Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212J260 | 31 March 1998 | Technical Evaluation Rept on 'Submittal Only' Review of IPEEE at Pilgrim Nuclear Power Station, Final Rept | Hot Short Safe Shutdown High winds Ultimate heat sink Mission time Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Tornado Generated Missile Seismically rugged Earthquake Fire Protection Program |
L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station | 30 June 1996 | TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station | Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Liquid penetrant Through-Wall Leak Backfit |
ML20128K206 | 31 May 1996 | Technical Evaluation Rept of Pilgrim IPE Back-End Submittal Final Rept | Probabilistic Risk Assessment Hardened vent |
ML20128K213 | 11 April 1996 | Plant Technical Evaluation Rept on IPE Submittal Human Reliability Analysis,Final Rept | Internal Flooding Probabilistic Risk Assessment |
ML20128K187 | 9 April 1996 | Pilgrim,Technical Evaluation Rept on IPE Front End Analysis | Internal Flooding Probabilistic Risk Assessment Hardened vent |
L-94-013, Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant | 30 November 1994 | Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01, for Plant | Reactor Vessel Water Level Scram Discharge Volume |
ML20044E739 | 23 June 1993 | Technical Evaluation Rept Pump & Valve Inservice Testing Program Pilgrim Nuclear Power Station. | High Radiation Area Ultimate heat sink Stroke time Squib Scram Discharge Volume Excess Flow Check Valve Cold shutdown justification Power-Operated Valves Power Operated Valves Scaffolding Grace period |
ML20116J685 | 31 October 1992 | High Pressure Coolant Injection (HPCI) System RISK-BASED Inspection Guide.Pilgrim Nuclear Power Station | Reactor Vessel Water Level Probabilistic Risk Assessment Overtravel |
ML20094F055 | 31 January 1992 | Rev 1 to Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station | High Radiation Area Ultimate heat sink Stroke time Scram Discharge Volume Fast acting solenoid valve Cold shutdown justification Power-Operated Valves Power Operated Valves |
ML20073E564 | 31 March 1991 | Technical Evaluation Rept Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station | High Radiation Area Ultimate heat sink Stroke time Scram Discharge Volume Cold shutdown justification Power-Operated Valves Power Operated Valves |
ML20072P775 | 30 June 1990 | Conformance to Reg Guide 1.97:Pilgrim | Post Accident Monitoring Squib Fuel cladding |
ML19327B676 | 3 October 1989 | Technical Evaluation Rept for Boston Edison Co,Pilgrim Station Dcrdr Suppl Summary Rept. | |
ML19327B673 | 3 October 1989 | Technical Evaluation Rept for Dcrdr at Boston Edison Co, Pilgrim Nuclear Power Station. | |
ML20245G760 | 12 April 1989 | In-Progress Audit Rept of Dcrdr at Boston Edison Co Pilgrim Nuclear Power Station | |
ML20245G779 | 12 April 1989 | In-Progress Audit Rept for Boston Edison Co Pilgrim Nuclear Power Station Spds | |
ML20235H597 | 30 January 1989 | Evaluation of Pilgrim Offsite Dose Calculation Manual Through Rev 2 | Grab sample Offsite Dose Calculation Manual |
ML20154P680 | 31 May 1988 | Technical Evaluation Rept on Second 10-Yr Interval Inservice Insp Program Plan:Pilgrim Nuclear Power Station, Unit 1 | Hydrostatic VT-2 Incorporated by reference |
ML20235V152 | 31 August 1987 | Technical Evaluation Rept,Reactor Trip Sys Reliability Conformance to Item 4.5.2 of Generic Ltr 83-28,Peach Bottom 2 & 3,Perry 1 & 2,Pilgrim 1,Quad Cities 1 & 2,River Bend 1, Shoreham,Susquehanna 1 & 2,Vermont Yankee & WNP-2 | |
ML20214S520 | 31 March 1987 | Technical Evaluation Rept,Pump & Valve Inservice Testing Program,Pilgrim Nuclear Power Station, Informal Rept | Stroke time Hydrostatic Scram Discharge Volume Excess Flow Check Valve Power Operated Valves |
ML20245A448 | 30 September 1986 | Revised Draft Conformance to Generic Ltr 83-28 Item 2.1 (Part 1) Equipment Classification Hope Creek,Peach Bottom 2 & 3,Perry 1 & 2 & Pilgrim 1 | |
ML20206Q053 | 28 August 1986 | Evaluation of Fire Protection Exemption Requests from 10CFR50.48 & 10CFR50,App R,Pilgrim Nuclear Power Station, Technical Evaluation Rept | Safe Shutdown Fire Barrier Coatings Emergency Lighting Exemption Request Chernobyl Fuel cladding Fire Protection Program Backfit |
