Category:License-Application for Export License
[Table view] Category:Manual
MONTHYEARML22111A2562022-04-13013 April 2022 Technical Requirements Manual ML22119A0322021-09-30030 September 2021 Offsite Dose Calculation Manual Part I RECS & Part II ODCM RA22-015, Part II, Offsite Dose Calculation Manual2021-09-30030 September 2021 Part II, Offsite Dose Calculation Manual ML20111A2742020-04-13013 April 2020 Technical Requirements Manual ML18117A0472018-04-11011 April 2018 Revised Technical Requirements Manual ML14113A1322014-04-11011 April 2014 Updated Final Safety Analysis Report, Revision 20, Technical Requirements Manual RS-14-128, LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Technical Requirements Manual2014-04-11011 April 2014 LaSalle, Units 1 & 2, Updated Final Safety Analysis Report, Revision 20, Technical Requirements Manual ZS-2014-0100, Offsite Dose Calculation Manual2013-12-31031 December 2013 Offsite Dose Calculation Manual ML13128A0592013-04-26026 April 2013 CY-LA-170-301, Rev 4, Offsite Dose Calculation Manual RA11-021, Appendix a & B, Offsite Dose Calculation Manual, Revision 2, LaSalle, Units 1 and 22011-04-26026 April 2011 Appendix a & B, Offsite Dose Calculation Manual, Revision 2, LaSalle, Units 1 and 2 ML1003213072010-01-27027 January 2010 Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages RS-10-001, LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages2010-01-27027 January 2010 LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages RS-08-045, LaSalle, Units 1 and 2, Technical Requirements Manual2008-04-14014 April 2008 LaSalle, Units 1 and 2, Technical Requirements Manual ML0813300892008-04-14014 April 2008 Technical Requirements Manual ML0712004052007-04-25025 April 2007 Offsite Does Calculation Manual for Dresden, Quad Cities, Zion, LaSalle, Byron & Braidwood ML0612405622006-04-28028 April 2006 CV-LA-170-301, Rev 0, Offsite Dose Calculation Manual Part I Recs, Part II ODCM, LaSalle Units 1 and 2 ML0511203392004-12-31031 December 2004 Offsite Dose Calculation Manual for 2004 ML0233807462002-11-26026 November 2002 Part 2 of 2, LaSalle, Unit 1 Cycle 10A Core Operating Limits Report (COLR) ML0208102542002-03-12012 March 2002 Technical Requirements Manual Appendix J, LaSalle Unit 2 Cycle 9 Core Operating Report and Reload Transient Analysis Results February 2002 ML0609606232002-01-31031 January 2002 Offsite Dose Calculation Manual, Revision 3, January 2002 ML0610805602001-01-31031 January 2001 Offsite Dose Calculation Manual; Zion Summary of Changes for Chapter 12, Revision 15 2022-04-13
[Table view] Category:Technical Specification
MONTHYEARML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22332A4512022-11-10010 November 2022 Attachment 3 - Markup of Technical Specification Bases Pages (for Information Only) RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML22111A2572022-04-13013 April 2022 Technical Specification Bases RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-087, Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink2020-07-17017 July 2020 Request for a License Amendment to LaSalle County Station, Units 1 and 2, Technical Specification 3.7.3, Ultimate Heat Sink JAFP-20-0049, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2020-06-22022 June 2020 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-20-029, Technical Specification Bases2020-04-13013 April 2020 Technical Specification Bases RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-01-31031 January 2020 Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-19-039, Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls2019-06-26026 June 2019 Fleet License Amendment Request - Common Language for Technical Specification High Radiation Area Administrative Controls RS-18-044, Revised Technical Specification Bases2018-04-11011 April 2018 Revised Technical Specification Bases RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-01-24024 January 2018 License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System RS-16-191, License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-10-26026 October 2016 License Amendment Request to Revise Technical Specifications 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RS-16-080, Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases2016-04-11011 April 2016 Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases RS-15-002, License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating2015-01-12012 January 2015 License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use of2014-12-22022 December 2014 License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use of RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process RS-12-184, Request to Revise Technical Specification 2.1.1.2 for Minimum Critical Power Ratio Safety Limit - Cycle 152012-10-11011 October 2012 Request to Revise Technical Specification 2.1.1.2 for Minimum Critical Power Ratio Safety Limit - Cycle 15 RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-0404 April 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System2010-02-22022 February 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System ML1003213072010-01-27027 January 2010 Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages