NTD-18-044, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
(Redirected from NTD-18-044)
Jump to navigation Jump to search
Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations
ML18117A340
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/26/2018
From: Knaide K
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NTD-18-044, RIS 2018-002
Download: ML18117A340 (3)


Text

PSEG Nu cle ar LLC P.O . Box 236, H a n cocks Bridge , Ne w Je rse y 0 8038-0236 0 PSEG NuclearLLC April 26, 2018 NTD-18-044 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354

SUBJECT:

RESPONSE TO RIS 2018-02, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Attached is the completed NRC Form 536, Operator Licensing Examination Data, for Initial Licensed Operator Examinations through Calendar Year (CY) 2023 .

There are no regulatory commitments contained in this letter.

Should there be any questions regarding this matter, please contact Mark Shaffer, Hope Creek Operations Training Manager at (856) 339-1820.

Sincerely, ILJ.--- ~ [lv~

K~ nneth M. Knaide Senior Director - Nuclear Training

USNRC Document Control Desk NTD-18-044 Page 2 cc Mr. Daniel Dorman, Regional Administrator - Region 1, NRC Mr. Donald E. Jackson, Chief, Operations Safety Branch - Region 1 NRC Ms. Carleen Parker, NRC Project Manager - Hope Creek Generating Station Mr. Justin Hawkins, NRC Senior Resident Inspector - Hope Creek Gen. Station (X24)

Mr. Thomas MacEwen - Hope Creek Gen. Station Commitment Coordinator (N21)

Mr. Lee Marabella - Corporate Commitment Coordinator (N21)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~~

  • ,po* ***u,_,~ Estimated burden per response to comply with this volunta,y infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This II ~ OPERATOR LICENSING infonnation collection is used to plan budgets and resources for operator examinations. Send

~ " comments regarding burden estimate to the lnfonnation Seivices Branch (T-2 F43), U.S. Nuclear

~

~ EXAMINATION DATA Regulato,y Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,

"'~,, +Q-!? and to the Desk Officer, Office of lnfonnation and Regulato,y Affairs, NEOB-10202, (3150-0131), Office

          • of Management and Budget, Washington, DC 20503. If a means used to impose an infonnation collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.

FACILITY NRC REGION

!Hope Creek Generating Station 1 11 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY 2021 CY 2022 CY2023 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2020 CY2021 CY2022 CY2023 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 5 5 0 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 7 7 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 2/8/2021 8/8/2022 ALTERNATE DATE 2/15/2021 8/15/2022 NRC FORM 536 (11-2017)

PSEG Nu cle ar LLC P.O . Box 236, H a n cocks Bridge , Ne w Je rse y 0 8038-0236 0 PSEG NuclearLLC April 26, 2018 NTD-18-044 U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354

SUBJECT:

RESPONSE TO RIS 2018-02, PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Attached is the completed NRC Form 536, Operator Licensing Examination Data, for Initial Licensed Operator Examinations through Calendar Year (CY) 2023 .

There are no regulatory commitments contained in this letter.

Should there be any questions regarding this matter, please contact Mark Shaffer, Hope Creek Operations Training Manager at (856) 339-1820.

Sincerely, ILJ.--- ~ [lv~

K~ nneth M. Knaide Senior Director - Nuclear Training

USNRC Document Control Desk NTD-18-044 Page 2 cc Mr. Daniel Dorman, Regional Administrator - Region 1, NRC Mr. Donald E. Jackson, Chief, Operations Safety Branch - Region 1 NRC Ms. Carleen Parker, NRC Project Manager - Hope Creek Generating Station Mr. Justin Hawkins, NRC Senior Resident Inspector - Hope Creek Gen. Station (X24)

Mr. Thomas MacEwen - Hope Creek Gen. Station Commitment Coordinator (N21)

Mr. Lee Marabella - Corporate Commitment Coordinator (N21)

NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)

~~

  • ,po* ***u,_,~ Estimated burden per response to comply with this volunta,y infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This II ~ OPERATOR LICENSING infonnation collection is used to plan budgets and resources for operator examinations. Send

~ " comments regarding burden estimate to the lnfonnation Seivices Branch (T-2 F43), U.S. Nuclear

~

~ EXAMINATION DATA Regulato,y Commission, Washington, DC20555-0001, or by e-mail to lnfocollects.Resource@nrc.gov,

"'~,, +Q-!? and to the Desk Officer, Office of lnfonnation and Regulato,y Affairs, NEOB-10202, (3150-0131), Office

          • of Management and Budget, Washington, DC 20503. If a means used to impose an infonnation collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.

FACILITY NRC REGION

!Hope Creek Generating Station 1 11 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2020 CY 2021 CY 2022 CY2023 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2020 CY2021 CY2022 CY2023 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 5 5 0 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 7 7 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 2/8/2021 8/8/2022 ALTERNATE DATE 2/15/2021 8/15/2022 NRC FORM 536 (11-2017)