RS-06-040, Additional Information Supporting Relief Request CR-28, Inservice Inspection Program Relief Regarding Reactor Pressure Vessel Longitudinal Shell Weld Examination Coverage for Third 10-Year Inservice Inspection Interval

From kanterella
Jump to navigation Jump to search

Additional Information Supporting Relief Request CR-28, Inservice Inspection Program Relief Regarding Reactor Pressure Vessel Longitudinal Shell Weld Examination Coverage for Third 10-Year Inservice Inspection Interval
ML060690197
Person / Time
Site: Dresden Constellation icon.png
Issue date: 03/10/2006
From: Simpson P
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-06-040
Download: ML060690197 (3)


Text

RS-06-040 March 10, 2006 U. S . Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Unit 3 Renewed Facility Operating License No. DPR-25 NRC Docket No. 50-249

Subject:

Additional Information Supporting Relief Request CR-28, Inservice Inspection Program Relief Regarding Reactor Pressure Vessel Longitudinal Shell Weld Examination Coverage for Third 10-Year Inservice Inspection Interval

References:

1 . Letter from D . Bost (Exelon Generation Company, LLC) to U.S. NRC, "Relief Request CR-28, Inservice Inspection Program Relief Regarding Reactor Pressure Vessel Longitudinal Shell Weld Examination Coverage for Third 10-Year Inservice Inspection Interval," dated May 6, 2005

2. Letter from M . Banedee (U. S . NRC) to C. M. Crane (Exelon Generation Company, LLC), "Dresden Nuclear Power Station, Unit 3 - Request for Additional Information Related to Relief Request CR-28 (TAC No. MC7068),"

dated February 22, 2006 In Reference 1, Exelon Generation Company, LLC (EGC) requested relief from American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," and the augmented examinations specified in 10 CFR 50.55a, "Codes and standards," paragraph (g)(6)(ii)(A)(2). Specifically, relief was requested for Unit 3 reactor pressure vessel longitudinal shell weld examinations where the inspection coverage achieved during the third 10-year inservice inspection interval was less than or equal to 90 percent.

In Reference 2, the NRC requested additional information to complete review of the Reference 1 relief request. In response to this request, EGC is providing the attached information .

March 10, 2006 U . S . Nuclear Regulatory Commission Page 2 There are no regulatory commitments contained in this letter . Should you have any questions related to this letter, please contact Mr. Kenneth M . Nicely at (630) 657-2803 .

Respectfully, Patrick R . Simpson Manager - Licensing Attachment : Response to Request for Additional Information

ATTACHMENT Response to Request for Additional Information NRC Request By letter dated March 23, 2005, the NFIC approved an alternative Reactor Pressure Vessel (RPV) weld examination pursuant to Title 10 of the Code of Federal Regulations (10 CFR),

Section 50 .55a(a)(3)(1) and 10 CFR 50.55a(g)(6)(ii)(A)(5) for Dresden Nuclear Power Station, Units 2 and 3 (Dresden 2 and 3) that allows permanent deferral of the requirements to perform a volumetric examination of the RPV circumferential welds for the extended operating license terms for Dresden 2 and 3. This alternative requires examinations of essentially 100 percent of all longitudinal welds and examinations of approximately 2 to 3 percent of the circumferential welds at their points of intersection with the longitudinal welds.

In proposed Relief Request CR-28, Exelon did not indicate the extent to which the reduced examination volumes for the RPV longitudinal welds, as specified in the attachment to their May 6, 2005, letter, included the points of intersectionthewith the circumferential welds. Please whether provide supplemental information indicating reduced examination volumes for the specified Dresden 3 RPV longitudinal welds included all of the points of intersection with the circumferential welds. In addition, please indicate whether 2 to 3 percent volumetric coverage of the circumferential welds in the vicinity of the points of intersection with the longitudinal welds was achieved.

Response

The reduced examination volumes for the specified RPV longitudinal welds did not include all the points of intersection with the circumferential welds. The examinations were completed to the extent practical and no unacceptable flaws were identified.

The Unit 3 RPV has 14 longitudinal welds and five circumferential welds (i .e ., four RPV circumferential shell welds and one RPV shell-to-flange weld). There are 28 intersections with the five circumferential welds. The determination of which intersections could be inspected was based on a review of outage reports for RPV examinations performed in the two most recent Unit 3 refueling outages, in conjunction with individuals who were involved with the inspections.

Of the 28 intersections, 21 were examined, and the 2-3 percent coverage requirement was met for all circumferential welds except the 3-LHD-SC1 weld . Due to jet pump diffuser interferences, coverage was limited to 0.92 percent for the 3-LHD-SC1 weld. Additional coverage limitation details are provided in Table CR-28.1 of proposed Relief Request CR-28 .

The extent to which the reduced examination volumes for the RPV longitudinal welds included points of intersection with the circumferential welds is summarized in the following table. This table also identifies the percent volumetric coverage of the circumferential welds in the vicinity of the points of intersection with the longitudinal welds .

Circumferential Total Int rsections Percent Weld Intersections Inspected Coverage 31HEYSC1 3 1 0 .92%

3-SC 1-SC2 6 5 4.6%

3-SC2-SC3 7 4 3.6%

3-SC3-SC4 8 8 7.3%

3-SC4-FLG 4 3 2 .7%

(RPV shell-to-flange weld)