0609H-01 INTRODUCTION

Core damage accidents that lead to large, unmitigated releases from containment in a time

frame prior to effective evacuation of the close-in population have the potential to cause early

health effects, e.g. prompt fatalities. The frequency of all accidents of this type is called the large

early release frequency (LERF) as described in Regulatory Guide 1.174 (reference 1). Such

accidents include unscrubbed releases associated with early containment failure at or shortly

after reactor vessel breach, containment bypass events, and loss of containment isolation.

The relationship of LERF thresholds to core damage frequency (CDF) thresholds found in

Regulatory Guide 1.174 provides the basis for the risk significant characterizations found in

Table 1.1 below. The LERF based approach is one order of magnitude more stringent than the

CDF based approach. Therefore, it may be necessary under some circumstances to

characterize the risk significance of an inspection finding using the LERF based approach. The

purpose of this appendix to provide guidance for assessing the impact of inspection findings in

relation to the containment barrier cornerstone of safety. The basis for the guidance presented

in this appendix is discussed in IMC 0308, Reactor Oversight Process (ROP) Basis Document.

Table 1.1 Risk Significance Based on ΔLERF vs ΔCDF

Frequency Range/ry SDP Based on ΔCDF SDP Based on ΔLERF

≥ 10-4 Red Red

< 10-4–10-5 Yellow Red

< 10-5–10-6 White Yellow

< 10-6–10-7 Green White

<10-7 Green Green

The significance determination process (SDP) assigns a risk characterization to inspection

findings based on LERF considerations. This process is designed to interface directly with the

SDP for Type A findings, derived from IMC 0609, Appendix A (at power) and Appendix G

(shutdown), that are important LERF contributors. In addition, the guidance addresses findings

related to structures, systems, and components (SSCs) that do not influence CDF

determinations but can impact the containment function (i.e., Type B findings). It is

recommended that inspectors, working with senior reactor analysts (SRAs) as needed, evaluate

both Type A and Type B findings for at power findings. It is further recommended that SRAs

evaluate both Type A and Type B findings for shutdown.

Note: Type A and Type B findings are defined in section 03.02 Definitions.

01.01 Applicability

The guidance in this SDP is designed to provide NRC inspectors, SRAs and NRC management

with a simple probabilistic risk framework for use in identifying which findings are potentially risksignificant from a LERF perspective. Appendix H also helps facilitate communication of the

basis for significance between the NRC and licensees. In addition, it identifies findings that do

not warrant further NRC engagement, due to very low risk significance, given the findings are

entered into the licensee’s corrective action program.

01.02 Entry Conditions

The entry conditions for the containment integrity SDP described in this document are related

to:

• Findings evaluated under IMC 0609 Appendix A (at power) or Appendix G (shutdown)

that potentially increase LERF. or

• Degraded conditions affecting containment barrier integrity (that can potentially increase

LERF without affecting CDF).

Appendix H provides simplified risk-informed guidance for estimating the increase in LERF

associated with inspection findings related to deficient licensee performance during full power

(see IMC 0609, Appendix A) and shutdown operations (see IMC 0609, Appendix G).

01.03 Appendix H Outline

The guidance presented in this appendix is based on a number of assumptions and modeling

approximations. Section 02 presents the limitations and precautions that must be considered

when evaluating inspection findings. Abbreviations and definitions used in this appendix are

presented in Section 03. Section 04 is an overview of the approach and the procedure.

Section 05 describes consequential steam generator tube ruptures (C-SGTR). Section 06

presents the procedure for analyzing those findings that have an impact on CDF (i.e., Type A

findings) and Section 07 presents the procedure for analyzing those findings that only impact

the containment function (i.e., Type B findings). Findings related to power operation and findings

related to shutdown operations are both addressed.

01.04 Use of SAPHIRE Software to Calculate LERF

Although this manual chapter provides the methods to estimate LERF manually, LERF can now

be calculated automatically with Systems Analysis Programs for Hands-on Integrated Reliability

Evaluations (SAPHIRE) software. The LERF assessment factors for Type A LERF findings have

now been programmed into all standardized plant analysis risk (SPAR) models for all plants

using global linkage rules.

The use of SAPHIRE to calculate LERF for Type A findings is the preferred method since it

eliminates the need to manually list sequences and sum them using the worksheets and

methods in this manual chapter. SAPHIRE can also provide values for LERF in Type A findings

using the SDP analysis tool. It is important to note, however, that even the SAPHIRE results will

produce a Phase 2 Initial Risk Significance Approximation and further refinement might be

appropriate.

