PNP 2017-022, Report of Changes, Tests and Experiments and Summary of Commitment Changes

From kanterella
Jump to navigation Jump to search
Report of Changes, Tests and Experiments and Summary of Commitment Changes
ML17093A071
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 04/01/2017
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
PNP 2017-022
Download: ML17093A071 (1)


Text

~Entergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2017-022 April 1, 2017 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Report of Changes, Tests and Experiments and Summary of Commitment Changes Big Rock Point Dockets 50-155 and 72-043 Facility Operating License No. DPR-6

Dear Sir or Madam:

Entergy Nuclear Operations, Inc. is providing notification that there were no facility changes, tests or experiments performed at Big Rock Point for the period from April 1, 2015, through March 31,2017. This notification is being submitted in accordance with the requirements of 10 CFR 72.48(d)(2) and 10 CFR 50.59(d)(2). In addition, there were no commitment changes made during this period.

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, 94U~

JAH/jse cc: Administrator, Region III, USNRC BRP Decommissioning Inspector, USNRC NMSS Project Manager, USNRC