Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)20 November 2023Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)
ML23310A0516 November 2023EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases DocumentSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Grace period
Power change
Unidentified leakage
ML23227A12715 August 2023Corrected Proposed Technical Specification 55.16 Changes (Markup)
ML23227A12815 August 2023Corrected Proposed Technical Specification 5.5.16 Changes (Clean Pages)
ML23088A12329 March 2023Attachment 3: Marked-Up Technical Specification, Bases PagesSafe Shutdown
Surveillance Frequency Control Program
ML23088A25423 March 2023EIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases DocumentSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Emergency Lighting
FLEX
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Grace period
Power change
ML23052A04721 February 2023Enclosure 5 - Revised Technical Specification Bases (for Information Only)
ML23067A17529 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.3, InstrumentationSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Surveillance Frequency Control Program
ML23067A17829 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.6, Containment SystemsHigh Radiation Area
Stroke time
Surveillance Frequency Control Program
Power Operated Valves
ML23067A17629 December 2022Rev. 18 to Technical Specification Bases, Chapter 3.5, Emergency Core Cooling System S(Eccs)Boric Acid
Stroke time
Probabilistic Risk Assessment
Surveillance Frequency Control Program
ML23067A17429 December 2022Rev. 18 to Technical Specifications, Bases Change, Chapter 3.7, Plant SystemsSafe Shutdown
Boric Acid
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Tornado Missile
Tornado Missile Protection
Surveillance Frequency Control Program
Earthquake
Power change
ML23067A17729 December 2022Rev. 18 to Technical Specification Bases Change, Chapter B3, Safety Limits (Sls)Incorporated by reference
Missed surveillance
ML23067A17929 December 2022Rev. 18 to Technical Specification Bases, Implemented Change Notice Log
ML23067A18129 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter B2, Safety Limits (Sls)Anticipated operational occurrence
Fuel cladding
ML23067A18029 December 2022Rev. 18 to Technical Specification Bases, Chapter 3.1, Reactivity Control SystemsBoric Acid
Shutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
ML23067A18229 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.8, Electrical Power SystemsSafe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Surveillance Frequency Control Program
Open Phase Condition
Battery sizing
Offsite Circuit
ML23067A18329 December 2022Rev. 18 to Technical Specification, Bases Change, Table of ContentsShutdown Margin
Ultimate heat sink
Post Accident Monitoring
ML23067A18529 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter B 3.9, Refueling OperationsBoric Acid
Shutdown Margin
Surveillance Frequency Control Program
Fuel cladding
ML23067A18629 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.2, Power Distribution LimitsSurveillance Frequency Control Program
Fuel cladding
Power change
ULNRC-06782, Rev. 18 to Technical Specification Bases, List of Effective Sections29 December 2022Rev. 18 to Technical Specification Bases, List of Effective Sections
ML23067A18429 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.4, Reactor Coolant SystemUnanalyzed Condition
Boric Acid
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Hydrostatic
Surveillance Frequency Control Program
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
ML22335A5091 December 2022Description and Assessment of the Proposed ChangeSafe Shutdown
Boric Acid
Ultimate heat sink
Earthquake
Fuel cladding
ML22335A5111 December 2022Attachment 2 - Proposed TS Bases Changes (Markups)Boric Acid
Surveillance Frequency Control Program
Fuel cladding
ML22307A3143 November 2022Attachment 2: Proposed Technical Specification 5.5.16 Changes (Markup)
ML22307A3153 November 2022Attachment 3: Proposed Technical Specification 5.5.16 Changes (Clean Pages)
ML22285A12012 October 2022Attachment 3 to Enclosure 1: Marked-Up Technical Specifications Bases (for Information Only)Anticipated operational occurrence
Fuel cladding