01.05 Use of Licensee Models for LERF

If provided, LERF risk insights from the licensee risk model can be a source of risk information.

The SRA should determine if the PRA model in question is capable of adequately evaluating the

risk associated with the finding (e.g., licensee PRA may not model C-SGTR or type B findings).

Any evaluation using licensee provided information should be done by an SRA during the

detailed risk evaluation.

0609H-02 LIMITATIONS AND PRECAUTIONS

Appendix H generates a reasonably conservative, order-of-magnitude assessment of the risk

significance of inspection findings. The intent of Appendix H is to provide guidance for NRC

inspectors to easily obtain a quick assessment of risk significance. If appropriate, a more

detailed assessment may be performed in a SDP Phase 3 evaluation.

The approach in this appendix has numerous assumptions and limitations which include the

following:

• This revision incorporates the AP1000 reactor design into Appendix H. Since this is a

new reactor design that hasn’t been previously assessed by the SDP, if an analyst has a

basis for why this procedure is not adequately capturing the risk, they may depart from

this procedure and perform a Phase 3 detailed risk evaluation.

• Since this SDP is focused on LERF, i.e., early fatality risk, long-term risk effects such as

population dose and latent cancer fatalities are not addressed in this guidance. In

addition, long term accident sequences that involve failure of containment heat removal

and ultimately progress to containment failure, e.g., loss of containment heat removal

sequences in BWRs, are assumed not to contribute to LERF. It is assumed that

effective emergency response actions can be taken within the long time frame of these

accident sequences.

• For the evaluation of risk significance during shutdown, only the period within eight days

of the beginning of the outage is considered. After eight days, it is assumed that the

short-lived, volatile isotopes that are principally responsible for early health effects have

decayed sufficiently such that the finding would not contribute to LERF. In addition, all

core damage sequences are considered as candidate LERF sequences, because there

is greater variability regarding when evacuation would begin.

LERF determinations depend on the containment design, plant specific attributes and

features, which have considerable variability.

• It was conservatively assumed for all interfacing system loss-of-coolant-accidents

(ISLOCAs) that the path outside containment is not submerged, nor does it benefit from

other means of fission product retention (i.e. the release is not scrubbed).

• It was conservatively assumed for all steam generator tube ruptures (SGTRs) that the

secondary side is open so that a path outside containment exists and the release is not

scrubbed.

• For those findings that impact the containment function (i.e., Type B findings), baseline

CDFs for full power were assumed in order to simplify the calculation of the change in

risk. The baseline CDFs for full power assumed were10-4

/ry for PWRs,10-5

/ry for BWRs,

and 10

-6

/ry for AP1000 plants.

• It was assumed, conservatively, that a main steam isolation valve (MSIV) leakage rate in

excess of 10,000 scfh in BWRs (reference 2) with Mark I and Mark II containments is

significant to LERF.

Issue Date: 03/23/20 4 0609, App. H

0609H-03 ABBREVIATIONS AND DEFINITIONS

03.01 Abbreviations

ADS Automatic Depressurization System (AP1000)

ATWS Anticipated Transient Without Scram

CAP Corrective Action Program

CCFP Conditional Containment Failure Probability

CCW Component Cooling Water

CD Core Damage

CDF Core Damage Frequency

CE Combustion Engineering

C-SGTR Consequential Steam Generator Tube Rupture

DF Decontamination Factor

DHR Decay Heat Removal

ECCS Emergency Core Cooling System

IMC Inspection Manual Chapter

LER Licensee Event Report

LERF Large Early Release Frequency

LOIA Loss of Instrument Air Initiator

LOOP Loss of Offsite Power

LORHR Loss of RHR Initiating Event

LOSW Loss of Service Water Initiator

LTOP Low Temperature Over Pressure Events

POS Plant Operating State

PRA Probabilistic Risk Assessment

PRHR Passive Residual Heat Removal System (AP1000)

RCS Reactor Coolant System

RHR Residual Heat Removal

ROP Reactor Oversight Process

RPV Reactor Pressure Vessel

SCFH Standard Cubic Feet per Hour

SDP Significance Determination Process

SG Steam Generator

SGTR Steam Generator Tube Rupture

SPAR Standardized Plant Analysis Risk

SSC Structure, System, or Component

TS Technical Specifications

TW Time Window

TW-E Early Time Window, before refueling operation

TW-L Late Time Window, after refueling operation

03.02 Definitions

LERF: The frequency of those accidents leading to significant, unmitigated releases from

containment in a time frame prior to effective evacuation of the close-in population such that

there is a potential for early health effects.