RS-10-001, LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages2010-01-27027 January 2010 LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages ML0831001492008-10-23023 October 2008 Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 RS-08-132, LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 52008-10-23023 October 2008 LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses RA-08-047, Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item I2008-06-0909 June 2008 Application for Technical Specification Change Regarding Revision of Control Rod Notch Surveillance Test Frequency, Clarification of SRM Insert Control Rod Action and Clarification of a Frequency Example Using the Consolidation Line Item Im RS-08-045, Technical Specification Bases2008-04-14014 April 2008 Technical Specification Bases RS-07-165, License Amendment Request Regarding Spent Fuel Storage Pool Criticality2007-12-13013 December 2007 License Amendment Request Regarding Spent Fuel Storage Pool Criticality RS-07-069, Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink2007-06-29029 June 2007 Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process RS-07-034, Additional Information Supporting the License Amendment Request Associated with Revised Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection2007-04-0606 April 2007 Additional Information Supporting the License Amendment Request Associated with Revised Allowable Values for Reactor Core Isolation Cooling Temperature Based Leak Detection RS-06-181, Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report2006-12-15015 December 2006 Plants, Request for Technical Specification Change to Provide Consistency with EGC Quality Assurance Topical Report RS-06-154, Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program2006-11-17017 November 2006 Request for Amendment to Technical Specifications Section 5.5.7, Inservice Testing Program RS-06-089, Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power2006-08-16016 August 2006 Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power ML0504902692005-02-0404 February 2005 Request for Change to Technical Specifications Traversing In-core Probe (TIP) System ML0434900702004-12-10010 December 2004 Tech Spec Pages for License Amendments 170 & 156, Pressure-Temperature Limits RS-04-125, Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program2004-11-29029 November 2004 Exelon/Amergen Request for Amendment to Technical Specifications Administrative Controls to Incorporate Requirement for Control Room Envelope Integrity Program RS-04-067, Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2004-04-30030 April 2004 Amergen, Request for Amendment to Technical Specifications Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RS-03-079, Request for Amendment to Technical Specifications, Surveillance Requirement 3.7.7.1 for Turbine Bypass Valve Testing2003-05-19019 May 2003 Request for Amendment to Technical Specifications, Surveillance Requirement 3.7.7.1 for Turbine Bypass Valve Testing RS-03-031, Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.82003-04-18018 April 2003 Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8 RS-03-040, Request for Amendment to Technical Specifications Section 5.7, High Radiation Area2003-03-31031 March 2003 Request for Amendment to Technical Specifications Section 5.7, High Radiation Area RS-03-029, Request for Amendment to Technical Specifications Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation2003-03-31031 March 2003 Request for Amendment to Technical Specifications Table 3.3.5.1-1, Emergency Core Cooling System Instrumentation ML0234505702002-11-27027 November 2002 Request for Technical Specifications Change to Eliminate Requirements for Post Accident Sampling System Using the Consolidated Line Item Improvement Process RS-02-164, Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program2002-10-24024 October 2002 Request for Amendment to Technical Specification 5.5.13, Primary Containment Leakage Rate Testing Program RS-02-110, Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation2002-07-0808 July 2002 Request for Amendment to Technical Specifications Table 3.3.8.1-1, Loss of Power Instrumentation RS-02-076, Request for Amendment to Technical Specifications, Excess Flow Check Valve Testing Surveillance Requirement 3.6.1.3.8 & Relief Request RV-122002-05-31031 May 2002 Request for Amendment to Technical Specifications, Excess Flow Check Valve Testing Surveillance Requirement 3.6.1.3.8 & Relief Request RV-12 2024-04-12
[Table view] Category:Bases Change
