ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) | 20 November 2023 | Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) | |
ML23310A051 | 6 November 2023 | EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Emergency Lighting FLEX Spent Fuel Pool Instrumentation Safeguards Contingency Plan Earthquake Fuel cladding Pressure Boundary Leakage Offsite Circuit Grace period Power change Unidentified leakage |
ML23227A127 | 15 August 2023 | Corrected Proposed Technical Specification 55.16 Changes (Markup) | |
ML23227A128 | 15 August 2023 | Corrected Proposed Technical Specification 5.5.16 Changes (Clean Pages) | |
ML23088A123 | 29 March 2023 | Attachment 3: Marked-Up Technical Specification, Bases Pages | Safe Shutdown Surveillance Frequency Control Program |
ML23088A254 | 23 March 2023 | EIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases Document | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Emergency Lighting FLEX Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Offsite Circuit Grace period Power change |
ML23052A047 | 21 February 2023 | Enclosure 5 - Revised Technical Specification Bases (for Information Only) | |
ML23067A175 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter 3.3, Instrumentation | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Post Accident Monitoring Surveillance Frequency Control Program |
ML23067A178 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter 3.6, Containment Systems | High Radiation Area Stroke time Surveillance Frequency Control Program Power Operated Valves |
ML23067A176 | 29 December 2022 | Rev. 18 to Technical Specification Bases, Chapter 3.5, Emergency Core Cooling System S(Eccs) | Boric Acid Stroke time Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML23067A174 | 29 December 2022 | Rev. 18 to Technical Specifications, Bases Change, Chapter 3.7, Plant Systems | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Anticipated operational occurrence Tornado Missile Tornado Missile Protection Surveillance Frequency Control Program Earthquake Power change |
ML23067A177 | 29 December 2022 | Rev. 18 to Technical Specification Bases Change, Chapter B3, Safety Limits (Sls) | Incorporated by reference Missed surveillance |
ML23067A179 | 29 December 2022 | Rev. 18 to Technical Specification Bases, Implemented Change Notice Log | |
ML23067A181 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter B2, Safety Limits (Sls) | Anticipated operational occurrence Fuel cladding |
ML23067A180 | 29 December 2022 | Rev. 18 to Technical Specification Bases, Chapter 3.1, Reactivity Control Systems | Boric Acid Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding |
ML23067A182 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter 3.8, Electrical Power Systems | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Surveillance Frequency Control Program Open Phase Condition Battery sizing Offsite Circuit |
ML23067A183 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Table of Contents | Shutdown Margin Ultimate heat sink Post Accident Monitoring |
ML23067A185 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter B 3.9, Refueling Operations | Boric Acid Shutdown Margin Surveillance Frequency Control Program Fuel cladding |
ML23067A186 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter 3.2, Power Distribution Limits | Surveillance Frequency Control Program Fuel cladding Power change |
ULNRC-06782, Rev. 18 to Technical Specification Bases, List of Effective Sections | 29 December 2022 | Rev. 18 to Technical Specification Bases, List of Effective Sections | |
ML23067A184 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter 3.4, Reactor Coolant System | Unanalyzed Condition Boric Acid Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Hydrostatic Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage |
ML22335A509 | 1 December 2022 | Description and Assessment of the Proposed Change | Safe Shutdown Boric Acid Ultimate heat sink Earthquake Fuel cladding |
ML22335A511 | 1 December 2022 | Attachment 2 - Proposed TS Bases Changes (Markups) | Boric Acid Surveillance Frequency Control Program Fuel cladding |
ML22307A314 | 3 November 2022 | Attachment 2: Proposed Technical Specification 5.5.16 Changes (Markup) | |
ML22307A315 | 3 November 2022 | Attachment 3: Proposed Technical Specification 5.5.16 Changes (Clean Pages) | |
ML22285A120 | 12 October 2022 | Attachment 3 to Enclosure 1: Marked-Up Technical Specifications Bases (for Information Only) | Anticipated operational occurrence Fuel cladding |