Close-in population: The population living or transiting within one mile of the reactor site

boundary. This also includes nonessential plant personnel being evacuated from the site, any

temporary population or local workforce, and any population that may be transiting through the

area. Per the Commission’s Safety Goal Policy if there are no individuals residing within a mile

of the plant boundary, an individual for evaluation purposes, should be assumed to reside 1 mile

from the site boundary.

Effective Evacuation: A set of actions by the licensee and local authorities that results in

reasonable assumption that the close-in population has been evacuated. This does not require

verification or certainty that every individual has left the area, only that all reasonable efforts

have been completed and the population has had time to leave the area.

Definitions related to shutdown plant conditions can be found in IMC 0609, Appendix G,

Shutdown Operations Significance Determination Process.

Appendix H Phases of Significance Determination:

• Phase 1 - Characterization and Initial Screening of Findings: Precise characterization of

the finding and an initial screening of very low-significance findings for disposition by the

licensee’s corrective action program.

• Phase 2 - Initial Risk Significance Approximation and Basis: Initial approximation of the

risk significance of the finding and development of the basis for this determination for

those findings that are not screened out in Phase 1 screening.

• Phase 3 - Risk Significance Finalization and Justification: Also known as a detailed risk

evaluation, this is a review and as-needed refinement of the risk significance estimation

results from Phase 2, or development of any risk analysis outside of this guidance, by an

NRC risk analyst (any departure from the guidance provided in this document constitutes

a Phase 3 analysis and must be performed by an NRC risk analyst or SRA).

0609H-04 OVERVIEW OF THE APPROACH AND PROCEDURE FOR SIGNIFICANCE DETERMINATION

The guidance described in this section provides an assignment of a significance level (color) to

inspection findings based on LERF considerations. This guidance considers findings resulting

from deficient licensee performance during full power operations as well as shutdown

operations. In Section 04.01, two distinct types of inspection findings that can potentially affect

LERF are defined. Section 04.02 provides details of the overall approach taken to the

assessment of their significance.

04.01 Types of Findings

An inspection finding associated with a licensee performance deficiency during full power or

shutdown operations is characterized by its potential impact on SSCs, by an estimate of the

duration of this degradation, and by other information needed to assess the impact on accident

likelihood or barrier cornerstone. Two types of findings are encountered:

Type A Findings:

Type A findings can influence the likelihood of accidents leading to core damage that are also

identified as contributors to LERF. Such a finding will already have been processed using

Appendix A of IMC 0609 for findings at full power, or IMC 0609 Appendix G for findings related

to shutdown operations to determine their contributions to ΔCDF.

Type B Findings:

Type B findings are related to a degraded condition that has potentially important implications

for the integrity of the containment, without affecting the likelihood of core damage. Table 4.1

shows a list of SSCs (associated with maintaining containment integrity in different containment

types). The LERF significance of these SSCs is also addressed in the table.

04.02 LERF Based Significance Determination Process

Figure 4.1 describes the process flow of typical inspection findings. Findings processed through

a CDF based SDP will be processed for potential ∆LERF contribution as Type A findings.

Findings that only impact the containment function without affected core damage sequences will

be processed as Type B findings.

Type A Findings:

For type A findings, the CDF based SDP guidance is used to determine the risk significance

based on ΔCDF. If the total ΔCDF for the finding is less than 1E-7 per reactor year, then the

finding should be assigned a Green significance level.

If the total ΔCDF ≥ 1E-7 per reactor-year, then a screening is conducted using LERF screening

criteria to assess whether any of the core damage sequences affected by the finding are

potential LERF contributors. If none of the sequences is a LERF contributor there is no

increase in risk and the risk significance based on ΔCDF applies. If one or more of the affected

sequences is identified as a LERF contributor, an assessment is performed to estimate ΔLERF

and determine the increase in risk significance based on LERF considerations as discussed in

detail in Section 05.

