RA-14-050, Supplement to Fitness for Duty Performance Data Reports-Annual 2013

From kanterella
Jump to navigation Jump to search
Supplement to Fitness for Duty Performance Data Reports-Annual 2013
ML14209A984
Person / Time
Site: Dresden, Peach Bottom, Palisades, Oyster Creek, Byron, Three Mile Island, Braidwood, Limerick, Clinton, Quad Cities, LaSalle
Issue date: 07/28/2014
From: Gullott D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-14-050, RS-14-182, TMl-14-078
Download: ML14209A984 (3)


Text

4300 W1nf1eld Warrenv11'.e, 1L t 530 10 CFR 26.203(e) 10 CFR 26.717(e)

RS-14-182 RA-14-050 TMl-14-078 July 28, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

U. S. Nuclear Regulatory Commission July 28, 2014 Page 2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289

Subject:

Supplement to Fitness for Duty Performance Data Reports - Annual 2013

Reference:

Letter from D. M Gullatt (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Fitness for Duty Performance Data Reports -

Annual 2013," dated February 27, 2014 In accordance with 10 CFR 26.717(e), "Fitness-for-duty program performance data," and 10 CFR 26.203, "General provisions," paragraph (e), "Reporting," Exelon Generation Company, LLC (EGC) provided the compiled fitness-for-duty program performance data for the EGC nuclear power stations and the corporate support employees within the scope of the rule for the twelve-month period ending December 31, 2013, in the referenced letter. In addition, the fatigue performance data had been submitted separately via a general submission in the Electronic Information Exchange (EIE).

In discussions with EGC on April 14, 2014, members of your staff identified discrepancies between the drug and alcohol performance data submitted in the referenced letter and the subsequent transmitted performance data that had been converted into the electronic reporting forms for the EIE General Submission Portal (FFD Program Performance Data Reporting System Annual Reporting-Form for Drug and Alcohol Tests, Single Positive Test Form).

EGC has reviewed and corrected the minor deficiencies and completed resubmittal of the annual 2013 drug and alcohol performance data via the EIE General Submission Portal on May 1, 2014. The electronic reporting forms submitted in May 2014 supersede the drug and alcohol performance data submitted in the referenced letter. Note that the annual fatigue performance data submitted via the EIE General Submission Portal on February 27, 2014, is unaffected by this supplemental submittal.

There are no regulatory commitments contained in this letter. Should you have any questions, please contact Frank J. Mascitelli at (610) 765-5512.

Respectfully, David M. Gullatt Manager - Licensing Exelon Generation Company, LLC

U. S. Nuclear Regulatory Commission July 28, 2014 Page 3 cc: USNRC Region I, Regional Administrator USNRC Region Ill, Regional Administrator USNRC Project Manager, NRR - Braidwood Station USNRC Project Manager, NRR - Byron Station USNRC Project Manager, NRR - Clinton Power Station USNRC Project Manager, NRR - Dresden Nuclear Power Station USNRC Project Manager, NRR - LaSalle County Station USNRC Project Manager, NRR - Limerick Generating Station USNRC Project Manager, NRR - Oyster Creek Nuclear Generating Station USNRC Project Manager, NRR - Peach Bottom Atomic Power Station USNRC Project Manager, NRR - Quad Cities Nuclear Power Station USNRC Project Manager, NRR - Three Mile Island Nuclear Station USNRC Senior Resident Inspector - Braidwood Station USNRC Senior Resident Inspector - Byron Station USNRC Senior Resident Inspector - Clinton Power Station USNRC Senior Resident Inspector - Dresden Nuclear Power Station USNRC Senior Resident Inspector - LaSalle County Station USNRC Senior Resident Inspector - Limerick Generating Station USNRC Senior Resident Inspector - Oyster Creek Nuclear Generating Station USNRC Senior Resident Inspector - Peach Bottom Atomic Power Station USNRC Senior Resident Inspector - Quad Cities Nuclear Power Station USNRC Senior Resident Inspector - Three Mile Island Nuclear Station