Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23361A102 | 21 December 2023 | Security Rule Exemption Request - ISFSI Docket No. Reference | Exemption Request |
ML23348A122 | 14 December 2023 | NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems | Internal Flooding Probabilistic Risk Assessment |
ML23335A065 | 1 December 2023 | NRR E-mail Capture - GGNS - Audit Questions for LARs Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Init. 4b and 50.69, Risk-Informed Cat. and Treatment of SSCs for Nuclear Pwr Rx (L-2023-LLA-0081/0080) | Safe Shutdown High winds Reactor Vessel Water Level Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Open Phase Condition Large early release frequency Tornado Missile Risk Evaluator Flooding Focused Evaluation Offsite Circuit |
ML23321A122 | 17 November 2023 | NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation | Boric Acid Shutdown Margin Anticipated operational occurrence Post Accident Monitoring |
ML23240A341 | 28 August 2023 | NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions | |
ML23191A280 | 10 July 2023 | NRR E-mail Capture - Grand Gulf - Acceptance Review for LAR Adopting TSTF-505, Rev. 2, Provide Risk-Informed Completion Times - RITSTF Initiative 4b | |
ML23191A866 | 10 July 2023 | NRR E-mail Capture - Grand Gulf - Acceptance Review of LAR Adopting 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSCs for Nuclear Power Reactors | |
ML23116A146 | 26 April 2023 | NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Final RAI for Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) | |
ML23072A367 | 9 March 2023 | NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment | |
ML23052A150 | 21 February 2023 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation | Post Accident Monitoring |
ML23009B691 | 9 January 2023 | NRR E-mail Capture - Grand Gulf, Unit 1 and River, Unit 1 - Acceptance of Requested Licensing Action Request to Update ASME Code RR SE with NRC-Approved Revision of BWRVIP Guidelines | |
ML22353A612 | 19 December 2022 | March 2023 Emergency Preparedness Exercise Inspection - Request for Information | |
ML22307A253 | 3 November 2022 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination | Boric Acid |
ML22206A015 | 21 July 2022 | NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems | |
ML22173A037 | 21 June 2022 | NRR E-mail Capture - Entergy (Grand Gulf and River Bend) - Acceptance Review of the License Amendment Request to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling | |
ML22122A090 | 29 April 2022 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 | |
ML22110A117 | 19 April 2022 | (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 | |
ML22075A369 | 3 March 2022 | Email Grand Gulf 2022 PI&R Request for Information | Pandemic |
ML22250A671 | 16 February 2022 | Outline Submittal Notification Email DC-Cook 2022 | |
ML21341A625 | 7 December 2021 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 | |
ML21312A479 | 5 November 2021 | Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development | |
ML21308A560 | 4 November 2021 | NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements | |
ML21307A335 | 3 November 2021 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation | Post Accident Monitoring |
ML21292A011 | 18 October 2021 | NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | |
ML21236A026 | 23 August 2021 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements | |
ML21174A034 | 22 June 2021 | NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions | |
ML21165A135 | 14 June 2021 | NRR E-mail Capture - Grand Gulf - Acceptance Review for Inserice Testing Program Relief Request VRR-GGNS-2021-1, Pressure Isolation Valve Testing Frequency | |
ML21140A305 | 20 May 2021 | NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval | |
ML21119A215 | 28 April 2021 | NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 | |
ML21113A281 | 23 April 2021 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation | Post Accident Monitoring |
ML21109A214 | 19 April 2021 | NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Rev. Est Hours for Review of Relief Request (RR) - ASME Code RR Safety Eval with NRC-Approved Rev of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) | |
ML21089A022 | 24 March 2021 | DC Cook Power Operated Valves (POV) Preliminary Request for Information | Squib Power-Operated Valves |
ML21109A213 | 23 March 2021 | NRR E-mail Capture - Entergy Fleet (Grand Gulf and River Bend) - Relief Request (RR) Associated with ASME Code RR Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) | |
ML21082A026 | 22 March 2021 | Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval | |
ML21068A409 | 9 March 2021 | NRR E-mail Capture - Entergy Fleet (GGNS and RBS) -Approval of TSTF-501 LAR, Relocate Sored Fuel Oil and Lube Oil Volume Values to Licensee Control | |
ML21049A268 | 16 February 2021 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT | Incorporated by reference |
ML21026A347 | 26 January 2021 | NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval | |
ML21015A345 | 14 January 2021 | NRR E-mail Capture - Grand Gulf and River Bend - Revised Estimated Hours for Relief Request Associated with ASME Code RR SEs with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020 and RBS-ISI-019) | |
ML21008A474 | 8 January 2021 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT | |
ML20366A101 | 31 December 2020 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection | |
ML20363A146 | 22 December 2020 | Request for Information: Grand Gulf EP Exercise Inspection - March 2021 | Coronavirus |
ML20352A119 | 10 December 2020 | Email from Thomas Saporito 12-10-20 | |
ML20329A144 | 20 November 2020 | Terrapower QAPD Preliminary Questions Email | |
ML20323A416 | 18 November 2020 | Response to Choice Letter (EA-20-094) | |
ML20337A271 | 9 November 2020 | Email - Grand Gulf Nuclear Station 050-00416, Requested Regulatory Conference | |
ML20316A015 | 6 November 2020 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval | |
ML20318A020 | 16 October 2020 | NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 | |
ML20290A425 | 15 October 2020 | Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination | Pandemic Coronavirus |
ML20289A712 | 15 October 2020 | NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination | Pandemic Coronavirus COVID-19 |
ML20318A019 | 15 October 2020 | NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 | Boric Acid |