Type B Findings:

Type B findings have no impact on the determination of ΔCDF and therefore will not have been

processed through the CDF based SDP. These findings, however, are potentially important to

ΔLERF contribution and have to be allocated an appropriate risk category based on LERF

considerations. As shown in Figure 4.1, an initial screening is conducted to determine if a

finding is related to a containment SSC (see Table 4.1) or containment status that has an

impact on LERF. If the answer is NO, the finding is Green. If the answer is YES, an

assessment of the risk significance is performed using guidance provided in Section 06.

Table 4.1 Containment-Related SSCs Considered for LERF Implications1

SSC LERF Significance

Containment penetration seals:

BWR Mark I and II drywell or PWR

containment

BWR Mark III wetwell

Failure of penetration seals that form a barrier

between the containment and the environment

can be important to LERF

Containment isolation valves in lines:

– connecting BWR drywell or PWR

containment airspace to environment

Large lines connecting containment airspace to

environment (e.g., vent/purge) can contribute to

LERF

– connecting RCS to environment or open

systems outside containment

Small lines (< 1–2 inch diameter) and lines

connecting to closed systems would not

generally contribute to LERF

– connected to closed systems

inside/outside containment

Isolation valves connecting to RCS can

contribute to ISLOCA

Main steam isolation valves Excessive MSIV leakage can contribute to

LERF in high pressure accident sequences in

BWR Mark I and II plants

BWR drywell/containment sprays Mark I and II drywell sprays and Mark III

containment sprays are important to preventing

liner melt-through and mitigating suppression

pool bypass

Containment flooding system(s) Important to preventing liner melt-through in

Mark I’s

PWR containment sprays and fan coolers Impact late containment failure and source

terms, but not LERF

1 Some of the listed SSCs could affect the core damage frequency as well as LERF.

Issue Date: 03/23/20 8 0609, App. H

Table 4.1 Containment-Related SSCs Considered for LERF Implications1

SSC LERF Significance

Hydrogen control system

– igniters Important to LERF in Mark III and ice condenser

plants

For AP1000, a significant loss of function of

hydrogen igniters should be assessed for LERF

impacts (e.g., diffusion flames, deflagration-todetonate transition) until more experience with

that containment type is gained

– air return fans and hydrogen mixing

systems

Not essential to hydrogen control if igniters are

available

Suppression pool (SP) systems

– components important to SP

integrity/scrubbing (e.g., vacuum

breakers)

Important to LERF in all BWR plants

– suppression pool cooling Impacts late containment failure but not LERF

Ice condenser system

– ice condenser doors and ice bed Significant flow blockage can be important to

LERF

– air return fans Not important to LERF (similar to containment

sprays)

– ice mass air return fans Deviations in weight of ice not important to

LERF

– foreign objects in ice compartment Not important to LERF (unless CDF is affected)

Filtration systems

Standby Gas Treatment System

– control room ventilation

Not important to LERF due to unavailability in

dominant sequences (e.g., SBO), plugging from

high aerosol loadings in severe accident, and

other considerations

Spent fuel assemblies (individual)

– fuel handling accidents within pool

– fuel handling accidents outside pool

Not important to LERF due to small fission

product inventory contained in single fuel

bundle. Scrubbing by water in the spent fuel

pool further reduces releases.

Issue Date: 03/23/20 9 0609, App. H

Table 4.1 Containment-Related SSCs Considered for LERF Implications1

SSC LERF Significance

ADS system (AP1000) The capability to depressurize the RCS in a

high-pressure transient mitigates the

consequences of having high RCS pressure

during melt progression and vessel rupture.

Such accidents have a potential to fail the

steam generator tubes or to lead to energetic

phenomena at the time of vessel rupture that

can challenge containment.

Operation of ADS stage 4 provides a vent path

for the severe accident hydrogen to the steam

generator compartments, bypassing the IRWST,

and mitigating the conditions required to

produce a diffifusion flame near the containment

wall.

Figure 4.1 LER-based Significance Determination Process

0609H-05 CONSEQUENTIAL STEAM GENERATOR TUBE RUPTURE (C-SGTR)

Consequential Steam Generator Tube Rupture (C-SGTR) is an event in which steam generator

tubes leak or fail as a consequence of the high differential pressure or elevated temperatures

during accident conditions.

