Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML09008072916 December 2008License Renewal Application. Section 3.5 to EndSafe Shutdown
Boric Acid
Non-Destructive Examination
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Condition Adverse to Quality
High Energy Line Break
Aging Management
Foreign Material Exclusion
Feedwater Heater
Stress corrosion cracking
Integrated leak rate test
Eddy Current Testing
Moisture barrier
License Renewal
Earthquake
Maintenance Rule Program
Control of Heavy Loads
Biofouling
Through-Wall Leak
Fire Protection Program
Dissimilar Metal Weld
Flow Induced Vibration
Power Uprate
Measurement Uncertainty Recapture
Thermography
Thermal fatigue
3F1008-03, Relief Request 08-002-RR, Revision 029 October 2008Relief Request #08-002-RR, Revision 0Weld Overlay
Nondestructive Examination
Stress corrosion cracking
Liquid penetrant
Dissimilar Metal Weld
ML07310099115 November 2007Relief Requests #07-001-RR and #07-002-RR Regarding Weld RepairsHydrostatic
Nondestructive Examination
VT-2
Incorporated by reference
Stress corrosion cracking
3F0407-15, Resubmittal of Relief Requests 07-001-RR, Revision 0, and 07-002-RR, Revision 012 April 2007Resubmittal of Relief Requests #07-001-RR, Revision 0, and #07-002-RR, Revision 0Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Stress corrosion cracking
Dissimilar Metal Weld
3F0307-10, Relief Requests 07-001-RR, Revision 0, and 07-002-RR, Revision 030 March 2007Relief Requests #07-001-RR, Revision 0, and #07-002-RR, Revision 0Non-Destructive Examination
Hydrostatic
Nondestructive Examination
VT-2
Stress corrosion cracking
Dissimilar Metal Weld
ML0400604756 January 2004Ltr Safety Evaluation of Relief Request 03-001-RR and 03-0002-RR Concerning Alternative Repair Method and Flaw Characterization for Pressurizer Instrument Nozzle PenetrationsNon-Destructive Examination
Hydrostatic
Incorporated by reference
Stress corrosion cracking
Through-Wall Leakage
ML20212J8631 October 1999Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i)Incorporated by reference
ML20149J21424 July 1997Discusses Crystal River Nuclear Generating Plant Unit 3,1994 Inservice Inspection Rept Which Identified Subsurface Flaw in Pressurizer Surge Line Nozzle Weld That Exceeded ASME Code Section Xi,Paragraph IWB-3500 Acceptance Limit
ML20141D94016 April 1997Summary Document for Pressurizer NDE Development for FPC Crystal River Unit 3Liquid penetrant
ML20078M21825 January 1995Nonproprietary Fm Assessment of CR-3 Prz WP-15 Weld Flaw Until End-of-Life
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on OperabilitySafe Shutdown
Unanalyzed Condition
Fitness for Duty
Probabilistic Risk Assessment
Condition Adverse to Quality
Missed surveillance
Operability Determination
Exemption Request
Pressure Boundary Leakage
Backfit
Operational leakage