STP, Units 1 and 2 - TS for Amendments No. 135 and 124
ML020160520
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/10/2002
From:
NRC/NRR/DLPM
To:
References
TAC MB2001, TAC MB2002
Download: ML020160520 (6)


Text

TABLE 3.3-4 (Continued)

TABLE NOTATIONS Time constants utilized in the lead-lag controller for Steam Line Pressure-Low are Ti ? 50 seconds and t 2 <5 seconds. CHANNEL CALIBRATION shall ensure that these time constants are adjusted to these values. I

    • The time constant utilized in the rate-lag controller for Steam Line Pressure-Negative Rate-High is greater than or equal to 50 seconds. CHANNEL CALIBRATION shall ensure that this time constant is adjusted to this value.

Deleted

    1. Deleted
      1. This setpoint value may be increased up to the equivalent limits of ODCM Control 3.11.2.1 in accordance with the methodology and parameters of the ODCM during containment purge or vent for pressure control, ALARA and respirable air quality considerations for personnel entry.

SOUTH TEXAS - UNITS I & 2 3/4 3-36 Unit I - Amendment No. 64, 446, 135 Unit 2 - Amendment No. -0, 404, 124

3/4.5 EMERGENCY CORE COOLING SYSTEMS 314.5.1 ACCUMULATORS LIMITING CONDITION FOR OPERAT1ON 3.5.1 Each Safety Injection System accumulator shall be OPERABLE I

APPLICABILITY: MODES 1 and 2 MODE 3 with pressurizer pressure > 1000 psig ACTION:

a. With one accumulator inoperable, except as a result of boron concentration outside the required limits, restore the inoperable accumulator to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in-at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than I

1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b. With the boron concentration of one accumulator outside the required limit, restore the boron concentration to within the required limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and reduce pressurizer pressure to less than 1000 psig within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.5.1.1 Each accumulator shall be demonstrated OPERABLE: I

a. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by:
1) Verifying the contained borated water volume is >_8800 gallons and _ 9100 gallons and nitrogen cover-pressure is 2t 590 psig and < 670 psig, and I
2) Verifying that each accumulator isolation valve is open.
b. At least once per 31 days and within 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />s* after each solution volume increase of greater than or equal to 1% of tank volume that is not the result of addition from the RWST by verifying the boron concentration of the accumulator solution is _>2700 ppm and < 3000 ppm and
c. At least once per 31 days when the RCS pressure is above 1000 psig by verifying that power to the isolation valve operator is removed.
  • The 6 hr. SR is only required to be performed for affected accumulators SOUTH TEXAS - UNITS I & 2 3/4 5-1 Units 1 - Amendment No-54-,, 49, 135 Units 2 - Amendment No. 40;4-3, 4-7, 124

NOT USED SOUTH TEXAS - UNITS 1 & 2 3/45-2 Unit 1 - Amendment No. 135 Unit 2 - Amendment No. 124

3/4.5 EMERGENCY CORE COOLING SYSTEMS BASES 3/4.5.1 ACCUMULATORS The OPERABILITY of each Reactor Coolant System (RCS) accumulator ensures that a sufficient volume of borated water will be immediately forced into the reactor core through three cold legs in the event the RCS pressure falls below the pressure of the accumulators. This initial surge of water into the core provides the initial cooling mechanism during large RCS pipe ruptures.

If one accumulator is inoperable for a reason other than boron concentration, the accumulator must be

.turned to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. In this Condition, the required contents of two accumulators cannot be assumed to reach the core during a LOCA. The 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is a risk-informed Completion Time that minimizes the potential for exposure of the plant to a LOCA under these conditions.

If the boron concentration of one accumulator is not within limits, it must be returned to within the limits within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. In this Condition, ability to maintain subcriticality or minimum boron precipitation time may be reduced. The boron in the accumulators contributes to the assumption that the combined ECCS water in the partially recovered core during the early reflooding phase of a large break LOCA is sufficient to keep that portion of the core subcritical. One accumulator below the minimum boron concentration limit, however, will have no effect on available ECCS water and an insignificant effect on core subcriticality during reflood. Boiling of ECCS water in the core during reflood concentrates boron in the saturated liquid that remains in the core. In addition, current analysis techniques demonstrate that the accumulators do not discharge following a large main steam line break for the majority of plants. Even if they do discharge, their impact is minor and not a design limiting event. Thus, 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to return the boron concentration to within limits.

The surveillance limits on accumulator volume represent a spread about an average value used in the safety analysis and have been demonstrated by sensitivity studies to vary the peak clad temperature by less than 20'F. The surveillance limit on accumulator pressure ensures that the assumptions used for accumulator injection in the safety analysis are met.

The boron concentration should be verified to be within required limits for each accumulator every 31 days since the static design of the accumulators limits the ways in which the concentration can be changed. The 31 day Frequency is adequate to identify changes that could occur from mechanisms such as stratification or inleakage. Sampling the affected accumulator within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after a 1% volume increase will identify whether inleakage has caused a reduction in boron concentration to below the required limit. It is not necessary to verify boron concentration if the added water inventory is from the refueling water storage tank (RWST), because the water contained in the RWST is within the accumulator boron concentration requirements SOUTH TEXAS - UNITS 1 & 2 B 3/4 5-1 Unit I - Amendment No. 13 5 Unit 2 - Amendment No. 124

EMERGENCY CORE COOLING SYSTEMS BASES 3/4.5.1 ACCUMULATORS (Continued)

Verification every 31 days that power is removed from each accumulator isolation valve operator when the pressurizer pressure is >1000 psig ensures that an active failure could not result in the undetected closure of an accumulator motor operated isolation valve. If this were to occur, only one accumulator would be available for injection given a single failure coincident with a LOCA. Since power is removerl under administrative control, the 31 day Frequency will provide adequate assurance that power is re.noved.