The main accident scenarios of interest for C-SGTR are those that lead to core damage with

high reactor pressure, dry steam generator, and low steam generator pressure (High-Dry-Low

or HDL) conditions. A typical example of such an accident scenario is a station blackout with

loss of auxiliary feedwater. Though other situations can lead to the potential for C-SGTR (e.g.,

over-pressure from ATWS, a large main steam line break, deliberate action to isolate feed to a

faulted steam generator), these other sources are generally understood to be lower contributors

to LERF. All of these situations are distinct from SGTR as an initiating event, which should

continue to be treated as described elsewhere in this appendix.

NUREG-2195 concluded that the overall contribution of C-SGTR scenarios to containment

bypass is about a factor of 10 larger for CE plants than Westinghouse plants2

. Since C-SGTR is

expected to contribute no more than 1-2% additional LERF for a typical Westinghouse plant, it is

on par with other sources of LERF for these plants. Conversely, C-SGTR has the potential to be

a much more significant contributor to LERF for CE plants, depending on the nature of the

finding and its impact on the risk evaluation.

Therefore, findings that could significantly influence the likelihood of having high RCS pressure

during core damage or that involve the reliability of feedwater for a CE plant should be

evaluated for potential LERF findings from C-SGTR. The RASP Handbook provides the

technical basis and a simplified worksheet to estimate LERF resulting from a C-SGTR.

Westinghouse plants can also experience C-SGTR but since the potential for it becoming a

significant LERF contributor is lower, Appendix H does not require Westinghouse plants to be

screened for C-SGTR.

05.01 Evaluation of C-SGTR in AP1000 Reactors

For AP1000 reactors, conditions that may significantly affect the conditional probability of having

a consequential (a.k.a., severe accident-induced) steam generator tube rupture should not be

screened out. Generally, such conditions would involve an increase in the likelihood of accident

sequences associated with the onset of core damage at high pressure, coincident with one or

more steam generators having boiled dry. Such instances may include station blackout or

transients with failure to depressurize the RCS (e.g., due to ADS and PRHR failures). For

accident sequences when core damage occurs with high RCS pressure, a dry SG, and low

secondary side pressure, it is likely that full-loop natural circulation conditions will develop,

leading to creep damage to both the RCS piping (hot leg and surge line nozzles) and steam

generator tubes. The order and timing of failure of these components dictates whether LERF is

a concern. These accident sequences could have a greater contribution to LERF, similar to the

2 Two of the primary factors driving this difference are hot leg diameter and steam generator inlet plenum

design. CE plants tend to have larger hot legs that connect to the steam generator closer to the tube

sheet, along with flat-bottomed steam generator inlet plenums. Westinghouse plants tend to have smaller

hot legs that connect lower in the steam generator inlet plenum, along with rounded-bottom steam

generator inlet plenums. These design features tend to dictate the degree of mixing in the inlet plenum

under high-dry-low conditions, resulting in a greater challenge to the tubes in the design typical of CE

plants.

other containment bypass events that have been screened in (e.g., ISLOCA). AP1000 is not

subject to loop seal blockage conditions that can tend to mitigate the threat to SG tubes for

other Westinghouse designs, though it is estimated to be less likely to incur such accident

sequences to begin with. Additional experience with C-SGTR modeling for AP1000 design is

necessary before these findings can be more efficiently screened.

0609H-06 PROCEDURE FOR TYPE A FINDINGS

The CDF-based SDPs (Appendix A and Appendix G to IMC-0609) provide guidance for

assessment of the significance of findings that impact CDF. This leads to identification of CDF

sequences associated with each finding, evaluation of the increase in frequency of each of the

contributing sequences, and determination of the finding significance to ΔCDF based on all

contributing sequences collectively.

Evaluation of the impact of the finding on LERF for these sequences is addressed using this

appendix. Section 06.01 presents the procedure for Type A findings at full power, and Section

06.02 presents the procedure for Type A findings at shutdown.

06.01 Approach for Assessing Type A Findings at Power

This section provides the step-by-step process (as shown in Figure 6.1) for assessing the risk

significance with respect to LERF of Type A findings at full power. As a reminder, SAPHIRE can

also be used to calculate LERF of Type A findings, and is the preferred method.

STEP 1 – Finding Characterization

Determine the total ΔCDF of the finding and identify the associated CDF sequences which may

be LERF contributors.

Step 2 – Accident Sequence Screening

Generally, only a subset of those sequences contributing to CDF significance of a finding has

the potential to impact LERF. A more detailed discussion of these sequences for each

containment type is provided in IMC 0308, and briefly summarized below.

BWRs

• For BWR Mark I and Mark II plants, findings related to ISLOCA, ATWS, and accidents

with high RCS pressure (i.e., transients and small break LOCA).