MONTHYEARML22332A4512022-11-10010 November 2022 Attachment 3 - Markup of Technical Specification Bases Pages (for Information Only) RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML22111A2572022-04-13013 April 2022 Technical Specification Bases RS-20-115, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-11-18018 November 2020 Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements RS-20-029, Technical Specification Bases2020-04-13013 April 2020 Technical Specification Bases RS-20-009, Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2020-01-31031 January 2020 Application to Revise LaSalle County Station Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b JAFP-19-0067, Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability2019-06-27027 June 2019 Application to Adopt TSTF-427, Revision 2, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability RS-18-044, Revised Technical Specification Bases2018-04-11011 April 2018 Revised Technical Specification Bases RS-18-009, License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-01-24024 January 2018 License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System ML16209A2182016-07-26026 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing RS-16-080, Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases2016-04-11011 April 2016 Updated Final Safety Analysis Report (Ufsar), Revision 22, Technical Specification Bases RS-15-002, License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating2015-01-12012 January 2015 License Amendment Request to Revise Technical Specifications Sections 3.5.1, ECCS - Operating RS-14-322, License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use of2014-12-22022 December 2014 License Amendment Request for Addition of New LCO 3.10.8 for Reactor Vessel Hydrostatic and Leak Testing Requirements and for Adoption of TSTF-484, Revision 0, Use of RS-14-192, Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process2014-07-14014 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Revision 2, Using the Consolidated Line Item Improvement Process RS-11-036, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation2011-04-0404 April 2011 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation RS-10-015, Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System2010-02-22022 February 2010 Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System ML1003213072010-01-27027 January 2010 Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages RS-10-001, LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages2010-01-27027 January 2010 LaSalle, Units 1 and 2, Attachment 3 - Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages RS-08-045, Technical Specification Bases2008-04-14014 April 2008 Technical Specification Bases RS-07-069, Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink2007-06-29029 June 2007 Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink RS-07-020, Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process2007-04-12012 April 2007 Exelon/Amergen Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process ML0504902692005-02-0404 February 2005 Request for Change to Technical Specifications Traversing In-core Probe (TIP) System RS-03-031, Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.82003-04-18018 April 2003 Request for Amendment to Technical Specifications Surveillance Requirement 3.6.1.3.8 2022-04-13
[Table view] |
Text
ATTACHMENT 3 Markup of Proposed Technical Specifications Bases and Technical Requirements Manual Pages LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 REVISED TECHNICAL SPECIFICATIONS BASES PAGES 3.3.1.1-31 3.3.1.3-3 3.3.1.3-8 3.3.1.3-9 REVISED TECHNICAL REQUIREMENTS MANUAL PAGES 1.1-3 3.3.c-5 3.3.q-1 3.3.q-2 Appendix D, Page D-1
RPS Instrumentation B 3.3.1.1 LaSalle 1 and 2 B 3.3.1.1-31 Revision 13 BASES SURVEILLANCE SR 3.3.1.1.9 and SR 3.3.1.1.12 (continued)
REQUIREMENTS transient if the Surveillance were performed with the reactor at power. Operating experience has shown that these components usually pass the Surveillance when performed at the 24 month Frequency.
SR 3.3.1.1.10, SR 3.3.1.1.11, and SR 3.3.1.1.13 A CHANNEL CALIBRATION is a complete check of the instrument loop, including associated trip unit, and the sensor. This test verifies the channel responds to the measured parameter within the necessary range and accuracy. CHANNEL CALIBRATION leaves the channel adjusted to account for instrument drifts between successive calibrations consistent with the plant specific setpoint methodology.
Note 1 of SR 3.3.1.1.11 and SR 3.3.1.1.13 states that neutron detectors are excluded from CHANNEL CALIBRATION because of the difficulty of simulating a meaningful signal.
Changes in neutron detector sensitivity are compensated for by performing the 7 day calorimetric calibration (SR 3.3.1.1.2) and the 1000 EFPH LPRM calibration against the TIPs (SR 3.3.1.1.8). A second Note to SR 3.3.1.1.11 and SR 3.3.1.1.13 is provided that requires the APRM and IRM SRs to be performed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of entering MODE 2 from MODE
- 1. Testing of the MODE 2 APRM and IRM Functions cannot be performed in MODE 1 without utilizing jumpers, lifted leads, or movable links. This Note allows entry into MODE 2 from MODE 1 if the associated Frequency is not met per SR 3.0.2.
Twenty-four hours is based on operating experience and in consideration of providing a reasonable time in which to complete the SR. The Frequencies of SR 3.3.1.1.10 and SR 3.3.1.1.11 are based upon the assumption of a 92 day and 184 day calibration interval, respectively, in the determination of the magnitude of equipment drift in the setpoint analysis. The Frequency of SR 3.3.1.1.13 is based on the assumption of a 24 month calibration interval in the determination of the magnitude of equipment drift in the setpoint analysis.
