MONTHYEARRA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-02-15015 February 2024 Fifth Ten-Year Inservice Inspection Interval Limited Examinations RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval2023-04-24024 April 2023 Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval RA-20-0329, Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers2021-09-0707 September 2021 Proposed Alternative for Inservice Inspection of the Containment Metallic Liner and Moisture Barriers RA-21-0056, Refueling Outage 32 Steam Generator Tube Inspection Report2021-05-26026 May 2021 Refueling Outage 32 Steam Generator Tube Inspection Report RA-19-0393, Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report2021-03-0808 March 2021 Refuel 32 (R2R32) Inservice Inspection Program Ninety Day Owner'S Activity Report RA-19-0138, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections2019-07-23023 July 2019 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Reactor Vessel Cold Leg Dissimilar Metal Weld Inspections RA-19-0106, Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head2019-07-10010 July 2019 Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head RA-19-0094, Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval2019-02-20020 February 2019 Refuel 31 (R231) Owner'S Activity Report, Fifth 10-Year Inservice Inspection Interval RNP-RA/17-0065, Refueling Outage 30 Steam Generator Tube Inspection Report2017-09-18018 September 2017 Refueling Outage 30 Steam Generator Tube Inspection Report RNP-RA/17-0051, Submittal of Nine Day Inservice Inspection Summary Report2017-06-29029 June 2017 Submittal of Nine Day Inservice Inspection Summary Report RNP-RA/15-0081, Submittal of Ninety-Day Inservice Inspection Summary Report2015-09-17017 September 2015 Submittal of Ninety-Day Inservice Inspection Summary Report RNP-RA/15-0063, Submittal of Ninety Day Inservice Inspection Summary Report - Supplement2015-07-0808 July 2015 Submittal of Ninety Day Inservice Inspection Summary Report - Supplement RNP-RA/14-0061, Submittal of Snubber Examination and Testing Program2014-05-29029 May 2014 Submittal of Snubber Examination and Testing Program RNP-RA/14-0040, Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i)2014-05-0909 May 2014 Relief Request (RR)-10 for Expanded Applicability for Use of ASME Code Case N-532-4, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, Per 10 CFR 50.55(a)(3)(i) RNP-RA/14-0014, Submittal of Ninety Day Inservice Inspection Summary Report2014-01-30030 January 2014 Submittal of Ninety Day Inservice Inspection Summary Report RNP-RA/12-0119, Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program...2012-11-11011 November 2012 Supplemental Response to Request for Additional Information Related to Relief Request (RR)-07 from Immediate ASME Code Repair of Refueling Water Storage Tank Drain Valve (SI-837) for Fifth Ten-Year Inservice Inspection Program... RNP-RA/12-0067, Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval2012-06-19019 June 2012 Response to the NRC Request for Additional Information Regarding Inservice Inspection Program Plan for the Fifth Ten-Year Interval RNP-RA/12-0063, Submittal of 90 Day Inservice Inspection Summary Report2012-06-15015 June 2012 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/12-0064, Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan2012-06-0404 June 2012 Response to NRC Request for Additional Information Related to Relief Requests (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan RNP-RA/12-0056, Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan2012-05-10010 May 2012 Response to NRC Request for Additional Information for the Fifth Ten-Year Interval Inservice Testing Program Plan RNP-RA/12-0017, Inservice Testing Program Plan for the Fifth-Ten Year Interval2012-03-16016 March 2012 Inservice Testing Program Plan for the Fifth-Ten Year Interval RNP-RA/12-0023, Inservice Inspection Program for the Fifth Ten-Year Interval2012-03-14014 March 2012 Inservice Inspection Program for the Fifth Ten-Year Interval ML1103300852011-01-27027 January 2011 H. B. Robinson, Unit 2 - Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xi, for the Fourth Ten-Year Inservice Inspection Program Program Interval (Relief Request No. RR-23) RNP-RA/10-0091, Submittal of 90 Day Inservice Inspection Summary Report2010-09-22022 September 2010 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/09-0010, Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 252009-02-11011 February 2009 Submittal of 90 Day Inservice Inspection Summary Report for Refueling Outage 25 RNP-RA/08-0047, Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results2008-04-30030 