ML20212A707 | 24 July 1986 | Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Pilgrim Plant, Supplementary Technical Evaluation Rept | |
ML20206N279 | 30 June 1986 | Estimated Safety Significance of Generic Safety Issue 61 | Probabilistic Risk Assessment Earthquake |
ML20205N857 | 14 May 1986 | Masonry Wall Design, Technical Evaluation Rept for Pilgrim Nuclear Generating Station 1 | Tornado Missile Finite Element Analysis Earthquake |
ML20244D630 | 17 January 1986 | Draft Technical Evaluation Rept, Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events), Item 1.2, 'Post-Trip Review:Data & Info Capabilities....' | |
ML20138B593 | 31 October 1985 | Conformance to Reg Guide 1.97,Pilgrim Nuclear Power Station | Fuel cladding |
ML20244D398 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28,(Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.1, `Post-Trip Review:Program Description & Procedure' for La Salle County Station.. | |
ML20244D387 | 10 July 1985 | Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. | |
ML20134P985 | 30 June 1985 | Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 | |
ML20244D438 | 30 June 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities | |
ML20132D046 | 1 May 1985 | Technical Evaluation Rept,Second Interval Inservice Insp Program for Pilgrim Nuclear Power Station,Unit 1 | Hydrostatic Dissimilar Metal Weld |
ML20127D631 | 10 April 1985 | Technical Evaluation Rept of Dcrdr for Pilgrim Nuclear Station | Scram Discharge Volume Failure to Scram |
ML20106C166 | 31 January 1985 | Control of Heavy Loads,Pilgrim Nuclear Power Station, Technical Evaluation Rept | Safe Shutdown Coatings Control of Heavy Loads |
ML20106A579 | 30 September 1984 | Technical Evaluation of Pilgrim I Plant-Unique Analysis Rept | |
ML20106A557 | 26 September 1984 | Audit for Mark I Containment Long-Term Program Structural Analysis for Operating Reactors,Pilgrim Station Unit 1, Technical Evaluation Rept | Finite Element Analysis |
ML20091J570 | 9 April 1984 | Franklin Research Ctr Comments on Pilgrim Radiological Effluent Tech Specs Submittal (Dtd 830415) | |
ML20084E676 | 31 January 1984 | Rev 1 to Technical Evaluation of Electrical,Instrumentation & Control Design Aspects of Override of Containment Purge Valve Isolation & Other ESF Signals for Pilgrim Nuclear Power Station,Unit 1 | |
ML20093A576 | 31 August 1983 | Technical Evaluation of Integrity of Pilgrim Nuclear Power Station Unit 1 Reactor Coolant Boundary Piping Sys | Weld Overlay Earthquake Pressure boundary leak Dissimilar Metal Weld |
ML20204F260 | 8 March 1983 | Selected Operating Reactor Issues Program Ii:Rcs Vents, Final Technical Evaluation Rept | |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20076B656 | 28 September 1982 | ECCS Repts (F-47) TMI Action Plan Requirements,Boston Edison Co,Pilgram Nuclear Power Station, Technical Evaluation Rept | |
ML20071L388 | 17 September 1982 | Inservice Insp Program, Technical Evaluation Rept | Hydrostatic Nondestructive Examination Incorporated by reference |
ML20069D159 | 20 August 1982 | Technical Evaluation Rept (Revision 1) on Proposed Design Mods & Tech Spec Changes on Grid Voltage Degradation for Pilgrim Nuclear Power Station,Unit 1 | |
ML20028C681 | 17 August 1982 | Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Pilgrim Nuclear Power Station, Technical Evaluation Rept | Fuel cladding Power change |
ML20062B794 | 29 April 1982 | Monitoring of Electric Power to Reactor Protection Sys for Pilgrim Nuclear Power Station, Technical Evaluation Rept | |
ML20049J405 | 1 March 1982 | Technical Evaluation of Response to Attachment 2 of Item II.F.1 of NUREG-0737,Addl Accident Monitoring Instrumentation. | |
ML19331E086 | 21 July 1980 | Primary Coolant Sys Pressure Isolation Valves,Pilgrim Unit 1, Technical Evaluation Rept | |
ML19323G163 | 20 May 1980 | Miscellaneous Nozzle Cracking,Pilgrim Unit 1, Technical Evaluation Rept | |
ML20150B630 | 31 October 1978 | Evaluation of Radioiodine Measurements at Pilgrim Nuclear Power Plant | Grab sample |