PY-CEI-NRR-0595, Application for Amend to License NPF-58,adding Footnote to Tech Spec 3.7.3 to Modify Applicable Conditions During Which RCIC Sys Required to Operate.Fee Paid

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-58,adding Footnote to Tech Spec 3.7.3 to Modify Applicable Conditions During Which RCIC Sys Required to Operate.Fee Paid
ML20211G329
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/20/1987
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211G333 List:
References
PY-CEI-NRR-0595, PY-CEI-NRR-595, NUDOCS 8702250350
Download: ML20211G329 (4)


Text

"

t THE CLEVELAND ELECTR P.O. BOX 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLIC SQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN SR VICE PRESIDENT

"" "*" y February 20, 1987 3 PY-CEI/NRR-0595 L Q p .. .bl(V<.

4 (:-

\,?

, & Y

%.g3'-

%Qhym 0jgN.s%!2 s

Document Control Desk foR%. {C V U.S. Nuclear Regulatory Commission Washington D.C. 20555 -/

Perry Nuclear Power Plant Docket No. 50-440 Emergency Technical Specification Change Request Gentlemen:

Pursuant to 10 CFR 50.59, the Cleveland Electric Illuminating Company hereby requests amendment of Appendix A to the Perry Nuclear Power Plant operating license (NPF-58).

Summary During Reactor Core Isolation Cooling (RCIC) system testing, CEI experienced fluctuations on indicated level channels (see attached). CEI has determined that this anomaly occurs during RCIC system injection to the vessel at low reactor power. Therefore, CEI will place administrative controls on the injecton of the RCIC system to the vessel. These controls include disabling the automatic operation of the injection valve, but leaving the capability for manual operation of the injection valve with adequate procedural cautions to allow operator discretion. Since this action would render the system inoperable, CEI proposes to add a footnote to Technical Specification 3.7.3 to modify the applicable conditions during which the RCIC system is required to be operable.

This modification in required operational conditions will ensure that the reactor water level instrumentation will remain operable during present operations. In that CEI has determined by analysis that tne RCIC system is not required to perform its design basis at all conditions less than 75% of rated thermal power, and that the RCIC system shall be modified to preclude this anomaly prior to reaching that power level, this proposed change is in the best interest of the company and will not result in any increased risk to the health and safety of the public.

8702250350 870220 PDR ADOCK 05000440 g\

P PDR p

7

% m ,

e..

~'? . ,,

USNRC-

~ ', February 20, 1987

- PY-CEI/NRR-0595 L x -~ ,

~

Significant Hazards Analysis .

The st'andards used to arrive at a determination that a. request for amendment requires no significant hazards consideration are included in the Commission's regulations, 10 CFR 50.91, which state that the operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new'or different kind of accident from any accident previously evaluated, or (3). involve a significant reduction '

in a margin of safets, i-CEI has reviewed the p. wid change with respect to these three factors.

Consistent with the design butis for the RCIC system, the most limiting transient with the RCIC systec inoperable is the loss of feedwater transient.

CEI has performed a cor.servative analysis to determino that this system is not required to mitigate the consequences of any accident or transient at reactor powers less than 75% of rated thermal power (sce attached). This conservative analysis utilized dacay heat generated;in accordance with 10 _

CFR 50 Appendix-K and only tcok credit for reduced = power. This analysis resulted in Peak Clad Temperatures (PCTs) much lowei- than allowed under Appendix K. Since the-prop'osed change would require the RCIC system to be operable above this thermal power,,CEI haszconc1Eded that this proposed change involves no significant increase irithe probability.or consequences of an accident previously' evaluated'.; ' -

CEI has reviewed its design basis accidents'and has determinedithat its present design basis, as presented in the FSAR (through Amehdment 25),

conservatively bounds operation of Perry to (5% of rated thermal power with the RCIC system inoperable. Although appropriate administrative controls will be added to the RCIC system operating instructions and the plant off normal instructions, as necessary, this amendment will not require any changes to the emergency operating procedures. Therefore, CEI has concluded that

~

this proposed change does not create the possibility of a new or different kind of accident from any. accident previously evaluated.

CEI has determined, by conservative a alysis, that the RCIC system is not required to mitigate the consequences of any accident or transient within the proposed power limit. Therefore, CEI has concluded that this proposed

. change does not involve.a significant reduction in a margin of safety.

For these reasons, CEI has concluded that the, proposed aEendment involves no significant hazardsCconsiderations.

Environmental Impact - -

Cleveland Electric Illuminating has reviewed the proposed Technical Specification i

change against the criteria of 10 CFR 51.22 for environmental considerations.

As shown above, the proposed' change does not involve a significant hazards

~ . , ~ e t.

- , , - . , - - - . .- ,- . , - - . ~ - , - ,

' h USNRC February 20, 1987 PY-CEI/NRR-0595 L consideration, nor increase the types and amounts of effluents that may be released offsite, nor significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing, CEI concludes 4 that the proposed Technical Specification change meets the criteria given in 10 CFR 51.22(c)(9) for.a categorical exclusion from the requirement for an Environmental Impact Statement.

Statement of Emergency Circumstances CEI requires this amendment in order to continue operation and startup testing of Perry Unit 1. CEI has scheduled a short outage following Test Condition Three (TC-3) to perform preplanned insp'ctions e and maintenance activities. CEI is evaluating appropriate system. modifications during this outage to eliminate the effect. By performing appropriate system modifications, operation of the RCIC system will not cause any anomalies in reactor vessel ,

water level instrumentation. It is anticipated'that such modific.ations ,

can be completed by December 31, 1987.

The Perry Technical Specifications allow operation to continue for 14 days provided the High Pressure Core Spray System is operable. If this change 2

is not granted, CEI will be forced to shutdown the plant in accordance with plant Technical Specifications. In addition, further startup testing cannot be conducted as the plant Technical Specifications do not allow CEI to make changes in Operational Conditions with the RCIC system inoperable.

This action meets 10 CFR 50.91(a)(5), in that " failure to act in a timely way would result in de-rating or shutdown of a nuclear power plant, or in prevention of either resumption of operation or of increase in power output..."

Administration Pursuant to 10 CFR 10.12, the application fee of $150.00 will follow under separate letter.

In accordance with 10 CFR 50.91(b)(1), the State of Ohio is provided with a copy of this license amendment request.

In order to preclude plant shutdown in accordance with the Perry Technical Specifications, and to allow for continued startup testing, it is necessary to amend the Perry TS no later than Friday, February 20, 1987. We therefore, request that this amendment be processed as an emergency request in accordance with 10 CFR 50.91(a)(5).

USNRC February 20, 1987 s PY-CEI/NRR-0595 L q A marked up copy of the Technical Specification page is attached. Should f,'? s you have any questions, please feel free to call me.

U y ,

55 I Very truly yours, y *

, k AW Murray R. Edelman M Senior Vice President Nuclear Group MRE:njc Attachment cc: Jay Silberg, Esq.

l Paul Leech (2)

K. A. Connaughton USNRC, Region III Mr. James W. Harris (State of Ohio) l l

l l