Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18249A12613 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Figures
ML18249A12813 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, FiguresEarthquake
ML18249A12913 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A Figures
ML18249A13513 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figures. (Redacted)
ML18249A14013 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Figures
ML18249A14213 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures. (Redacted)
ML18249A14313 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures
ML18249A14513 August 2018Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures
ML18250A00911 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 15A, FiguresFeedwater Controller Failure
ML18250A00411 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Figures
ML18250A00511 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figures (Redacted)
ML18250A00611 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures
ML18250A00711 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 14, Figures
ML18250A01011 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 17A, Figures
ML18250A01211 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, FiguresEarthquake
ML18250A01311 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Figures
ML18250A01411 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2B, Figures
ML18250A01611 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Figures (Redacted)Operating Basis Earthquake
Incorporated by reference
Finite Element Analysis
ML18250A01811 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures (Redacted)
ML18250A01911 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures
ML18250A02011 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures
ML18250A02111 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Analog Channels for Engineered Safeguards Sensor Trip Inputs, Appendix 7B, Figures
ML18250A02211 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figures
BSEP 13-0010, Attachment 1: Requested Drawings21 January 2013Attachment 1: Requested Drawings
ML10203047620 July 2010Topographic Survey Stabilization Pond Area 185 Acres, 1 Through 7
RNP-RA/08-0124, Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors17 December 2008Response to Request for Additional Information NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water ReactorsHydrostatic
Coatings
RNP-RA/07-0016, Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Change to Section 3.5.222 February 2007Response to NRC Request for Additional Information Regarding Proposed Technical Specifications Change to Section 3.5.2
ML09015042425 August 2004Progress Energy Carolinas, Inc., Handouts for the Brunswick and H.B. Robinson NPP Tours During the Shearon Harris Scol Environmental Site Audit of Alternative Sites
ML02233008014 August 2002Drawing HBR2-8255LR, Fire Protection System Flow Diagram. Sheet 6 of 6
ML02233007814 August 2002Drawing HBR2-8255LR, Fire Protection System Deluge & Pre-Action Control Valve Flow Diagram. Sheet 5 of 6
ML02233007514 August 2002Drawing HBR2-8255LR, Fire Protection System Deluge & Pre-Action Control Valve Flow Diagram. Sheet 4 of 6
ML02233007014 August 2002Drawing HBR2-8255LR, Fire Protection System Containment Flow Diagram. Sheet 3 of 6
ML02233006614 August 2002Drawing HBR2-8255LR, Fire Protection System Flow Diagram. Sheet 2 of 6
ML02233006114 August 2002Drawing HBR2-8255LR, Fire Protection Intake Structure Flow Diagram. Sheet 1 of 6