April 2008 Response to NRC Request for Additional Information on the Steam Generator Inservice Inspection Results RNP-RA/07-0077, Submittal of 90 Day Inservice Inspection Summary Report2007-08-0202 August 2007 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/06-0001, Submittal of 90 Day Inservice Inspection Summary Report2006-01-16016 January 2006 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/04-0110, Submittal of 90 Day Inservice Inspection Summary Report2004-08-26026 August 2004 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/03-0034, Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements2003-04-15015 April 2003 Revision to Inservice Testing Program Relief Request IST-RR-3 for Containment Spray Pump Comprehensive Pump Test Requirements RNP-RA/03-0018, Submittal of 90 Day Inservice Inspection Summary Report2003-02-11011 February 2003 Submittal of 90 Day Inservice Inspection Summary Report RNP-RA/02-0065, Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program2002-05-14014 May 2002 Relief Request Number RR-12 for the Fourth Ten-Year Interval Inservice Inspection Program ML0205703112002-02-20020 February 2002 Revision 1 to Inservice Testing Program Plan - Fourth Interval. 2024-02-15
[Table view] Category:Letter type:RA
MONTHYEARRA-24-0165, Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-07-26026 July 2024 Response to Request for Additional Information (RAI) Regarding Proposed Alternative for the Fifth Ten-Year Inservice Inspection Interval Limited Examinations RA-24-0173, Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld2024-06-28028 June 2024 Renewed License Number DPR-23 Request Review of White Papers to Determine Fracture Toughness-based Reference Temperature of Heat Number W5214 Weld RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable RA-24-0030, Duke Energy - Annual Radioactive Effluent Release Report - 20232024-04-29029 April 2024 Duke Energy - Annual Radioactive Effluent Release Report - 2023 RA-24-0083, Annual Report of Changes Pursuant to 10 CFR 50.462024-04-25025 April 2024 Annual Report of Changes Pursuant to 10 CFR 50.46 RA-24-0031, Annual Radiological Environmental Operating Report - 20232024-04-23023 April 2024 Annual Radiological Environmental Operating Report - 2023 RA-24-0094, Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Traini2024-04-17017 April 2024 Request for Approval of Duke Energy Corporation Transition to ANSI/ANS3.1-2014, American National Standard for Selection and Training of Nuclear Power Plant Personnel and Revision 4 of Regulatory Guide 1.8, Rev. 4 Qualification and Training RA-24-0099, Reactor and Senior Reactor Operator Initial Examination Outlines2024-04-10010 April 2024 Reactor and Senior Reactor Operator Initial Examination Outlines RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations RA-24-0085, Onsite Property Insurance Coverage2024-04-0101 April 2024 Onsite Property Insurance Coverage RA-24-0086, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-04-0101 April 2024 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-24-0080, Duke Energy Progress, LLC - Request for Review of Master Curve Methodology to Determine the Fracture Toughness-based Reference Temperature Topical Reports2024-03-28028 March 2024 Duke Energy Progress, LLC - Request for Review of Master Curve Methodology to Determine the Fracture Toughness-based Reference Temperature Topical Reports RA-23-0300, Fifth Ten-Year Inservice Inspection Interval Limited Examinations2024-02-15015 February 2024 Fifth Ten-Year Inservice Inspection Interval Limited Examinations RA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0297, Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 502023-11-15015 November 2023 Transmittal of the Duke Energy Corporation Topical Report (Duke QAPD-001-A), Amendments 48, 49 and 50 RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations RA-23-0044, Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.462023-04-26026 April 2023 Aduke Energy Annual Report of Changes Pursuant to 10 CFR 50.46 RA-23-0047, Duke Energy Annual Radiological Environmental Operating Report - 20222023-04-26026 April 2023 Duke Energy Annual Radiological Environmental Operating Report - 2022 RA-23-0064, Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval2023-04-24024 April 2023 Inservice Testing Program Plan and Snubber Program Plan for Sixth 10-Year Inservice Testing (1ST) Program Interval RA-23-0046, Annual Radioactive Effluent Release Report - 20222023-04-24024 April 2023 Annual Radioactive Effluent Release Report - 2022 RA-23-0080, Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube2023-04-0505 