(continued)
Insert 1
TS Bases Inserts Bases Insert 1 For Function 2.b, SR 3.3.1.1.11 is modified by two Notes. The first Note requires evaluation of channel performance for the condition where the as-found setting for the channel setpoint is outside its as-found tolerance but conservative with respect to the Allowable Value. Evaluation of channel performance will verify that the channel will continue to behave in accordance with safety analysis assumptions and the channel performance assumptions in the setpoint methodology. The purpose of the assessment is to ensure confidence in the channel performance prior to returning the channel to service. For channels determined to be OPERABLE but degraded, after returning the channel to service the performance of these channels will be evaluated under the plant Corrective Action Program. Entry into the Corrective Action Program will ensure required review and documentation of the condition. The second Note requires that the as-left setting for the channel be within the as-left tolerance of the nominal trip setpoint (NTSP). Where a setpoint more conservative than the NTSP is used in the plant surveillance procedures, the as-left and as-found tolerances, as applicable, will be applied to the surveillance procedure setpoint. This will ensure that sufficient margin to the Safety Limit and/or Analytical Limit is maintained. If the as-left channel setting cannot be returned to a setting within the as-left tolerance of the NTSP, then the channel shall be declared inoperable.
OPRM Instrumentation B 3.3.1.3 LaSalle 1 and 2 B 3.3.1.3-3 Revision 23 BASES APPLICABLE The nominal setpoints for the OPRM Period Based Trip SAFETY ANALYSES Function are specified in the Core Operating Limits Report.
(continued)
The trip setpoints are treated as nominal setpoints and do not require additional allowances for uncertainty.
Trip setpoints are those predetermined values of output at which an action should take place. The setpoints are compared to the actual process parameter value and when the measured output value of the process parameter exceeds the setpoint, the associated device (e.g., trip unit) changes state.
The OPRM period based setpoint is determined by cycle specific analysis based on positive margin between the Safety Limit MCPR and the Operating Limit MCPR minus the change in CPR (CPR). This methodology was approved for use by the NRC in Reference 5.
LCO Four channels of the OPRM System are required to be OPERABLE to ensure that stability related oscillations are detected and suppressed prior to exceeding the MCPR safety limit. Only one of the two OPRM modules (with an active period based detection algorithm) is required for OPRM channel OPERABILITY. The minimum number of LPRMs required to maintain the APRM system OPERABLE per LCO 3.3.1.1 provides an adequate number of LPRMs to maintain an OPRM channel OPERABLE.
APPLICABILITY The OPRM instrumentation is required to be OPERABLE in order to detect and suppress neutron flux oscillations in the event of thermal-hydraulic instability. As described in References 1, 2, 3, and 9, the region of anticipated oscillation is defined by THERMAL POWER 28.6% rated thermal power (RTP) and recirculation drive flow < 60% of rated recirculation drive flow. The OPRM trip is required to be enabled in this region, and the OPRM must be capable of enabling the trip function as a result of anticipated transients that place the core in that power/flow condition. Therefore the OPRM instrumentation is required to be OPERABLE with THERMAL POWER 25% RTP. It is not necessary for the OPRM instrumentation to be OPERABLE with THERMAL POWER < 25% RTP because the MCPR safety limit is not applicable below 25% RTP.
(continued) 28.1%
OPRM Instrumentation B 3.3.1.3 LaSalle 1 and 2 B 3.3.1.3-8 Revision 23 BASES SURVEILLANCE SR 3.3.1.3.3 (continued)
REQUIREMENTS The nominal setpoints for the OPRM trip function for the period based detection algorithm (PBDA) are specified in the Core Operating Limits Report. The PBDA trip setpoints are the number of confirmation counts required to permit a trip signal and the peak to average amplitude required to generate a trip signal.
The Frequency of 24 months is based upon the assumption of the magnitude of equipment drift provided by the equipment supplier (Ref. 6).
SR 3.3.1.3.4 The LOGIC SYSTEM FUNCTIONAL TEST demonstrates the OPERABILITY of the required trip logic for a specific channel. The functional testing of control rods, in LCO 3.1.3, "Control Rod OPERABILITY," and scram discharge volume (SDV) vent and drain valves, in LCO 3.1.8, "Scram Discharge Volume (SDV) Vent and Drain Valves," overlaps this Surveillance to provide complete testing of the assumed safety function. The OPRM self-test function may be utilized to perform this testing for those components that it is designed to monitor.
The 24 month Frequency is based on engineering judgment and reliability of the components. Operating experience has shown these components usually pass the surveillance when performed at the 24 month Frequency.
