PNP 2018-016, Submittal of 2017 Personnel Exposure and Monitoring Report
| ML18099A003 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 04/02/2018 |
| From: | Hardy J Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Regulatory Research |
| References | |
| PNP 2018-016 | |
| Download: ML18099A003 (1) | |
Text
- =::-Enlergy PNP 2018-016 April 2, 2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager 10 CFR 20.2206(c)
SUBJECT:
2017 Personnel Exposure and Monitoring Report Big Rock Point Dockets 50-155 and 72-043 License No. DPR-6
Dear Sir or Madani:
In accordance with 10 CFR 20.2206(c), Entergy Nuclear Operations, Inc. submitted the occupational exposure data for individuals monitored at Big Rock Point during the 2017 calendar year. The data was submitted electronically on the Radiation Exposure Information and Reporting System (REIRS) web page on March 12, 2018.
This letter contains no new commitments and no revision to existing commitments.
Sincerely, JAH/bed cc:
Administrator, Region III, USNRC Project Manager, Big Rock Point, USNRC