April 2023 Refueling Outage 32 Steam Generator Tube Inspection Report Supplement Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube RA-23-0043, Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owners Activity Report and Analytical Evaluations2023-03-30030 March 2023 Refuel 33 (R2R33) Inservice Inspection Program Ninety Day Owners Activity Report and Analytical Evaluations RA-23-0036, Biennial Decommissioning Financial Assurance Reports2023-03-30030 March 2023 Biennial Decommissioning Financial Assurance Reports RA-23-0040, Onsite Property Insurance Coverage2023-03-30030 March 2023 Onsite Property Insurance Coverage RA-23-0039, 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2023-03-30030 March 2023 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums RA-23-0055, Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 22023-03-24024 March 2023 Notice of Intent to Pursue Subsequent License Renewal for H. B. Robinson Steam Electric Plant, Unit Number 2 RA-22-0257, Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-02-17017 February 2023 Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-02-0909 February 2023 Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0001, Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI2023-02-0202 February 2023 Request to Use a Provision of a Later Edition and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-23-0029, Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range)2023-01-30030 January 2023 Technical Specifications Section 5.6.6 Post Accident Monitoring Instrumentation Report for Inoperable Containment Sump Water Level (Wide Range) RA-23-0027, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20222023-01-30030 January 2023 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2022 RA-22-0256, Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-01-23023 January 2023 Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab2022-12-0505 December 2022 Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab 2024-07-26
[Table view] |
Text
Kevin Ellis (DUKE Manager - Nuclear Support Services H. B. Robinson Steam Electric Plant, Unit 2 ENERGY Duke Energy 3581 West Entrance Road Hartsville, SC 28550 843.951.1329 Kevin.El/is@duke-energy.com Serial: RA-19-0106 10 CFR 50.55(a)
July 10, 2019 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23
SUBJECT:
Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head Ladies and Gentlemen:
In accordance with 10 CFR 50.55a(z)(1), Duke Energy Progress, LLC (Duke Energy) requests approval for H.B. Robinson Steam Electric Plant Unit 2 (Robinson Unit 2) to extend the examination of Reactor Vessel Closure Head (RVCH) nozzles and partial-penetration welds from the refueling outage scheduled to commence in September 2020 to the refueling outage scheduled to commence in September 2024. The proposed extension would equate to an examination interval of 19 years. Duke Energy is requesting the extension on the basis that the alternative provides an acceptable level of quality and safety.
Duke Energy is requesting review and approval of the Relief Request by August 1, 2020 to support the use of the proposed alternative.
Relief Request RA-19-0106 is provided as an enclosure to this letter.
This document contains no new Regulatory Commitments.
Should you have any questions concerning this letter, or require additional information, please contact Art Zaremba, Director- Nuclear Fleet Licensing, at 980-373-2062.
Kevin Ellis- Manager- Nuclear Support Services, H.B. Robinson Steam Electric Plant, Unit 2.
Enclosure 1 :- Relief Request RA-19-0106 cc: L. Dudes, NRC Regional Administrator, NRC, Region II J. Hammon, NRC Senior Resident Inspector, HBRSEP, Unit No. 2 N. Jordan, NRC Project Manager, NRR
U.S. Nuclear Regulatory Commission Enclosure 1, Page 1 Serial: RA-19-0106 Enclosure 1 Duke Energy Progress, LLC H. B. Robinson Steam Electric Plant, Unit 2 Relief Request Number RA-19-0106 Relief Requested in Accordance with 10 CFR 50.55a(z)(1) for Volumetric or Surface Examination of Code Case N-729-4 Examinations of the Reactor Pressure Vessel Upper Head
H. B. Robinsion Steam Electric Plant, Unit 2 Relief Request RA-19-0106 Enclosure 1 1.0 American Society of Mechanical Engineers (ASME) Code Component(s) Affected 1.1 The affected components are ASME Class 1 Pressurized Water Reactor (PWR)
Reactor Vessel Closure Head (RVCH) nozzles and partial-penetration welds fabricated with primary water stress corrosion cracking (PWSCC) resistant materials. H. B. Robinson Steam Electric Plant (RNP) Unit 2 penetration tubes and vent pipe are fabricated from Alloy 690 material.