ML22242A12729 August 2022Attachment 3 to Enclosure 1 - Marked-Up Technical Specification BasesSurveillance Frequency Control Program
ML22216A2424 August 2022Proposed Technical Specification Changes (Mark-Up)Nondestructive Examination
ML22181B13430 June 2022Attachment 4 - Replacement for Attachment 4, Proposed Changes to Technical Specification Bases Changes (Mark-Up) Pages (for Information), of ULNRC-06688Safe Shutdown
Shutdown Margin
High Radiation Area
Surveillance Frequency Control Program
Power Operated Valves
Offsite Circuit
ML22153A1792 June 2022Attachment 3 - Marked-Up Technical Specifications BasesAnticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
Power change
ULNRC-06686, Attachment 4: Proposed Technical Specifications Bases Changes (Mark-Up)9 December 2021Attachment 4: Proposed Technical Specifications Bases Changes (Mark-Up)Stroke time
Incorporated by reference
Missed surveillance
ML21335A4571 December 2021Enclosure 5: Proposed Technical Specification Bases Changes (Mark-up - for Info Only)Safe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
Pressure Boundary Leakage
ML21294A39821 October 2021Attachment 4 - Proposed Changes to Technical Specification Bases Changes (Mark-Up) Pages (for Information)Safe Shutdown
Shutdown Margin
High Radiation Area
Surveillance Frequency Control Program
Power Operated Valves
Offsite Circuit
ML21272A17328 September 2021Enclosure 5 - Proposed TS Bases Changes (for Information Only)Safe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
Pressure Boundary Leakage
ML21272A17228 September 2021Enclosure 4 - Revised Technical Specification PagesSurveillance Frequency Control Program
ML21272A17128 September 2021Enclosure 3 - Proposed Technical Specification Changes (Mark-up)Surveillance Frequency Control Program
ML21194A26922 June 2021Technical Specification Bases, Table of ContentsShutdown Margin
Ultimate heat sink
Post Accident Monitoring
ML21195A32122 June 2021Technical Specification Bases Implemented Change Notice Log
ML21194A27322 June 2021Technical Specification Bases, List of Effective Sections
ML21194A27222 June 2021Technical Specification Bases, Chapter B 3.2, Power Distribution LimitsSurveillance Frequency Control Program
Fuel cladding
Power change
ML21194A26122 June 2021Technical Specification Bases, Chapter B 3.7, Plant SystemsSafe Shutdown
Boric Acid
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Tornado Missile
Surveillance Frequency Control Program
Earthquake
Power change
ML21194A26222 June 2021Technical Specification Bases, Chapter 3.3, InstrumentationSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Surveillance Frequency Control Program
ML21194A26322 June 2021Technical Specification Bases, Chapter B 3.5, Emergency Core Cooling Systems (ECCS)Boric Acid
Stroke time
Probabilistic Risk Assessment
Surveillance Frequency Control Program
ML21194A26422 June 2021Technical Specification Bases, Chapter B 3.0, Safety Limits (Sls)Stroke time
Incorporated by reference
Missed surveillance
ML21194A26522 June 2021Technical Specification Bases, Chapter B 3.6, Containment SystemsHigh Radiation Area
Stroke time
Surveillance Frequency Control Program
Power Operated Valves
ML21194A26622 June 2021Technical Specification Bases, Chapter B 3.1, Reactivity Control SystemsBoric Acid
Shutdown Margin
Anticipated operational occurrence
Surveillance Frequency Control Program
Fuel cladding
ML21194A26722 June 2021Technical Specification Bases, Chapter 2.0, Safety Limits (Sls)Anticipated operational occurrence
Fuel cladding
ML21194A26822 June 2021Technical Specification Bases, Chapter B 3.8, Electrical Power SystemsSafe Shutdown
Anticipated operational occurrence
Qualified Offsite Circuit
Surveillance Frequency Control Program
Open Phase Condition
Battery sizing
Offsite Circuit
ML21194A27022 June 2021Technical Specification Bases, Chapter B 3.4, Reactor Coolant SystemUnanalyzed Condition
Boric Acid
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Hydrostatic
Surveillance Frequency Control Program
Fuel cladding
Pressure Boundary Leakage
Power change
Unidentified leakage
ML21194A27122 June 2021Technical Specification Bases, Chapter B 3.9, Refueling OperationsBoric Acid
Shutdown Margin
Surveillance Frequency Control Program
Fuel cladding