SR 3.3.1.3.5 This SR ensures that trips initiated from the OPRM System will not be bypassed (i.e., fail to enable) when THERMAL POWER is 28.6% RTP and recirculation drive flow is < 60%
of rated recirculation drive flow. This normally involves calibration of the bypass channels. The 28.6% RTP value is the plant specific value for the enable region, as described in Reference 9.
These values have been conservatively selected so that specific, additional uncertainty allowances need not be applied. Specifically, the THERMAL POWER, the Average Power Range Monitor (APRM) establishes the reference signal to enable the OPRM system at 28.6% RTP. Thus, the nominal (continued) 28.1%
28.1%
OPRM Instrumentation B 3.3.1.3 LaSalle 1 and 2 B 3.3.1.3-9 Revision 23 BASES SURVEILLANCE SR 3.3.1.3.5 (continued)
REQUIREMENTS setpoints corresponding to the values listed above (28.6%
of RTP and 60% of rated recirculation drive flow) will be used to establish the enabled region of the OPRM System trips. (References 1, 2, 5, 9, and 11)
If any bypass channel setpoint is nonconservative (i.e.,
the OPRM module is bypassed at 28.6% RTP and < 60% of rated recirculation drive flow), then the affected OPRM module is considered inoperable. Alternately, the bypass channel can be placed in the conservative condition (nonbypass). If placed in the nonbypass condition, this SR is met and the module is considered OPERABLE.
The Frequency of 24 months is based on engineering judgment and reliability components.
SR 3.3.1.3.6 This SR ensures that the individual channel response times are less than or equal to the maximum values assumed in the accident analysis. The OPRM self-test function may be utilized to perform this testing for those components it is designed to monitor. The RPS RESPONSE TIME acceptance criteria are included in Reference 10.
RPS RESPONSE TIME may be verified by actual response time measurements in any series of sequential, overlapping, or total channel measurements. As noted, neutron detectors are excluded from RPS RESPONSE TIME testing because the principles of detector operation virtually ensure an instantaneous response time. RPS RESPONSE TIME tests are conducted on a 24 month STAGGERED TEST BASIS. This Frequency is consistent with the refueling cycle and is based upon operating experience, which shows that random failures of instrumentation components causing serious time degradation, but not channel failure, are infrequent.
REFERENCES
- 1.
NEDC-39160, "BWR Owners Group Long-Term Stability Solutions Licensing Methodology," June 1991.
- 2.
NEDO-39160, "BWR Owners Group Long-Term Stability Solutions Licensing Methodology," Supplement 1, March 1992.
(continued) 28.1%
28.1%
TRM Definitions 1.1 LaSalle 1 and 2 1.1-3 Revision 1 1.1 Definitions (continued)
OFFSITE DOSE CALCULATION MANUAL (ODCM)
The ODCM shall contain the methodology and parameters used in the calculation of offsite doses resulting from radioactive gaseous and liquid effluents, in the calculation of gaseous and liquid effluent monitoring Alarm/Trip Setpoints, and in the conduct of the Environmental Radiological Monitoring Program. The ODCM shall also contain (1) the Radioactive Effluent Controls and Radiological Environmental Monitoring Program and (2) descriptions of the information that should be included in the Annual Radiological Environmental Operating and Radioactive Effluent Release Reports.
OPERABLE -
OPERABILITY A system, subsystem, division, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified function(s) and when all necessary attendant instrumentation, controls, normal or emergency electrical power, cooling and seal water, lubrication, and other auxiliary equipment that are required for the system, subsystem, division, component, or device to perform its specified function(s) are also capable of performing their related support function(s).
RATED THERMAL POWER (RTP)
RTP shall be a total reactor core heat transfer rate to the reactor coolant of 3489 MWt.
THERMAL POWER THERMAL POWER shall be the total reactor core heat transfer rate to the reactor coolant.
3546
TRM Control Rod Block Instrumentation 3.3.c LaSalle 1 and 2 3.3.c-5 Revision 2 Table T3.3.c-1 (page 1 of 2)
Control Rod Block Instrumentation FUNCTION APPLICABLE MODES OR OTHER SPECIFIED CONDITIONS REQUIRED CHANNELS PER FUNCTION SURVEILLANCE REQUIREMENTS ALLOWABLE VALUE
- 1.
Average Power Range Monitors
- a.
