Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22332A45110 November 2022Attachment 3 - Markup of Technical Specification Bases Pages (for Information Only)Unanalyzed Condition
Anticipated operational occurrence
Hydrostatic
RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration3 October 2022Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the PenetrationReactor Vessel Water Level
ML22111A25713 April 2022Technical Specification Bases
RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements18 November 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) EnhancementsReactor Vessel Water Level
Water Inventory Control
Surveillance Frequency Control Program
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Scaffolding
RS-20-029, Technical Specification Bases13 April 2020Technical Specification Bases
RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b31 January 2020Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability27 June 2019Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System OperabilityFire Barrier
Tornado Missile
Internal Flooding
Incorporated by reference
Turbine Missile
RS-18-028, License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel Generator19 April 2018License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High Pressure Core Spray Diesel GeneratorSafe Shutdown
Reactor Vessel Water Level
Surveillance Frequency Control Program
Battery sizing
Maintenance Rule Program
Fuel cladding
Offsite Circuit
RS-18-044, Revised Technical Specification Bases11 April 2018Revised Technical Specification Bases
RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System24 January 2018License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling SystemSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
ML16209A21826 July 2016Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing.Shutdown Margin
Reactor Vessel Water Level
Packing leak
High Radiation Area
Stroke time
Hydrostatic
Squib
Incorporated by reference
Missed surveillance
Surveillance Frequency Control Program
Excess Flow Check Valve
Power Operated Valves
Pressure Boundary Leakage
Recently irradiated fuel
Power change
Unidentified leakage
RS-16-080, Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases11 April 2016Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases
RS-15-002, License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating12 January 2015License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating
RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of.22 December 2014License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use Of.Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Hydrostatic
Incorporated by reference
RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process14 July 2014Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement ProcessReactor Vessel Water Level
Ultimate heat sink
Stroke time
Hydrostatic
Surveillance Frequency Control Program
Power Operated Valves
RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.4 April 2011License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation.Grab sample
RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.22 February 2010Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.Hot Short
Safe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Mission time
Fire Barrier
Anticipated operational occurrence
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Squib
Multiple Spurious Operation
Scram Discharge Volume
Large early release frequency
B.5.b Mitigating Strategies
Maintenance Rule Program
Turbine Missile
Fuel cladding
Power change
ML10032130727 January 2010Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual PagesOffsite Dose Calculation Manual
Scram Discharge Volume
RS-10-001, LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages27 January 2010LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual PagesOffsite Dose Calculation Manual
Scram Discharge Volume
RS-08-045, Technical Specification Bases14 April 2008Technical Specification Bases
RS-07-069, Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink29 June 2007Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat SinkSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Reverse polarity
RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process12 April 2007Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Offsite Dose Calculation Manual
Probabilistic Risk Assessment
Incorporated by reference
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Recently irradiated fuel
Fire Protection Program
ML0504902694 February 2005Request for Change to Technical Specifications Traversing In-core Probe (TIP) SystemReactor Vessel Water Level
Probabilistic Risk Assessment
Scram Discharge Volume
Spiral reload
RS-03-031, Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.818 April 2003Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8Squib