• For BWR Mark I plants, accidents that involve a dry drywell floor at vessel breach

regardless of whether the RCS is at low or high pressure also need to be evaluated in

Phase 2 as indicated in Note 3 to Table 6.1.

• For BWR Mark III plants, findings related to ISLOCA, transients, small break LOCAs,

and station blackout (SBO) categories.

PWRs

• For PWR plants with large dry and sub-atmospheric containments, as well as AP1000,

findings related to the accident categories ISLOCA and SGTR. Certain accident

sequences that lead to core damage with high reactor pressure, dry steam generator,

Issue Date: 03/23/20 12 0609, App. H

and low steam generator pressure (High-Dry-Low or HDL) conditions can lead to a

consequential steam generator tube rupture (C-SGTR). A typical example of such an

accident scenario in an exsting PWR reactor, is a station blackout with a loss of auxiliary

feedwater. A typical example of such an accident scenario for an AP-1000 reactor

would be a station blackout or transients with failure to depressurize the RCS (e.g., due

to ADS and PRHR failures). Though other situations can lead to the potential for CSGTR (e.g. over-pressure from ATWS, a large main steam line break, (deliberate action

to isolate feed to a faulted steam generator), these other sources are generally

understood to be lower contibutors to LERF. A C-SGTR is more of a concern for

Combustion Engineering (CE) plants. Consult the Risk Assessment for Operational

Events (RASP) Manual Volume 5 for more information.

• For the PWR plants with ice condenser containments, findings related to ISLOCA,

SGTR, and SBO accident categories.

Issue Date: 03/23/20 13 0609, App. H

Figure 6.1 Road Map for LERF-based Risk Significance Evaluation for Type A Findings at

Power

Use Table 6.2 to

Identify LERF

Factors

Use Table 6.2 to

Identify LERF

Factors Use Worksheet

Table 6.3

Use Worksheet

Table 6.3

Use Table 6.1

None of the

Sequences

Important to

LERF?

Use Table 6.1

None of the

Sequences

Important to

LERF?

Issue Date: 03/23/20 14 0609, App. H

Accident categories that are screened out in Phase 1 include:

LOOPs with successful emergency AC power operation (non-SBO events).

LOOPs with failure of emergency AC power in which power is recovered prior to core

damage.

In general, sequences with late core damage (i.e., sequences that proceed to core damage due

to loss of containment heat removal) will not contribute to LERF. Other sequences that are

screened out are summarized below. When screening out these events for PWR’s use caution

not to overlook High-Dry-Low sequences which could result in a C-SGTR that would be

significant for LERF.

BWRs

ATWS sequences are not important contributors to LERF for BWRs with Mark III

containment. Containment failure from ATWS sequences occurs due to gradual overpressurization of containment prior to core damage. However, these sequences leave

the drywell and suppression pool intact, hence the releases are scrubbed and a large

early release does not occur.

PWRs

ATWS sequences are usually not significant contributors to LERF for PWRs. During a

PWR ATWS, containment pressure increases slowly and is therefore a late failure mode.

The risk significance determined by the CDF based SDP for ATWS events in PWRs is

sufficient. An exception to this would be an ATWS sequence coincident with a loss of

feed that could lead to a C-SGTR.

• High and low pressure core damage sequences (in which the containment is not

bypassed) are not significant contributors to LERF for PWRs with large dry and subatmospheric containments. An important insight from the IPE program and other PRAs

is that the conditional probability of early containment failure is less than 0.1 for core

damage accident scenarios that leave the RCS at high pressure. If the RCS is

depressurized, the probability of early containment failure is less than 0.01.

• In PWRs with ice condenser containments, severe accident studies indicate that the

most significant factor is the availability of hydrogen igniters and the ice condenser to

mitigate severe accidents. If the igniters are available (i.e., non-SBO accidents), the

conditional early containment failure probability is less than 0.1 even during accidents

that leave the RCS at high pressure.

Step 2.1

If the total ΔCDF (i.e., sum of all sequences) is <1E-7 per year, the LERF significance is Green

and further LERF-related evaluation is not needed. Otherwise, proceed to Step 2.2.

