LR-N17-0044, Enclosure 14 O LR-N17-0044 and LAR H17-03 - Calculation SC-BB-0525, Hope Creek Heat Balance Uncertainty Calculation, Revision 5 | 16 March 2017 | Enclosure 14 O LR-N17-0044 and LAR H17-03 - Calculation SC-BB-0525, Hope Creek Heat Balance Uncertainty Calculation, Revision 5 | |
ML17188A269 | 16 March 2017 | Enclosure 14 O LR-N17-0044 and LAR H17-03 - Calculation SC-BB-0525, Hope Creek Heat Balance Uncertainty Calculation, Revision 5 | |
ML15030A242 | 22 September 2014 | Appendix a, Mass Flux Calculations | |
ML12284A427 | 4 October 2012 | PSEG Early Site Permit Application, Calculation of Multiplier Effects for Er Section 10.4 | |
ML103440451 | 23 April 2010 | Document: Ansys Input Files and Calculation Package Drafts | Safe Shutdown Tornado Missile Hydrostatic Coatings Finite Element Analysis |
LR-N10-0355, Offsite Dose Calculation Manual, Rev. 25 for Pseg Nuclear LLC Salem Generating Station | 16 April 2010 | Offsite Dose Calculation Manual, Rev. 25 for Pseg Nuclear LLC Salem Generating Station | Offsite Dose Calculation Manual |
ML110070170 | 16 April 2010 | Offsite Dose Calculation Manual, Rev. 25 for PSEG Nuclear LLC Salem Generating Station | Offsite Dose Calculation Manual |
LR-N10-0355, Hope Creek, Offsite Dose Calculation Manual, Revision 25 | 16 April 2010 | Hope Creek, Offsite Dose Calculation Manual, Revision 25 | Offsite Dose Calculation Manual |
ML110050417 | 16 April 2010 | Hope Creek, Offsite Dose Calculation Manual, Revision 25 | Offsite Dose Calculation Manual |
ML101300373 | 27 October 2009 | Attachment 1, Offsite Dose Calculation Manual Revision, 24 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
LR-N10-0140, Salem - Attachment 1, Offsite Dose Calculation Manual Revision, 24 | 27 October 2009 | Salem - Attachment 1, Offsite Dose Calculation Manual Revision, 24 | Offsite Dose Calculation Manual |
LR-N10-0140, Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 23 | 6 August 2009 | Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 23 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML101300371 | 6 August 2009 | Attachment 1, Offsite Dose Calculation Manual, Revision 23 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
LR-N10-0355, Hope Creek, CC-AA-309-1001, Rev. 3, Hc Class 1E 125 Vdc Station Battery & Charger Sizing | 5 August 2009 | Hope Creek, CC-AA-309-1001, Rev. 3, Hc Class 1E 125 Vdc Station Battery & Charger Sizing | |
ML110050414 | 5 August 2009 | Hope Creek, CC-AA-309-1001, Rev. 3, Hc Class 1E 125 Vdc Station Battery & Charger Sizing | |
LR-N10-0140, Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 22 | 9 June 2009 | Salem - Attachment 1, Offsite Dose Calculation Manual, Revision 22 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML101300370 | 9 June 2009 | Attachment 1, Offsite Dose Calculation Manual, Revision 22 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
LR-N09-0099, Annual Radioactive Effluent Release Report, Page 181 Through End | 31 May 2009 | Annual Radioactive Effluent Release Report, Page 181 Through End | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
LR-N09-0099, Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | 31 May 2009 | Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
ML091280378 | 31 May 2009 | Hope Creek, and Salem, Units 1 and 2, 2008 Annual Radioactive Effluent Release Report, Cover Through Page 180 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
LR-N09-0074, Letter from Jeffrie Keenan of PSEG Nuclear L.L.C., NRC Decommissioning Funding Status Report for Salem, Hope Creek & Peach Bottom Generating Stations | 31 March 2009 | Letter from Jeffrie Keenan of PSEG Nuclear L.L.C., NRC Decommissioning Funding Status Report for Salem, Hope Creek & Peach Bottom Generating Stations | |
ML082110419 | 23 July 2008 | Calculation S-1-FHV-MDC-0705, Revision 5, Fhv System Heating and Cooling and Air Flow Determination. | |
ML070871112 | 19 February 2007 | Calculation 0108-0342-JFL-01, Rev 0, Analysis of CCW Supply Temperature During LOCA Recirculation. | Stroke time Coast down |
ML070790652 | 14 February 2007 | Calculation S-C-SF-MDC-1810, Rev 7, Decay Heat-up Rates and Curves. | |
ML062230324 | 18 May 2006 | Attachment 6, Calculation S-C-ZZ-MDC-1920, Rev. 41R0, 'Fuel Handling Accident Radiological Consequences Evaluation. ' | Stroke time Met Tower NJPDES Incorporated by reference |
ML052650219 | 13 September 2005 | Rev. 0 to Calculation 0108-0236-01 | |
LR-N05-0424, Attachment 1, Calculation S-1-SJ-MDC-1539, Revision 2, Accumulator Pressure Decay Time During Discharge Test. | 12 August 2005 | Attachment 1, Calculation S-1-SJ-MDC-1539, Revision 2, Accumulator Pressure Decay Time During Discharge Test. | Stroke time |
LR-N08-0308, Attachment 3 - Salem, Units 1 and 2 - Calculation S-2-SJ-MDC-1394, Rev. 5, Accumulator Pressure Decay Time During Discharge Test. | 20 July 2005 | Attachment 3 - Salem, Units 1 and 2 - Calculation S-2-SJ-MDC-1394, Rev. 5, Accumulator Pressure Decay Time During Discharge Test. | |
LR-N04-0413, Waste Gas Decay Tank and Volume Control Tank Rupture Accidents - AST Analysis | 10 November 2003 | Waste Gas Decay Tank and Volume Control Tank Rupture Accidents - AST Analysis | |
ML19030A732 | 10 February 1978 | Enclosed Calculations on Pressurizer Overpressure Protection System (Pops) | |