Issue date | Title | Topic | |
---|---|---|---|
ML24037A190 | 5 February 2024 | Acceptance of LAR 23-07 to Delete License Condition 14 | |
ML24032A244 | 1 February 2024 | OEDO-24-00011 - 10 CFR 2.206 Petition Holtec Misuse Decommissioning Fund- Email to Petitioner | |
ML24032A470 | 1 February 2024 | Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC | |
ML24031A050 | 31 January 2024 | COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report | |
ML24032A020 | 31 January 2024 | NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 | |
ML24033A284 | 30 January 2024 | Fyi/Review - Draft Environmental Assessment Regarding Proposed Exemption Request from Maine Yankee ISFSI | Exemption Request |
IR 05000350/1968001 | 30 January 2024 | 639017-Suspension of Review of License Amendment Request Due to Lack of Significant Amounts of Information and Closure of Mail Control 639017 - License 50-35068-01 for Anchorage Radiation Oncology Management, Inc | |
ML24029A273 | 29 January 2024 | NRC Consultation with Commonwealth of Pennsylvania Re Proposed NSHC for Susquehanna License Amendment Request | |
ML24030A067 | 26 January 2024 | Email EA Fonsi Notice to Kewaunee Solutions for Exemptions on Site Restoration Activities | |
ML24026A292 | 26 January 2024 | Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request | |
ML24025A159 | 25 January 2024 | NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) | |
ML24026A280 | 25 January 2024 | Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) | |
ML24040A160 | 25 January 2024 | Email; Cfleming, NCSU to Dhardesty, USNRC-NC State Pulstar License Renewal Approach from Nc State (Jan. 2024) | License Renewal |
ML24009A230 | 25 January 2024 | Transmittal Email for Verification of - a Version Shielding Topical Report | |
ML24024A020 | 24 January 2024 | Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures | |
ML24025A095 | 24 January 2024 | Clarifications Related to the NRC Staff'S EA for Crystal River | |
ML24024A018 | 24 January 2024 | LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 | |
ML24024A137 | 24 January 2024 | NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance | |
ML24024A245 | 24 January 2024 | 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures | |
ML24023A624 | 23 January 2024 | NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Question (4.3-25 on Material Degradation) | Fuel cladding |
ML24025A179 | 23 January 2024 | State Consultation Response e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment (License No. DPR-40, Docket No. 50-285) | |
ML24024A224 | 22 January 2024 | State Consultation e-mail on Fort Calhoun Station, Unit 1 License Termination Plan License Amendment- (License No. DPR-40, Docket No. 50-285) | |
ML24022A212 | 22 January 2024 | NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (4.3-23 and 4.3-24 on Material Degradation) | |
ML24025A017 | 22 January 2024 | NRC Request for Concurrence with Endangered Species Act Determinations for Comanche Peak License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment | License Renewal |
ML24022A259 | 22 January 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator | |
ML24022A021 | 20 January 2024 | NRR E-mail Capture - Monticello - Request for Additional Information ISI RR-002 Alternative to Use IWB-2500(f) | |
ML24022A182 | 19 January 2024 | Acknowledgment - Reply to Notice of Violation - Carbon Asset Solutions | |
ML24019A074 | 19 January 2024 | NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator | |
ML23320A112 | 18 January 2024 | NRC to Fws, Concurrence with Endangered Species Act Determinations for North Anna Power Station, Units 1 and 2, Subsequent License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment | License Renewal Subsequent License Renewal |
ML24017A112 | 17 January 2024 | NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 | Cyber Security |
ML24017A111 | 17 January 2024 | NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 | |
ML24017A239 | 17 January 2024 | NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Valve Testing Frequency Alternative VR-9 | |
ML24017A303 | 17 January 2024 | NRR E-mail Capture - Abilene Christian University (Acu) Molten Salt Research Reactor (Msrr) Preliminary Safety Analysis Report (PSAR) Section 4.3 Audit Questions (Related to Material Degradation) | |
ML24016A076 | 16 January 2024 | NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications | |
ML24029A113 | 16 January 2024 | Notification of Inspection and Request for Information (Email) | |
ML24016A006 | 15 January 2024 | Email Dated 1/15/24 from D. Bussman (Gns) to N. Garcia Santos (Nrc), Staggered Confinement RAIs for the Castor geo69 Storage Application (Docket No. 72-1052) | |
ML24015A011 | 12 January 2024 | NRR E-mail Capture - Schedule Change for Washington State University (Wsu) License Amendment Request (LAR) Proposed Amendment 22 | |
ML24012A194 | 12 January 2024 | Email Dated 1/12/24 from N. Garcia Santos (NRC) to D. Bussmann (Gns), Staggered Confinement RAIs for the Castor geo69 Storage Application (Docket No. 72-1052) |