Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24032A020 | 31 January 2024 | NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 | |
ML24025A159 | 25 January 2024 | NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) | |
ML24022A259 | 22 January 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator | |
ML24016A076 | 16 January 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications | |
ML24010A117 | 10 January 2024 | NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance | |
ML24009A111 | 9 January 2024 | NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169) | Ultimate heat sink |
ML23363A030 | 29 December 2023 | NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release | |
ML23354A203 | 18 December 2023 | Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 | Process Control Program |
ML23352A247 | 18 December 2023 | NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance | Incorporated by reference |
ML23347A064 | 13 December 2023 | 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 | |
ML23339A089 | 5 December 2023 | NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 | |
ML23338A040 | 4 December 2023 | NRR E-mail Capture - Ready for Clean TS Pages and Updated Review Hours for Clinton Power Station, Unit 1, Request for License Amendment to Revise Technical Specifications Section 3.8.3 | |
ML23335A012 | 1 December 2023 | FNP - IP95001 Inspection Notification and Request for Information (Email to Farley) | |
ML23334A093 | 28 November 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 | |
ML23318A525 | 9 November 2023 | NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions | |
ML23319A166 | 2 November 2023 | NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) | Exemption Request |
ML23275A027 | 29 September 2023 | Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 | |
ML23271A154 | 28 September 2023 | NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program | |
ML23268A002 | 22 September 2023 | NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 | |
ML23264A799 | 21 September 2023 | NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 | |
ML23261A003 | 15 September 2023 | NRR E-mail Capture - NRC Acceptance Review of Clinton Amendment Request to Revise Timing of Reactor Water Cleanup Isolation Valves | |
ML23257A219 | 14 September 2023 | NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 | |
ML23264A014 | 14 September 2023 | NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR | |
ML23254A287 | 11 September 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts | |
ML23249A208 | 6 September 2023 | NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120) | |
ML23243A995 | 31 August 2023 | Request for Baseline RP Inspection | Process Control Program |
ML23236A256 | 24 August 2023 | NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) | |
ML23236A002 | 22 August 2023 | NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR | Ultimate heat sink |
ML23230B168 | 18 August 2023 | NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications | |
ML23223A014 | 10 August 2023 | NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers | Exemption Request |
ML23219A214 | 4 August 2023 | NRR E-mail Capture - NRC Acceptance Review of Clinton Request for Partial Site Release | |
ML23208A307 | 27 July 2023 | NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) | |
ML23207A174 | 26 July 2023 | NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI | |
ML23198A155 | 17 July 2023 | NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 | |
ML23194A110 | 13 July 2023 | NRR E-mail Capture - Non-acceptance of Clinton Request for Partial Site Release | |
ML23191A867 | 10 July 2023 | NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | |
ML23177A199 | 26 June 2023 | NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078) | |
ML23173A152 | 22 June 2023 | Request for Additional Information NextEra Fleet Emergency Plan Amendment Request | Cyber Security FLEX Minimum staff |
ML23172A013 | 20 June 2023 | Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies | Surveillance Frequency Control Program |