Step 2.2

Compare the attributes of all core damage sequences with a ΔCDF of ≥1E-8 per year with those

in Table 6.1 to identify those sequences which have the potential to affect LERF. Individual

sequence results that are <1E-8 are not significant and are not evaluated further. However,

those LERF sequences that are ≥1E-8 (sequence result of 8 or less) are evaluated for the

Issue Date: 03/23/20 15 0609, App. H

overall LERF contribution. If none of the sequences impacts LERF, the risk significance

obtained from the ΔCDF assessment is used for the significance of the finding and no further

LERF-related evaluation is necessary. If ΔCDF sequences are identified as having the potential

to affect LERF3

, proceed to Step 3.

Step 3 – Phase 2 Assessment

For sequences needing Phase 2 analysis, risk significance determination is performed using the

following two substeps:

Step 3.1 – LERF Factor Determination

Identify the LERF factor associated with each of the sequences remaining after screening using

Table 6.2. Document these sequences and their associated LERF factors as discussed in the

next substep.

Step 3.2 – ∆LERF Significance Evaluation

Document details of LERF significance assessment using the LERF worksheet (Table 6.3). List

each sequence assessed in Phase 2 in column 1 together with its CDF score (in column 2).

Document the sequence attributes that make it a potential LERF contributor (e.g. high RCS

pressure, drywell floor status for BWRs, etc.) in column 3.

Document the LERF factor (see Step 3.1) in column 4.

Document the LERF score in column 5. The LERF score is calculated by multiplying the ΔCDF

score (column 2) by the LERF factor (column 4). For example, if a sequence has a ΔCDF score

of 7 (i.e., 1E-7) and the associated LERF factors is 0.4, the LERF score is 4×10-8

.

Step 4 – LERF Significance

Sum the scores for all of the LERF contributing sequences associated with the finding and enter

the total ΔLERF score in the space below Column 5. Use the numerical result to determine the

ΔLERF significance (color), using Table 1.1.

Step 5 – Finding Significance

Compare the CDF significance (color) with that for the LERF significance for the same finding.

The higher (color) is the preliminary risk significance of the finding.

3No extra credit should be given for Severe Accident Management operator recovery actions (e.g., actions

to depressurize the RCS or to flood Mark I drywell) unless recovery is explicitly modeled in the CDF sequence. Defer

such recovery credit to Phase 3 assessment if needed.

Issue Date: 03/23/20 16 0609, App. H

Table 6.1 Phase 1 Screening-Type A Findings at Full Power

Reactor

Type

Containment

Type

Attributes of Accident Sequence Related to Finding

ISLOCA SGTR ATWS SBO

(Note 1)

High RCS

Pressure

(Note 2)

All Others

BWR Mark I Perform

Phase 2

Not

Applicable

Perform

Phase 2

Perform

Phase 2

Perform

Phase 2

Note 3

BWR Mark II Perform

Phase 2

Not

Applicable

Perform

Phase 2

Perform

Phase 2

Perform

Phase 2

Screen Out

(Note 4)

BWR Mark III Perform

Phase 2

Not

Applicable

Screen Out

(Note 4)

Perform

Phase 2

Perform

Phase 2

creen Out

(Note 4)

PWR Large Dry and

SubAtmospheric

Perform

Phase 2

Perform

Phase 2

Screen Out

(Note 4)

Screen Out

(Note 4)

Screen Out

(Note 4)

Screen Out

(Note 4)

PWR Combustion

Engineering

Plants

Perform

Phase 2

Perform

Phase 2

(Note 5) (Note 5) (Note 5) (Note 5)

PWR Ice Condenser Perform

Phase 2

Perform

Phase 2

Screen Out

(Note 4)

Perform

Phase 2

Screen Out

(Note 4)

Screen Out

(Note 4)

PWR AP1000 Perform

Phase 2

Perform

Phase 2

Screen Out

(Note 5)

Screen Out

(Note 5)

Screen Out

(Note 5)

Screen Out

(Note 5)

Note 1: SBO is defined as a LOOP sequence with loss of emergency AC and failure to recover AC power.

Note 2: High pressure is defined as greater than 250psi at the time of reactor vessel breach. Transients and

small break LOCAs (smaller than about 2-inch equivalent break size in BWRs and 0.75 - 1 inch in PWRs)

will usually result in pressures in the RCS greater than 250psi at the time of reactor vessel melt-through in

the absence of manual depressurization.

