RC-13-0119, Transmittal of Figures Associated with South Carolina Electric & Gas Company Response to the NRC Request for Additional Information Regarding the VCSNS Overall Integrated Plan (RC-13-0119)

From kanterella
Jump to navigation Jump to search

Transmittal of Figures Associated with South Carolina Electric & Gas Company Response to the NRC Request for Additional Information Regarding the VCSNS Overall Integrated Plan (RC-13-0119)
ML13247A339
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 08/13/2013
From: Railey D
South Carolina Electric & Gas Co
To: Kenny Nguyen
Document Control Desk, Office of Nuclear Reactor Regulation
References
RC-13-0119, RC-13-0119A
Download: ML13247A339 (3)


Text

August 30, 2013 A SCANA COMPANY RC-1 3-0119A U. S. Nuclear Regulatory Commission Attention: Kenny Nguyen Document Control Desk Washington, DC 20555-0001

Dear Mr. Nguyen :

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 Transmittal of figures associated with South Carolina Electric & Gas Company (SCE&G) response to the NRC request for additional information regarding the VCSNS Overall Integrated Plan (RC-13-0119)

The purpose of this letter is to provide the figures inadvertently not included with the South Carolina Electric & Gas Company (SCE&G) response to the NRC request for additional information regarding the VCSNS Overall Integrated Plan (RC-1 3-0119).

If you have any questions regarding this report, please contact Ms. Donna Railey at (803)-345-4107.

Very truly yours, Donna Railey Nuclear Licensing Technician BQ/DR Attachments:

1. Figure 1 Longitudinal Section Through Fuel Pool
2. Figure 2 SFP Level Instrument Channel Layout c: R. E. Martin (w/attachments)

V. E. Travick (w/attachments)

RTS (CR-12-01070)

File (81.5.07)

PRSF (RC-13-0119A)

Virgil C.Summer Station

  • Post Office Box 88 *Jenkinsville, SC
  • 29065
  • F (803) 941-9776

Figure 1 - Longitudinal Section Through Fuel Pool Auxiliary Spent Fuel Building Pool Bottom of Horn (EL.463.5')-----------------------------------------------------

(EL. 463.0') Operating Deck Level 1 (EL. 461.5') Normal Operating Level level sensitiviptyt

-. Level 2 (EL. 455.5') Radiation Protection Level (level sensitivity*)

.... Level 3 (EL. 437.0') - -Le-E Top of Fuel Level (level sensitivity*)

.Fuel StorageRack

." . (EL. 422.0') Bottom Pool Elevation

. . . n.w.e.d

. . . . . . . . . . i..

n".

. . . . .. u ".a".e-..

r . t . w e i b.. . . . . . . . . . . . . . . . . . . . . . . . . .

    • information will be provided in a 6 month update report, when it becomes available.

U I

\i -F Le.. / , \ .. JEC NOTI 0'W fIa I

RRTNLS Ar cufka, Eiaure 2 - SEP Level Instrument Channel Lavout ieMEe9I~l, 5 C MEEWFhML 'K Ja fsiIS t N FS0 1 00t L. ~4 1 Li 41 IF. -Il.

rhl ww L.I

-I" UI n

U pt Ij t;F7 UI rTt~r I_ I i

U I U s'o".

U

~~G

  • s

.qj I

I_

r-l--i-i BACKUP D

V

.1 BUILDING EXTERIOR WALL FH LT SPENT FUEL POOL NEW LEVEL INSTRUMENTATION FL 1 N

VEGA Pulse Radar S Level Indicators (Wave Guide Horn) 10 E Wave DC AUX Guide Power Supply BUILDING STAIRWELL Tube /II _ ___.. --

Level Display'.

LT IPRIMARY

..- I II i ,


, - *t -~

-11 1 r-i nI M'-I r-i1 r-1 I -- q- 7 1 1 IZMLI4 F 4j

--OF Mnt sma.n IIIU MOI~ bdoT_O IIA -ý 144 4

~4.I A L-*-_=.

4 - I- r Lpa

,I 01"7-j4f -~I 7

  • lIp fltU WMflThhS.J.~ C I I II~*r---J CO H

, i i I V I

~ @ i V I II II gl I

4 1

.UI Ems PI. *5110 a 160,51, NEWEC, .- Ul

,J 0 1,63 Wt Ica NOT% I'b TYPI 241 PLACIS i

x If IF d, Im xf

.1 g..

"m H 1S.442 104,. FOL

'a 1WTHIS, IIGkj- AN -4 NF

.T