Technical Specification for Amendment 157
ML033090483
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/31/2003
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML033090483 (4)


Text

SOUTH TEXAS LICENSE (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. , and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. STPNOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Not Used (4) Initial Startup Test Program (Section 14. SER)*

Any changes to the Initial Test Program described in Section 14 of the Final Safety Analysis Report made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

(5) Safety Parameter Display System (Section 18, SSER No. 4)*

Before startup after the first refueling outage, HL&P[**] shall perform the necessary activities, provide acceptable responses, and implement all proposed corrective actions related to issues as described in Section 18.2 of SER Supplement 4.

(6) Supplementary Containment Purge Isolation (Section 11.5. SSER No. 4)

HL&P shall provide, prior to startup from the first refueling outage, control room indication of the normal and supplemental containment purge sample line isolation valve position.

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
    • The original licensee authorized to possess, use and operate the facility was HL&P.

Consequently, historical references to certain obligations of HL&P remain in the license conditions Amendment No. 9342,455, 157

SOUTH TEXAS LICENSE g9 I. Effective Date and Expiration This license is effective as of the date of issuance and shall expire at midnight on August 20, 2027.

FOR THE NUCLEAR REGULATORY COMMISSION original signed by Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A, Technical Specifications (NUREG-1 305)
2. Appendix B, Environmental Protection Plan Date of Issuance: March 22, 1988 Amendment No. 44,157

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. , and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. STPNOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

(3) Not Used (4) Initial Startup Test Program (Section 14, SR)*

Any changes to the Initial Test Program described in Section 14 of the Final Safety Analysis Report made in accordance with the provisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) within one month of such change.

(5) License Transfer Texas Genco, LP shall provide decommissioning funding assurance, to be held in decommissioning trusts for the South Texas Project, Unit 2 (Unit 2) upon the direct transfer of the Unit 2 license to Texas Genco, LP, in an amount equal to or greater than the balance in the Unit 2 decommissioning trust immediately prior to the transfer. In addition, Texas Genco, LP shall ensure that all contractual arrangements referred to in the application for approval of the transfer of the Unit 2 license to Texas Genco, LP to obtain necessary decommissioning funds for Unit 2 through a non-bypassable charge are executed and will be maintained until the decommissioning trusts are fully funded, or shall ensure that other mechanisms that provide equivalent assurance of decommissioning funding in accordance with the Commission's regulations are maintained.

(6) License Transfer The master decommissioning trust agreement for Unit 2, at the time the direct transfer of Unit 2 to Texas Genco, LP is effected and thereafter, is subject to the following:

  • The parenthetical notation following the title of many license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.

Amendment No. 8013014413,145

F. Physical Securitv STPNOC shall fully implement and maintain in effect all provisions of the physical security, training and qualification, and safeguards contingency plans previously approved by the Commission and all amendments and revisions to such plans made pursuant to the authority under 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "South Texas Project Electric Generating Station Physical Security Plan," with revisions/amendments submitted through September 30, 1988; "South Texas Project Electric Generating Station Security Personnel Qualification and Training Plan" with revisions submitted through March 4,1988, and "South Texas Project Electric Generating Station Safeguards Contingency Plan,' with revisions/amendments submitted through July 18,1988.

G. Not Used H. Financial Protection The Owners shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

I. Effective date and Expiration This license is effective as of the date of issuance and shall expire at midnight on December 15, 2028.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed By: James H. Sniezek/for Thomas E. Murley, Director Office of Nuclear Reactor Regulation

Enclosures:

1. Appendix A, Technical Specifications (NUREG-1 346)
2. Appendix B, Environmental Protection Plan Date of Issuance: March 28,1989 Amendment No. 430, 145 l