ML22242A127 | 29 August 2022 | Attachment 3 to Enclosure 1 - Marked-Up Technical Specification Bases | Surveillance Frequency Control Program |
ML22216A242 | 4 August 2022 | Proposed Technical Specification Changes (Mark-Up) | Nondestructive Examination |
ML22181B134 | 30 June 2022 | Attachment 4 - Replacement for Attachment 4, Proposed Changes to Technical Specification Bases Changes (Mark-Up) Pages (for Information), of ULNRC-06688 | Safe Shutdown Shutdown Margin High Radiation Area Surveillance Frequency Control Program Power Operated Valves Offsite Circuit |
ML22153A179 | 2 June 2022 | Attachment 3 - Marked-Up Technical Specifications Bases | Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding Power change |
ULNRC-06686, Attachment 4: Proposed Technical Specifications Bases Changes (Mark-Up) | 9 December 2021 | Attachment 4: Proposed Technical Specifications Bases Changes (Mark-Up) | Stroke time Incorporated by reference Missed surveillance |
ML21335A457 | 1 December 2021 | Enclosure 5: Proposed Technical Specification Bases Changes (Mark-up - for Info Only) | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage |
ML21294A398 | 21 October 2021 | Attachment 4 - Proposed Changes to Technical Specification Bases Changes (Mark-Up) Pages (for Information) | Safe Shutdown Shutdown Margin High Radiation Area Surveillance Frequency Control Program Power Operated Valves Offsite Circuit |
ML21272A173 | 28 September 2021 | Enclosure 5 - Proposed TS Bases Changes (for Information Only) | Safe Shutdown Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage |
ML21272A172 | 28 September 2021 | Enclosure 4 - Revised Technical Specification Pages | Surveillance Frequency Control Program |
ML21272A171 | 28 September 2021 | Enclosure 3 - Proposed Technical Specification Changes (Mark-up) | Surveillance Frequency Control Program |
ML21194A269 | 22 June 2021 | Technical Specification Bases, Table of Contents | Shutdown Margin Ultimate heat sink Post Accident Monitoring |
ML21195A321 | 22 June 2021 | Technical Specification Bases Implemented Change Notice Log | |
ML21194A273 | 22 June 2021 | Technical Specification Bases, List of Effective Sections | |
ML21194A272 | 22 June 2021 | Technical Specification Bases, Chapter B 3.2, Power Distribution Limits | Surveillance Frequency Control Program Fuel cladding Power change |
ML21194A261 | 22 June 2021 | Technical Specification Bases, Chapter B 3.7, Plant Systems | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Anticipated operational occurrence Tornado Missile Surveillance Frequency Control Program Earthquake Power change |
ML21194A262 | 22 June 2021 | Technical Specification Bases, Chapter 3.3, Instrumentation | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Post Accident Monitoring Surveillance Frequency Control Program |
ML21194A263 | 22 June 2021 | Technical Specification Bases, Chapter B 3.5, Emergency Core Cooling Systems (ECCS) | Boric Acid Stroke time Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML21194A264 | 22 June 2021 | Technical Specification Bases, Chapter B 3.0, Safety Limits (Sls) | Stroke time Incorporated by reference Missed surveillance |
ML21194A265 | 22 June 2021 | Technical Specification Bases, Chapter B 3.6, Containment Systems | High Radiation Area Stroke time Surveillance Frequency Control Program Power Operated Valves |
ML21194A266 | 22 June 2021 | Technical Specification Bases, Chapter B 3.1, Reactivity Control Systems | Boric Acid Shutdown Margin Anticipated operational occurrence Surveillance Frequency Control Program Fuel cladding |
ML21194A267 | 22 June 2021 | Technical Specification Bases, Chapter 2.0, Safety Limits (Sls) | Anticipated operational occurrence Fuel cladding |
ML21194A268 | 22 June 2021 | Technical Specification Bases, Chapter B 3.8, Electrical Power Systems | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Surveillance Frequency Control Program Open Phase Condition Battery sizing Offsite Circuit |
ML21194A270 | 22 June 2021 | Technical Specification Bases, Chapter B 3.4, Reactor Coolant System | Unanalyzed Condition Boric Acid Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Hydrostatic Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage Power change Unidentified leakage |
ML21194A271 | 22 June 2021 | Technical Specification Bases, Chapter B 3.9, Refueling Operations | Boric Acid Shutdown Margin Surveillance Frequency Control Program Fuel cladding |