L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications27 March 2023and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or ApplicationsFuel cladding
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report26 October 2022and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program30 September 2021Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program
ML21062A14621 April 2021Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015)Decommissioning Funding Plan
L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report6 August 201910 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds19 March 2019Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic WeldsNondestructive Examination
Dissimilar Metal Weld
ML19002A16012 March 2019Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19Incorporated by reference
License Renewal
Environmental Justice
ML19101A45514 November 2018Samuel Miranda Public Comments for November 15, 2018 Seabrook LRA MeetingProbabilistic Risk Assessment
Aging Management
ML18012A56812 January 2018Technical Evaluation Report: Storm Surge_Seabrook_January2018High winds
Hydrostatic
SBK-L-17172, Seventh Annual Update to the License Renewal Application18 October 2017Seventh Annual Update to the License Renewal ApplicationNon-Destructive Examination
Aging Management
Moisture barrier
SBK-L-17136, Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information28 August 2017Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard InformationProbabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
ML17191A41210 July 2017NextEra Service Position Paper: Seabrook Service Water TS 3.7.4
SBK-L-17099, Flooding Focused Evaluation for Impact of New Flooding Hazard Information28 June 2017Flooding Focused Evaluation for Impact of New Flooding Hazard InformationInternal Flooding
Hydrostatic
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 201617 April 2017Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016Fuel cladding
ML16279A05031 July 2016Enclosure 3: MPR-4153, Revision 2, Seabrook Station-Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction, July 2016 (Seabrook Fp# 100918) (Non-proprietary)Commercial Grade Dedication
ML16279A04931 July 2016Enclosure 2: Simpson Gumpertz & Heger, Inc., Evaluation and Design Confirmation of As-Deformed Ceb, 150252-CA-02, Revision 0, July 2016 (Seabrook FP#100985)Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Tornado Generated Missile
Earthquake
ML16216A24231 July 2016MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016Commercial Grade Dedication
Hydrostatic
Aging Management
ML16216A24131 July 2016MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016
SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 027 July 2016Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0Safe Shutdown Earthquake
Operating Basis Earthquake
Incorporated by reference
Earthquake
SBK-L-16108, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events26 July 2016Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External EventsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Safe Shutdown Earthquake
Internal Flooding
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Seismically rugged
Spent Fuel Pool Instrumentation
Earthquake
ML16147A19629 April 201610 CFR 50.59 Report, Revision 17 to Updated Final Safety Analysis Report, Revision 14 to Appendix R, Revision 15 to Appendix a, and Revision 146 to the Technical Requirements ManualSafe Shutdown
Spent Fuel Pool Instrumentation
ML16117A31226 April 2016SBK-L-16056 - NextEra Energy Seabrook, LLC - Revised Response to NRC 12/23/2015 Questions on Ceb Root CauseHydrostatic
Finite Element Analysis
ML16068A13527 February 2016Attachment 3 - Clean Copy of Seabrook Emergency Action Levels - Initiating Conditions, Threshold Values and BasisSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Packing leak
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Backfit
ML16068A13927 February 2016Attachment 5 - Technical Information for Proposed Initiating Conditions and Emergency Action LevelsSafe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
FLEX
Surveillance Frequency Control Program
Spent Fuel Pool Instrumentation
Battery sizing
Earthquake
ML16068A13127 February 2016Attachment 2 - Markup of Seabrook Station Emergency Action Levels -Initiating Conditions, Threshold Values and Basis
ML16068A13727 February 2016Attachment 4 - NEI 99-01, Rev. 6, Deviations and Differences, Seabrook Station Nuclear Power Plant - Unit 1Safe Shutdown
High winds
Operating Basis Earthquake
Earthquake
Pressure Boundary Leakage
SBK-L-15195, Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report7 November 2015Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report
ML15274A21425 September 2015FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-1 Through Figure 4-33
ML15274A21225 September 2015FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Pp. 1 Through Figure 2-1High winds
Ultimate heat sink
Tornado Missile
Hydrostatic
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Earthquake
SBK-L-15181, FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End25 September 2015FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the EndHydrostatic
Earthquake
ML15208A04912 August 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightsSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
SBK-L-14229, Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The...19 December 2014Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The...Safe Shutdown
Boric Acid
Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Power-Operated Valves
ML14216A40624 July 2014Attachment 5, WCAP-17444-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Seabrook Unit 1, (Non-proprietary)Hydrostatic
Finite Element Analysis
Aging Management
ML14216A40524 July 2014Attachment 3, WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal OperationHydrostatic
Aging Management
Exemption Request
SBK-L-14090, ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report.31 May 2014ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report.
ML14030A55225 February 2014Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Tornado Missile
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Fukushima Dai-Ichi
Severe Accident Management Guideline
Frazil ice
B.5.b Mitigating Strategies
Earthquake
ML14049A19714 February 2014Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Seabrook Station, TAC No.: MF0836Safe Shutdown
Boric Acid
High winds
Ultimate heat sink
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Emergency Lighting
FLEX
Tornado Generated Missile
Fukushima Dai-Ichi
Severe Accident Management Guideline
Frazil ice
B.5.b Mitigating Strategies
Earthquake
ML13295A25217 December 2013Review of the 2012 Steam Generator Tube Inspections
ML13267A3884 December 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Mission time
FLEX
Spent Fuel Pool Instrumentation
Battery sizing
Fire Protection Program
ML13260A16131 July 2013ANP-3243NP, Rev. 0, Seabrook Station Unit I Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report
ML13189A1972 July 2013Third Annual Update to License Renewal ApplicationNon-Destructive Examination
Hydrostatic
Coatings
Aging Management
Moisture barrier
License Renewal
ML13099A01919 March 2013Attachment 5 to SBK-L-13061, Holtec Non-Proprietary Licensing Report HI-2114996, Rev. 3, Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses.Fuel cladding
ML12340A48721 November 2012Enclosure to SBK-L-12242, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: SeismicUnanalyzed Condition
Boric Acid
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
Scaffolding
ML12339A27413 September 2012Concrete Summary 4-12
SBK-L-12101, NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring16 May 2012NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) MonitoringNon-Destructive Examination
Fire Barrier
Aging Management
Moisture barrier
Maintenance Rule Program
Fire Protection Program
ML12179A28215 March 2012ASR at Seabrook Station, Shear and Lap Splice Testing
ML12038A03830 January 2012Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses (Holtec International Document HI-2114996, Revision 2Shutdown Margin
FLEX
Fuel cladding
SBK-L-12256, WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation31 October 2011WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal OperationHydrostatic
Aging Management
SBK-L-11173, First Annual Update to License Renewal Application and Changes to LRA Appendix a25 August 2011First Annual Update to License Renewal Application and Changes to LRA Appendix aBoric Acid
Aging Management
ML11097026028 March 2011Nwt 817, Chemistry Control in the Seabrook Thermal Barrier Loop, FinalBoric Acid