2.0 Applicable Code Edition and Addenda
2.1 The 5th inservice inspection (ISI) interval code of record for RNP Unit 2 is the 2007 Edition with 2008 Addenda of ASME Boiler and Pressure Vessel Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components.
3.0 Applicable Code Requirement
3.1 Code of Federal Regulations (CFR) 10CFR50.55a(g)(6)(ii)(D) delineates the Augmented ISI requirements for Reactor Vessel Head Inspections.
10CFR50.55a(g)(6)(ii)(D)(1), requires:
Holders of operating licenses or combined licenses for pressurized-water reactors as of or after August 17, 2017 shall implement the requirements of ASME BPV Code Case N-729-4 instead of ASME BPV Code Case N-729-1, subject to the conditions specified in paragraphs (g)(6)(ii)(D)(2) through (4) of this section, by the first refueling outage starting after August 17, 2017.
3.2 ASME Code Case N-729-4, -2410 specifies the Inspection Program requirements for the reactor vessel upper head and its penetrations (nozzles and partial-penetration welds). The basic inspection requirements of Code Case N-729-4,
-2410 as contained within Table 1 for partial-penetration welded Alloy 690 head penetration nozzles are as follows:
3.2.1 Item Number B4.40: Volumetric or surface examination of all nozzles, not to exceed one inspection interval (nominally 10 calendar years) provided that flaws attributed to primary water stress corrosion cracking (PWSCC) have not been identified.
3.2.2 Item Number B4.30: Direct visual examination (VE) of the outer surface of the head for evidence of leakage every third refueling outage or 5 calendar years, whichever is less.
3.3 The volumetric and/or surface examination frequency for Item Number B4.40 required in ASME Code Case N-729-4 is identical to that of Code Case N-729-1.
The previous NRC conditions on Code Case N-729-1 and the current NRC conditions on Code Case N-729-4 in 10CFR50.55a(g)(6)(ii)(D) do not affect the examination frequency required for Item Number B4.40.
Page 2 of 8
H. B. Robinsion Steam Electric Plant, Unit 2 Relief Request RA-19-0106 Enclosure 1
4.0 Reason for Request
4.1 The treatment of Alloy 690 RPV Closure Heads in Code Case Versions N-729 through N-729-4 (Reference 8.1) was intended to be conservative and subject to reassessment once additional laboratory data and plant experience on the performance of Alloy 690 and Alloy 52/152 weld metals became available. Electric Power Research Institute (EPRI) generated MRP-375 (Materials Reliability Program) (Reference 8.4), Technical Basis for Reexamination Interval Extension for Alloy 690 PWR Reactor Vessel Top Head Penetration Nozzles (EPRI 3002002441) using plant and laboratory data. MRP-375 was developed to support a technically based volumetric or surface examination frequency using appropriate analytical tools. This technical basis demonstrates that the examination frequency can be extended to 20 years while maintaining an acceptable level of quality and safety. Additionally, new rulemaking (Reference 8.7) is expected to be published in late 2019 which will revise 10 CFR 50.55a to incorporate by reference ASME BPV Code Case N-729-6. The examination frequency delineated in Code Case N-729-6 for Item Number B4.40 has been extended from no more than one inspection interval (nominally 10 calendar years) to no more than 2 inspection intervals (20 calendar years).
4.2 The NRC previously approved deferral of the volumetric or surface inspection of the RNP Unit 2 head nozzles until the refueling outage that commenced in September of 2018 via RR-11 (Reference 8.2), and again until the refueling outage that is scheduled to commence in September of 2020 via RR-12 (Reference 8.3).
These deferrals were intended to provide sufficient time for the NRC to review and accept the conclusions reached in MRP-375 (Reference 8.4).
