Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML24032A02031 January 2024NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023
ML24025A15925 January 2024NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016)
ML24022A25922 January 2024NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator
ML24016A07616 January 2024NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications
ML24010A11710 January 2024NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance
ML24009A1119 January 2024NRR E-mail Capture - Acceptance Review - Hatch 1&2 LAR - Revise TS 3.7.1 & 3.7.2 to Adopt Risk-Informed Completion Times for RHRSW and Psw Systems (L-2023-LLA-0169)Ultimate heat sink
ML23363A03029 December 2023NRR E-mail Capture - Preliminary RAIs for Clinton Partial Site Release
ML23354A20318 December 2023Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01Process Control Program
ML23352A24718 December 2023NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI IssuanceIncorporated by reference
ML23347A06413 December 202312-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5
ML23339A0895 December 2023NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374
ML23338A0404 December 2023NRR E-mail Capture - Ready for Clean TS Pages and Updated Review Hours for Clinton Power Station, Unit 1, Request for License Amendment to Revise Technical Specifications Section 3.8.3
ML23335A0121 December 2023FNP - IP95001 Inspection Notification and Request for Information (Email to Farley)
ML23334A09328 November 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6
ML23318A5259 November 2023NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions
ML23319A1662 November 2023NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2)Exemption Request
ML23275A02729 September 2023Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023
ML23271A15428 September 2023NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program
ML23268A00222 September 2023NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0
ML23264A79921 September 2023NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1
ML23261A00315 September 2023NRR E-mail Capture - NRC Acceptance Review of Clinton Amendment Request to Revise Timing of Reactor Water Cleanup Isolation Valves
ML23257A21914 September 2023NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3
ML23264A01414 September 2023NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR
ML23254A28711 September 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts
ML23249A2086 September 2023NRR E-mail Capture - Change in Estimated Review Schedule and Level of Effort for Hatch 'Revise TS Table 1.1-1 (Modes)' LAR (L-2022-LLA-0120)
ML23243A99531 August 2023Request for Baseline RP InspectionProcess Control Program
ML23236A25624 August 2023NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106)
ML23236A00222 August 2023NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LARUltimate heat sink
ML23230B16818 August 2023NRR E-mail Capture - Clinton Power Station, Unit 1, Preliminary Requests for Additional Information (Rais) Related to the Amendment Request to Revise Diesel Generator Starting Air Technical Specifications
ML23223A01410 August 2023NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical BarriersExemption Request
ML23219A2144 August 2023NRR E-mail Capture - NRC Acceptance Review of Clinton Request for Partial Site Release
ML23208A30727 July 2023NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032)
ML23207A17426 July 2023NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI
ML23198A15517 July 2023NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023
ML23194A11013 July 2023NRR E-mail Capture - Non-acceptance of Clinton Request for Partial Site Release
ML23191A86710 July 2023NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control
ML23177A19926 June 2023NRR E-mail Capture - Acceptance Review - Shearon Harris Nuclear Power Plant, Unit 1 - RA-23-0005 - LAR to Align Certain TSs with ISTS (L-2023-LLA-0078)
ML23173A15222 June 2023Request for Additional Information NextEra Fleet Emergency Plan Amendment RequestCyber Security
FLEX
Minimum staff
ML23172A01320 June 2023Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement FrequenciesSurveillance Frequency Control Program