Flow Biased Neutron Flux - Upscale 1
4 TSR 3.3.c.2 TSR 3.3.c.4 0.62W +
57.9%(a) RTP
- b.
Inoperative 1,2 4
TSR 3.3.c.2 N.A.
- c.
Downscale 1
4 TSR 3.3.c.2 TSR 3.3.c.4 3% RTP
- d.
Neutron Flux - High 2
4 TSR 3.3.c.2 TSR 3.3.c.4 14% RTP
- 2.
Source Range Monitors
- a.
Detector not full in 2(b) 5 3
2 TSR 3.3.c.1 TSR 3.3.c.1 N.A.
N.A.
- b.
Upscale 2(c) 5 3
2 TSR 3.3.c.1 TSR 3.3.c.5 TSR 3.3.c.1 TSR 3.3.c.5 5 x 105 cps 5 x 105 cps
- c.
Inoperative 2(c) 5 3
2 TSR 3.3.c.1 TSR 3.3.c.1 N.A.
N.A.
- d.
Downscale 2(d) 5 3
2 TSR 3.3.c.1 TSR 3.3.c.5 TSR 3.3.c.1 TSR 3.3.c.5 0.5 cps 0.5 cps (a)
Allowable Value is (0.55W + 45.4%) RTP when reset for single loop operation per Technical Specification 3.4.1, Recirculation Loops Operating.
(b)
With detector count rate < 100 cps and the Intermediate Range Monitor (IRM) channels are on range 2 or below.
(c)
With IRM channels on range 7 or below.
(d)
With IRM channels on range 2 or below.
0.61W + 56.9%
(0.54W + 44.7%)
TRM Feedwater Flow Instrumentation 3.3.q LaSalle 1 and 2 3.3.q-1 Revision 0 3.3 INSTRUMENTATION 3.3.q Feedwater Flow Instrumentation TLCO 3.3.q The Leading Edge Flow Meter instrumentation system shall be OPERABLE.
APPLICABILITY:
MODE 1, with THERMAL POWER > 3489 MWt ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more systems inoperable.
A.1 Restore required instruments to OPERABLE status.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B.
REQUIRED ACTION and associated COMPLETION TIME of CONDITION A not met.
B.1 Reduce power to < 3489 MWt.
Immediately
TRM Feedwater Flow Instrumentation 3.3.q LaSalle 1 and 2 3.3.q-2 Revision 0 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY TSR 3.3.q.1 Perform CHANNEL CHECK.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />
TRM Appendix D Instrumentation Trip Setpoints Table T3.3.1.1-1 (page 1 of 1)
Reactor Protection System Instrumentation Trip Setpoints FUNCTION 1.
Intermediate Range Monitors a.
Neutron Flux -
High b.
Inop 2.
Average Power Range Monitors a.
Neutron Flux -
High, Setdown b.
Flow Biased Simulated Thermal Power -
Upscale c.
Fixed Neutron Flux -
High d.
Inop 3.
Reactor Vessel Steam Dome Pressure -
High 4.
Reactor Vessel Water Level -
Low, Level 3 5.
Main Steam Isolation Valve -
Closure 6.
Drywell Pressure -
High 7.
Scram Discharge Volume Water Level -
High a.
Transmitter/Trip Unit b.
Float Switch 8.
Turbine Stop Valve -
Closure 9.
Turbine Control Valve Fast Closure, Trip Oil Pressure -
Low 10.
Reactor Mode Switch -
Shutdown Position 11.
Manual Scram NOMINAL TRIP SETPOINT CALCULATION NUMBER L-001344 NA L-001345 L-001345(a)
L-001345 NA NED-I-EIC-0174 NED-I-EIC-0201 (Unit 1)
NED-I-EIC-0203 (Unit 2)
L-002596 NED-I-EIC-0178 NED-EIC-0179 NED-I-EIC-0263 L-002596 NED-I-EIC-0181 NA NA (a)
Nominal Trip Setpoint is shown in calculation L-001345 for single loop operation per LCO 3.4.1, "Recirculation Loops Operating."
LaSalle 1 and 2 D-1 Revision 0
, (b)
(b) The as-left tolerance for this function is calculated using the square-root-sum-of-squares of the reference accuracy and the measurement and test equipment error (including readability). The as-found tolerance for this function is calculated using the square-root-sum-of-squares of the reference accuracy, instrument drift, and the measurement and test equipment error (including readability).