4.3 Duke Energy is requesting approval of deferral beyond the previously approved extensions of the nominal 10-year examination frequency for Item B4.40 of Table 1 of Code Cases N-729-1 and N-729-4 until the refueling outage scheduled to commence in the fall of 2024. This extension would align with the new examination frequency required in Code Case N-729-6 (Reference 8.7) of 20 years for Item Number B4.40.
5.0 Proposed Alternative and Basis for Use 5.1 Pursuant to 10 CFR 50.55a(z)(1), Duke Energy requests an alternative from performing the required volumetric or surface examinations for the RNP RVCH components identified above at the frequency prescribed in ASME Code Case N-729-4. Specifically, Duke Energy requests to extend the frequency of the volumetric or surface examination of the RNP RVCH of Table 1, Item B4.40 of ASME Code Case N-729-4 to the 34th refueling outage, which is scheduled to commence in the fall of 2024. The proposed extension would equate to an examination interval of 19 years.
5.2 On March 3, 2016, the ASME approved the sixth revision of ASME BPV Code Case N-729-6. This revision includes changes that were deemed necessary by the Page 3 of 8
H. B. Robinsion Steam Electric Plant, Unit 2 Relief Request RA-19-0106 Enclosure 1 ASME to supersede the previous requirements under historical revisions of Code Case N-729 to establish an effective long-term inspection program for the RPV upper head penetration nozzles and associated welds in PWRs. One major change in the latest revisions is extending PWSCC resistant RPV upper head nozzle and partial-penetration weld inspection frequency from every 10 years to every 20 years.
The extension requested by Duke Energy for RNP Unit 2 would align with the examination frequency delineated in Code Case N-729-6 of every 20 years. No alternative examination processes are proposed to those required by ASME Code Case N-729-4, as conditioned by 10CFR50.55a(g)(6)(ii)(D). The visual examinations and acceptance criteria as required by Item B4.30 of Table 1 of ASME Code Case N-729-4 as conditioned by 10 CFR 50.55a(g)(6)(ii)(D)(3), are not affected by this request and will continue to be performed as required.
5.3 As documented in Section 7.0 (Related Industry Relief Requests), NRC has approved similar extensions for other replacement RVCHs of more than 5 years beyond the nominal 10 years required by ASME Code Case N-729-4 to align with scheduled refueling outages. Duke Energy requests the total time deferral of approximately 10 years for RNP Unit 2 to align with the frequency required in ASME BPV Code Case N-729-6 which is scheduled to be published in rulemaking that should be issued in late 2019.
5.4 The original RNP RVCH, which was manufactured with Alloy 600/82/182 materials, was replaced with a new RVCH using Alloy 690/52/152 materials during the refueling outage that returned to operation in October 2005. In accordance with NRC approval of RNP Unit 2 Relief Request (RR-12), RNP Unit 2 will be required to perform a volumetric and/or surface examination of all nozzles during the 32nd refueling outage, which is scheduled to commence in September of 2020.
5.5 Additionally, evaluations have been performed to demonstrate the resistance of Alloys 690/52/152 to PWSCC under a recent EPRI MRP initiative provided in EPRI MRP-375 (Reference 8.4). This report presents both deterministic and probabilistic evaluations that assess the improved PWSCC resistance of Alloys 690/52/152.
5.6 RNP Unit 2 Design and Operation 5.6.1 The analysis performed by EPRI MRP-375 bounds the design and operation of the RNP Unit 2 replacement RVCH. The RVCH contains forty-seven (47) nozzle penetrations of which forty-five (45) are used for control rod drive mechanisms (CRDMs), and two (2) small diameter penetrations near the center of the RVCH are used for the Reactor Head Vent (RHV) and Reactor Vessel Level Indication System (RVLIS). The Replacement RVCH was manufactured by Mitsubishi and placed in service in October 2005. The replacement RVCH was manufactured as a single forging, which eliminated the center disc and flange circumferential weld in the original RNP RVCH.
The replacement RVCH is fabricated from SA-508, Grade 3, Class 1 steel and clad with an initial layer of 309 L stainless steel followed by subsequent layers of 308 L stainless steel.
