3F0420-01, 2019 Annual Radioactive Effluent Release Report | 7 April 2020 | 2019 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
3F1018-01, Fluor Corporation - Chemical Addition System Sizing Calculations | 27 April 2016 | Fluor Corporation - Chemical Addition System Sizing Calculations | Biofouling |
3F0413-03, Attachment C, Off-Site Dose Calculation Manual, Revision 34 | 12 September 2012 | Attachment C, Off-Site Dose Calculation Manual, Revision 34 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
ML13128A062 | 2 May 2012 | Attachment B, Off-Site Dose Calculation Manual, Revision 33 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
3F1011-05, Calculation 86-9168766-001, CR-3 EPU Inadvertent Engineered Safeguards Actuation (Iesa) Analysis Summary. | 22 September 2011 | Calculation 86-9168766-001, CR-3 EPU Inadvertent Engineered Safeguards Actuation (Iesa) Analysis Summary. | Boric Acid Shutdown Margin Loop seal Stroke time Anticipated operational occurrence Post Accident Monitoring Fuel cladding Power Uprate Manual Operator Action |
ML11286A093 | 20 September 2011 | Calculation 86-9159609-002, CR-3 Steam Generator Tube Rupture Event for EPU Summary. | Stroke time Power Uprate |
ML11286A094 | 13 September 2011 | Calculation 86-9167251-001, Summary of CR3 EPU Inadvertent Pressurizer Relief Valve Opening. | Shutdown Margin Stroke time Fuel cladding Power Uprate |
ML11314A119 | 1 September 2011 | Calculation No. S09-0036, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - Analysis | Operating Basis Earthquake Finite Element Analysis Earthquake Control of Heavy Loads |
ML11314A121 | 5 August 2011 | Calculation No. S10-0063, Auxiliary Building Overhead Crane (FHCR-5) Supporting Steel Structure - Connection Evaluation | Operating Basis Earthquake Earthquake Control of Heavy Loads Weak link |
ML11207A440 | 15 June 2011 | Attachment 8: Crystal River Unit 3, License Amendment Request #309, Revision 0, Sample Instrument Setpoint Calculation | |
ML102710673 | 16 September 2010 | 2.12 Exhibit 2, Design Analysis Calculation S-00-0047, Revision 0, As-Built Concrete Strength for Class I Structures | |
3F0410-05, Off-Site Dose Calculation Manual, Revision 32 | 29 April 2010 | Off-Site Dose Calculation Manual, Revision 32 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML102870560 | 23 January 2010 | FW: Design Basis Calculations | Safe Shutdown Earthquake Finite Element Analysis |
ML102871036 | 8 January 2010 | Email - from: Dyksterhouse, Don (Don.Dyksterhouse@Pgnmail.Com) to: Thomas, George Cc: Dyksterhouse, Don; Lake, Louis Dated Friday, January 08, 2010 8:17 Am Subject: Approved Calculations Attachments: 0102-0135-jlh-2 Radial Pressure at Tendo | |
ML102720391 | 2 November 2009 | Calculation S07-0033, Revision 0, NRC SIT Member Questions to Licensee (Request 43 Response Information, Document CR-N1002-500, Attachment H, Part 3 of 3 | Coatings Liquid penetrant Scaffolding Affidavit |
3F0409-04, Attachment B Through E - Crystal River, Unit 3 - License Amendment Request 303, Revision 1, Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis. | 8 April 2009 | Attachment B Through E - Crystal River, Unit 3 - License Amendment Request #303, Revision 1, Revision to Final Safety Analysis Report Sections 5.4.3, Structural Design Criteria, and 5.4.5.3, Missile Analysis. | Safe Shutdown Tornado Missile Safe Shutdown Earthquake Tornado Generated Missile Design basis earthquake Earthquake Turbine Missile |
ML091140599 | 12 August 2008 | Attachment B, Off-Site Dose Calculation Manual, Revision 31 | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
3F0407-05, Off-Site Dose Calculation Manual, Revision 29 | 5 October 2006 | Off-Site Dose Calculation Manual, Revision 29 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
3F0406-05, Off-Site Dose Calculation Manual, Revision 27 | 19 September 2005 | Off-Site Dose Calculation Manual, Revision 27 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
3F0605-07, Calculation M90-0021, 'Building Spray and Decay Heat Pump Npsha/R, Revision 13, Attachment | 16 June 2005 | Calculation M90-0021, 'Building Spray and Decay Heat Pump Npsha/R, Revision 13, Attachment | Boric Acid Coatings Dedication package |
3F0205-05, 10 CFR 50 Appendix R Exemption Request for Pressurizer Level Instrumentation | 3 February 2005 | 10 CFR 50 Appendix R Exemption Request for Pressurizer Level Instrumentation | Hot Short Safe Shutdown Fire Barrier Safeguards Contingency Plan Exemption Request Fire Protection Program |
ML073110383 | 5 October 2003 | Calculation I-95-0003, Revision 4, RPS Setpoints and Tolerance Calculations, Attachments G, H and I Included | Measurement Uncertainty Recapture |