervisor,Effective 830601
ML20049J3439 March 1982Discusses Power Fluctuations of Triga Reactor Originally Reported 810813.Mods to Primary Coolant Diffuser Nozzle Eliminated Power fluctuations.Ni-16 Levels at Pool Surface Not Affected
ML19350C20026 March 1981Responds to Questions Re Power Fluctuations at Triga Mark Ii.Fluctuations Are Generic to Triga Reactors Cooled by Natural Convection
ML19337B5822 October 1980Submits Changes in Procedures & Facility for Oct 1979-Sept 1980.Includes Tests & Experiments Conducted W/O Prior NRC Approval
ML19254E99325 October 1979Submits Info Re Procedure Changes,Tests & Experiments Conducted W/O Prior NRC Approval & Changes in Facility for Jul 1978-Sept 1979
ML19260A00323 October 1979Forwards Executed Amend 12 to Idemnity Agreement E-1 Modifying Prefatory Language Re Transportation of Radioactive Matl
ML19210D38225 September 1979Responds to IE Bulletin 79-19.Facility Does Not Generate Low Level Radwaste
ML20071G66017 May 1979Forwards Amend 11 to Indemnity Agreement E-1
ML20062A11025 September 1978Forwards Changes in Procedures for Aug 1977-June 1978: Biennial Control Rod Insp,Fuel Element Insp & Reactor Startup W/Period Scram BypassedOverexposure