Page 4 of 8
H. B. Robinsion Steam Electric Plant, Unit 2 Relief Request RA-19-0106 Enclosure 1 5.6.2 The nozzle housing penetrations on the replacement RVCH are fabricated from SB-167 (Alloy 690) UNS N06690 and the vent pipe is made from SB-167 (Alloy 690) and SA-312 Type 316. The nozzle J-groove welds utilize ERNiCrFe-7 (UNS N06052) and ENiCrFe-7 (UNS W86152) weld materials.
5.6.3 A preservice volumetric examination of the RNP Unit 2 replacement RVCH J-groove welded CRDM, RHV and RVLIS nozzles was performed by Westinghouse prior to installation. The volumetric examinations included scanning the nozzles to the fullest extent possible, from the end of the nozzle to a minimum of two inches above the root of the J-groove weld on the uphill side. There were no ultrasonic examination responses indicative of planar flaws identified during the volumetric examinations. Additionally, a preservice eddy current examination of the CRDM, RHV and RVLIS nozzle welds was performed. There were no responses indicative of planar flaws identified during the eddy current examinations.
5.6.4 Bare metal visual examinations were performed in 2010 and 2015 in accordance with ASME Code Case N-729-1, Table 1, Item Number B4.30; and again in 2018 in accordance with ASME Code Case N-729-4, Table 1, Item Number B4.30. These visual examinations (VE) were performed by visual examination (VT-2) qualified examiners on the outer surface of the RVCH including the annulus area of the penetration nozzles. These examinations did not reveal any surface or nozzle penetration boric acid that would be indicative of nozzle leakage.
5.6.5 The EPRI MRP-375 analyses assume a reactor vessel head operating temperature of 613°F to bound the known RV head temperatures of all PWRs currently operating. The nominal operating hot leg temperature for RNP Unit 2 is 604.1°F. Core bypass flow is expected to reduce the upper head temperature by approximately 4.35°F, which would result in an average RVCH temperature of approximately 599.75°F. Based on this, the RNP RVCH average operating temperature (which is the measure of temperature relevant to potential PWSCC degradation) is bounded by the evaluation results in EPRI MRP-375, which assumes 613°F for its main deterministic and probabilistic calculations.
5.7 Conclusions 5.7.1 Duke Energy believes that the Alloy 690 nozzle base and Alloy 52/152 weld materials used in the RNP Unit 2 replacement RVCH provide for a superior reactor coolant system pressure boundary where the potential for PWSCC has been shown by analysis and by years of positive industry experience to be remote. This is further supported by visual examination of the RNP RVCH in 2010, 2015, and 2018 all resulting in no relevant indications, and the volumetric examinations performed by other Westinghouse designed plants during their nominal 10-year volumetric or surface examination under similar operating conditions which did not reveal PWSCC.
Page 5 of 8
H. B. Robinsion Steam Electric Plant, Unit 2 Relief Request RA-19-0106 Enclosure 1 5.7.3 The proposed revised examination frequency will continue to provide reasonable assurance of structural integrity. Additionally, the proposed frequency aligns with the examination interval delineated in Code Case N-729-6 which is projected to be approved for use in the new rule making scheduled to be issued in late 2019. For the reasons noted above, it is requested that the NRC authorize this proposed alternative in accordance with 10CFR50.55a(z)(1) as the alternative provides an acceptable level of quality and safety.
6.0 Duration of Proposed Alternative 6.1 The proposed alternative is requested for the duration up to and including the 34th RNP Unit 2 refueling outage that is scheduled to commence in the fall of 2024.
7.0 Related Industry Relief Requests 7.1 There have been submittals from multiple plants requesting an alternative from the nominal 10-year interval of ASME Code Cases N-729-1 and N-729-4 for volumetric or surface examinations of heads with Alloy 690 nozzles. The prior RNP Unit 2 requests for relief and requests from other plants, including the associated status at the time of submittal of this request, are shown below in Table 7-1. Alternative intervals greater than 15 years have previously been granted to align with scheduled refueling outages. The approved Calvert Cliffs Units 1 & 2 alternative (noted in the table below) permitted an inspection interval not to exceed 16 years to align with scheduled refueling outages. Furthermore, alternatives have been approved at three sites that further extend the inspection interval from an initial approved alternative to a total interval of up to 15.5 years at Arkansas Nuclear One 1, Beaver Valley 1, and St. Lucie 1.