This SQ. allows power to be supplied lo the motor operated isolation valves when pressurizer pressure is < .000 psig, rlhus allowing operational flexibility by avoiding unnecessary delays to manipulate t'.e breakers during plant startup. or shutdowns. Even with power supplied to the valves, inadvertent closure is prevented by the RCS pressure interlock associated with the valves.

Should closure of a valve occur in spite of the interlock, the SI signal provided to the valves would open a closed valve in the event of a LOCA.

3/4.5.2 and 3/4.5.3 ECCS SUBSYST8MS The OPERABILITY of three independent ECCS subsystems ensures that sufficient emergency core cooling capability will be available in the event of a LOCA assuming the loss of one subsystem through any single failure consideration. Each subsystem operating in conjunction with the accumulators is capable of supplying sufficient core cooling to limit the peak cladding temperatures within acceptable limits for all postulated break sizes ranging from the double ended break of the largest RCS cold leg pipe downward. One ECCS is assumed to discharge completely through the postulated break in the RCS loop. Thus, three trains are required to satisfy the single failure criterion. Note that the centrifugal charging pumps are not part of ECCS and that the RHIR pumps are not used in the injection phase of the ECCS. Each ECCS subsystem and the RHR pumps and heat exchanges provide long-term core cooling capability in the recirculation mode during the accident recovery period.

When the RCS temperature is below 350°F, the ECCS requirements are balanced between the limitations imposed by the low temperature overpressure protection and the requirements necessary to mitigate the consequences of a LOCA below 350 0F. At these temperatures, single failure considerations are not required because of the stable reactivity condition of the reactor and the limited core cooling requirements. Only a single Low Head Safety Injection pump is required to mitigate the effects of a large-break LOCA in this mode. However, two are provided to accommodate the possibility that the break occurs in a loop containing one of the Low Head pumps. Low Head Safety Injection pumps are not required inoperable below 350'F because their shutoff head is too low to impact the low temperature overpressure protection limits.

Below 2000 F (MODE 5) no ECCS pumps are required, so the High Head Safety Injection pumps are locked out to prevent cold overpressure.

SOUTH TEXAS - UNITS 1 & 2 B 3/4 5-2 Unit 1 - Amendment No. 135 Unit 2 - Amendment No. 124

EMERGENCY CORE COOLING SYSTEMS BASES 3/4.5.2 and 3/4.5.3 ECCS SUBSYSTEMS (Continued)

The Surveillance Requirements provided to ensure OPERABILITY of each component ensure that, at a minimum, the assumptions used in the safety analyses are met and that subsystem OPERABILITY is maintained. Surveillance Requirements for flow testing provide assurance that proper ECCS flows will be maintained in the event of a LOCA.

3/4.5.4 (This specification numrnoer is not used) 3/4.5.5 REFUELING WATE'_-, STORAGE TANK The OPERABILITY )f the refueling water storage tank (RWST) as part of the ECCS ensures that a sufficient supply of borat ,d water is available for injection by the ECCS in the event of a LOCA or a steamline break. The limits on RWST minimum volume aid boron concentration ensure that: (1) sufficient water is available within containment to permit recirculation cooling flow to the core, (2) the reactor will remain subcritical in the cold condition (687F to 212'F) following a small break LOCA assuming complete mixing of the RWST, RCS, Spray Additive Tank, Containment Spray System and ECCS water volumes with all control rods inserted except the most reactive control rod assembly (ARI 1), (3) the reactor will remain subcritical in cold condition following a large break LOCA (break flow area > 3.0 ft2) assuming complete mixing of the RWST, RCS, Spray Additive Tank, Containment Spray System and ECCS water volumes and other sources of water that may eventually reside in the sump post LOCA with all control rods assumed to be out (ARO), and (4) long term subcriticality following a steamline break assuming ARI-I and preclude fuel failure.

The maximum allowable value for the RWST boron concentration forms the basis for determining the time (post-LOCA) at which operator action is required to switch over the ECCS to hot leg recirculation in order to avoid precipitation of the soluble boron.

The contained water volume limit includes an allowance for water not usable because of tank discharge line location or other physical characteristics.

The limits on contained water volume and boron concentration of the RWST also ensure a pH value of between 7.5 and 10.0 for the solution recirculated within containment after a LOCA. This pH band minimizes the evolution of iodine and minimizes the effect of chloride and caustic stress corrosion on mechanical systems and components.

3/4.5.6 RESIDUAL HEAT REMOVAL (RHR) SYSTEM The OPERABILITY of the RHR system ensures adequate heat removal capabilities for Long-Term Core Cooling in the event of a small-break loss-of -coolant accident (LOCA), an isolatable LOCA, or a secondary break in MODES 1, 2, and 3. The limits on the OPERABILITY of the RHR system ensure that at least one RHR loop is available for cooling including single active failure criteria.

SOUTH TEXAS - UNITS I & 2 B 3/4 5-3 Unit 1 - Amendment No. 135 Unit 2 - Amendment No. 124