Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22244A2321 September 2022Supplement to Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage RequirementsPacking leak
Pressure Boundary Leakage
ML22221A2129 August 2022Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage RequirementsPacking leak
Surveillance Frequency Control Program
Pressure Boundary Leakage
ML20212L52130 July 2020License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvement ProcessIncorporated by reference
Surveillance Frequency Control Program
NOC-AE-20003734, License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator Pressures13 May 2020License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator PressuresBoric Acid
Surveillance Frequency Control Program
Fuel cladding
ML20134K75813 May 2020License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator PressuresBoric Acid
Surveillance Frequency Control Program
Fuel cladding
NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.26 September 2019License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.Packing leak
Offsite Dose Calculation Manual
Surveillance Frequency Control Program
Process Control Program
Pressure Boundary Leakage
Power change
NOC-AE-19003617, License Amendment Request to Revise Technical Specifications Tables for a Terminology Change to the P-13 Permissive Interlock Description24 April 2019License Amendment Request to Revise Technical Specifications Tables for a Terminology Change to the P-13 Permissive Interlock DescriptionAnticipated operational occurrence
ML08364008030 January 2009Issuance of Amendment Nos. 190 and 178, Revision to Technical Specification 3.6.1.3, Containment Air Locks
NOC-AE-08002255, Transmittal of Proposed Amendment to Technical Specification 3.8.3.16 March 2008Transmittal of Proposed Amendment to Technical Specification 3.8.3.1Probabilistic Risk Assessment
Large early release frequency
NOC-AE-07002234, Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C28 January 2008Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action CShutdown Margin
Anticipated operational occurrence
NOC-AE-07002228, License Amendment Request Proposed Revision to Technical Specification 3.6.1.3, Containment Air Locks23 January 2008License Amendment Request Proposed Revision to Technical Specification 3.6.1.3, Containment Air Locks
ML07305034823 October 2007License Amendment Request, Proposed Revision to Technical Specifications to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk-Informed Initiative 5b)Safe Shutdown
Shutdown Margin
Ultimate heat sink
Grab sample
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Battery sizing
Exemption Request
Pressure Boundary Leakage
Offsite Circuit
Power change
NOC-AE-07002167, Amended Changes to Technical Specification 3/4.8.2 for Batteries and DC Systems31 May 2007Amended Changes to Technical Specification 3/4.8.2 for Batteries and DC SystemsShutdown Margin
Battery sizing
NOC-AE-07002156, Proposed Change to Surveillance Requirement 4.5.2.d21 May 2007Proposed Change to Surveillance Requirement 4.5.2.d
ML07012015511 January 2007License Pages 4 & TS 3/4 3-27 - Issuance of Amendment 176 One-Time Change to Loss of Power Instrumentation Technical Specifications
NOC-AE-06002101, Proposed One-Time Exigent Change to Loss of Power Instrumentation Technical Specifications28 December 2006Proposed One-Time Exigent Change to Loss of Power Instrumentation Technical SpecificationsSafe Shutdown
Earthquake
Grace period
NOC-AE-06002096, Proposed One-Time Exigent Change to Loss of Power Instrumentation Technical Specifications20 December 2006Proposed One-Time Exigent Change to Loss of Power Instrumentation Technical SpecificationsSafe Shutdown
Earthquake
Grace period
NOC-AE-06002013, License Amendment Request - Proposed Amendment to Technical Specifications: Revision of the Spent Fuel Pool and In-Containment Storage Area Criticality Analysis7 June 2006License Amendment Request - Proposed Amendment to Technical Specifications: Revision of the Spent Fuel Pool and In-Containment Storage Area Criticality Analysis
NOC-AE-05001914, Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.30 March 2006Proposed Change to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.Reactor Vessel Water Level
Post Accident Monitoring
ML05144079619 May 2005Tech.Spec.Pages to S.Texas Amendment Nos. 172/160