Page 6 of 8
H. B. Robinsion Steam Electric Plant, Unit 2 Relief Request RA-19-0106 Enclosure 1 Table 7-1 NRC ADAMS Accession No.
Request for Relief Additional NRC Safety RAI Response Request Information Evaluation Plant (RAI) Status Arkansas Nuclear One, Unit 1 ML14118A477 ML14258A020 ML14275A460 ML14330A207 Approved (2.5-year Extension)
Arkansas Nuclear One, Unit 1 ML16173A297 None None ML17018A283 Approved (5.5-year Extension)
Beaver Valley, Unit 1 ML14290A140 None None ML14363A409 Approved (2-year Extension)
Beaver Valley, Unit 1 ML17044A440 None None ML17222A162 Approved (5-year Extension)
Calvert Cliffs, ML15201A067 None None ML15327A367 Approved Units 1 & 2 Comanche Peak, ML15120A038 None None ML15259A004 Approved Unit 1 D.C. Cook, ML15023A038 None None ML15156A906 Approved Units 1 & 2 J.M. Farley, ML15111A387 None None ML15104A192 Approved Unit 2 North Anna, ML14283A044 None None ML15091A687 Approved Unit 2 Prairie Island, ML14258A124 ML15030A008 ML15036A252 ML15125A361 Approved Units 1 and 2 Palo Verde, ML17299B333 None None ML18040A331 Approved Units 1, 2, and 3 H. B. Robinson, ML14251A014 ML14294A587 ML14325A693 ML15021A354 Approved Unit 2 H. B. Robinson, ML17269A016 None None ML18163A412 Approved Unit 2 Salem, ML15098A426 None None ML15349A956 Approved Unit 1 St. Lucie, Unit 1 ML14206A939 ML14251A222 ML14273A011 ML14339A163 Approved (3-year Extension)
St. Lucie, Unit 1 ML17045A357 None None ML17219A174 Approved (5.5-year Extension)
St. Lucie, ML16076A431 None None ML16292A761 Approved Unit 2 Page 7 of 8
H. B. Robinsion Steam Electric Plant, Unit 2 Relief Request RA-19-0106 Enclosure 1 8.0 References 8.1 ASME Code Case N-729-4, Alternative Examination Requirements for PWR Reactor Vessel Upper Heads With Nozzles Having Pressure-Retaining Partial-Penetration Welds,Section XI, Division 1, Approved June 22, 2012 8.2 U.S. NRC, H. B. Robinson Steam Electric Plant, Unit No. 2 - Relief Request (RR-11) - Relief from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1 (TAC No. MF4801) August 27, 2014 (ML14251A014).
8.3 U.S. NRC, H. B. Robinson Steam Electric Plant Unit No. 2 - Relief Request (RR)-12 Regarding Proposed Alternative to ASME Code Case N-729-4 Examination Frequency Requirements (EPID L-2017-LLR-0089) June 25, 2018 (ML18163A412) 8.4 EPRI MRP-375, "Technical Basis for Reexamination Interval Extension for Alloy 690 PWR Reactor Vessel Top Head Penetration Nozzles," Report No.
3002002441, February 2014 8.5 EPRI MRP-111, "Resistance to Primary Water Stress Corrosion Cracking of Alloys 690, 52, and 152 in Pressurized Water Reactors," Report No.1009801, March 2004 (ML041680546).
8.6 EPRI MRP-110, "Reactor Vessel Closure Head Penetration Safety Assessment for U.S. PWR Plants," Report No.1009807, November 2004 (ML041680506).
8.7 Federal Register/Vol. 83, No. 218/Friday, November 9, 2018/Proposed Rules, FR Doc. 2018-24076 Page 8 of 8