NOC-AE-05001834, License Amendment Request Proposed One-Time Change to Technical Specification 3.7.4, Essential Cooling Water System, and Associated Supported Systems Limiting Condition for Operation Action Statement6 January 2005License Amendment Request Proposed One-Time Change to Technical Specification 3.7.4, Essential Cooling Water System, and Associated Supported Systems Limiting Condition for Operation Action StatementSafe Shutdown Earthquake
Probabilistic Risk Assessment
Large early release frequency
NOC-AE-04001794, License Amendment Request Revision to Proposed Amendment to Technical Specifications for Steam Generators5 October 2004License Amendment Request Revision to Proposed Amendment to Technical Specifications for Steam GeneratorsShutdown Margin
Nondestructive Examination
Annual Radiological Environmental Operating Report
Earthquake
Pressure Boundary Leakage
NOC-AE-04001795, Units I and 2 - Proposed Change to Technical Specification Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves.30 September 2004Units I and 2 - Proposed Change to Technical Specification Surveillance Requirement 4.4.4.2, Reactor Coolant System Relief Valves.Pressure Boundary Leakage
Grace period
NOC-AE-04001786, License Amendment Request to Eliminate the Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports30 September 2004License Amendment Request to Eliminate the Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure ReportsShutdown Margin
Offsite Dose Calculation Manual
Incorporated by reference
Annual Radiological Environmental Operating Report
Process Control Program
Deep Dose Equivalent
NOC-AE-04001780, License Amendment Request Proposed Revision to the Technical Specifications Regarding Deletion of Requirements Related to Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement Process26 August 2004License Amendment Request Proposed Revision to the Technical Specifications Regarding Deletion of Requirements Related to Hydrogen Recombiners and Hydrogen Analyzers Using the Consolidated Line Item Improvement ProcessReactor Vessel Water Level
Incorporated by reference
NOC-AE-04001697, Proposed Exigent Change to Technical Specification 3/4.7.718 March 2004Proposed Exigent Change to Technical Specification 3/4.7.7Safe Shutdown
Shutdown Margin
Enforcement Discretion
NOC-AE-04001668, License Amendment Request, Proposed Revision to Technical Specifications Regarding Mode Change Using the Consolidated Line Item Improvement Process3 February 2004License Amendment Request, Proposed Revision to Technical Specifications Regarding Mode Change Using the Consolidated Line Item Improvement ProcessTime of Discovery
Incorporated by reference
NOC-AE-03001647, Proposed Emergency Change to Technical Specification 3.8.1.1 Re Allowed Outage Time for Unit 2 Standby Diesel Generator 22 from 14 Days to 61 Days15 December 2003Proposed Emergency Change to Technical Specification 3.8.1.1 Re Allowed Outage Time for Unit 2 Standby Diesel Generator 22 from 14 Days to 61 DaysHigh winds
Time to boil
Probabilistic Risk Assessment
Large early release frequency
Turbine Missile
Offsite Circuit
Grace period
ML03309048331 October 2003Technical Specification for Amendment 157
NOC-AE-03001580, License Amendment Request - Proposed Amendment to Technical Specification 4.4.5.3a16 October 2003License Amendment Request - Proposed Amendment to Technical Specification 4.4.5.3aOperating Basis Earthquake
ML02340052426 November 2002Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance Requirements
ML02339007826 November 2002Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance RequirementsShutdown Margin
NOC-AE-02001402, Response to NRC Questions on Proposed Change to Loss of Power & AC Sources TS24 October 2002Response to NRC Questions on Proposed Change to Loss of Power & AC Sources TSOffsite Circuit
NOC-AE-02001272, Application for Amendment to Several Sections of TS & Unit 2 Operating License to Delete Information Specific to Model E Steam Generators23 May 2002Application for Amendment to Several Sections of TS & Unit 2 Operating License to Delete Information Specific to Model E Steam GeneratorsShutdown Margin
Operating Basis Earthquake
Process Control Program
Pressure Boundary Leakage
NOC-AE-02001237, Proposed Amendment to Technical Specification 3/4.6.1.7, Containment Ventilation System18 February 2002Proposed Amendment to Technical Specification 3/4.6.1.7, Containment Ventilation SystemProbabilistic Risk Assessment
Large early release frequency
ML02016052010 January 2002STP, Units 1 and 2 - TS for Amendments No. 135 and 124