Consider a Sequence to be low pressure in case of:

• Large or intermediate LOCA

• Sequences that include successful depressurization (DEP)

• Availability of low pressure injection (LPI) is questioned on sequence branch

Consider a sequence to be high pressure in case of:

• The sequence includes failure of depressurization (DEP)

• None of the low pressure considerations identified above apply

Note 3: A phase 2 assessment should be performed for any sequences that are expected to proceed to reactor

vessel breach into a dry reactor cavity. Therefore, all other transients with successful RCS

depressurization should be assessed. Sequences involving LOCAs in the drywell or drywell spray

operation are excluded because they result in a flooded drywell floor. LOCAs involving stuck open relief

valve sequences do not result in flooded drywell.

Note 4: Screen out means that the accident sequence related to the finding is not significant to LERF and is

Green.

Note 5: CE plants should be screened for C-SGTR. Refer to the RASP Manual Volume 5 for more information.

AP1000 should be screened for C-SGTR only if conditions described in section 05.01 are met.

Issue Date: 03/23/20 17 0609, App. H

Table 6.2 Phase 2 Assessment Factors -Type A Findings at Power

Reactor

Type

Containment

Type

Attributes of Accident Sequence Related to Finding

ISLOCA SGTR ATWS SBO

(Note 1)

High RCS

Pressure

(Note 2)

Low RCS

Pressure

(Note 2)

BWR Mark I 1.0 Not

Applicable 0.3 (Note 3)

0.6

If drywell is

Flooded

<0.1

If drywell is

Flooded

1.0

If drywell is

Dry

1.0

If drywell is

Dry

BWR Mark II 1.0 Not

Applicable 0.4 (Note 4) 0.3 Screen Out in

Phase 1

BWR Mark III 1.0 Not

Applicable

Screen

Out in

Phase 1

0.2 0.2 Screen Out in

Phase 1

PWR Large Dry and

Sub-Atmospheric 1.0 1.0

Screen

Out in

Phase 1

Screen

Out in

Phase 1

Screen Out

in Phase 1

Screen Out in

Phase 1

PWR AP1000 1.0 1.0

Screen

Out in

Phase 1

Screen

Out in

Phase 1

Screen Out

in Phase 1

Screen Out in

Phase 1

PWR Ice Condenser 1.0 1.0

Screen

Out in

Phase 1

1.0 Screen Out

in Phase 1

Screen Out in

Phase 1

Note 1: SBO is defined as a LOOP sequence with loss of emergency AC and failure to recover AC power.

Note 2: High pressure is defined as greater than 250psi at the time of reactor vessel breach. Transients and small

break LOCAs (smaller than about 2-inch equivalent break size in BWRs and 0.75–1 inch in PWRs) will

usually result in pressures in the RCS greater than 250psi at the time of reactor vessel melt- through in

the absence of manual depressurization.

Note 3: If the RCS is at high pressure during the SBO then the Factors for the high pressure column apply. If the

RCS is at low pressure during the SBO, the factors for the low pressure column apply.

Note 4: If the RCS is at high pressure during the SBO then the Factor is 0.3. If the RCS is at low pressure during

the SBO, the finding can be screened out.

Issue Date: 03/23/20 18 0609, App. H

Table 6.3 Manual Worksheet for ΔLERF

(1)

Sequences

(2)

ΔCDF Score

(X)

(3)

Sequence

Attributes

(4)

LERF Factor

(Table 6.2 for

power, Table 6.4

for shutdown)

(F)

(5)

ΔLERF

Score

F * (1x10-X

)

Total ΔLERF Score

Issue Date: 03/23/20 19 0609, App. H

06.02 Approach for Assessing Type A Findings During Shutdown

This section provides a step-by-step process (shown in Figure 6.2) for assessing the risk

significance with respect to LERF of Type A findings applicable to shutdown operation.

STEP 1 – Finding Characterization

Step 1.1

Review the assessment performed using IMC 0609, Appendix G, to identify the sequences

affected by the finding, and the POSs and time windows (TWs) applicable to the finding.

Step 1.2

Determine the status of containment when the finding occurred for each POS and TW:

For PWRs and BWR Mark IIIs, the status of containment is either open or intact.

For BWRs Mark I and IIs, the status of containment is either intact, de-inerted, or open.

STEP 2 – Accident Sequence Screening

Step 2.1

For each shutdown core damage scenario identified in Step 1, determine if the following

conditions were met:

• The finding occurred while the plant was in POS 1E or POS 2E.

• The finding occurred within the first eight days of the outage.

Step 2.2

If both conditions in Step 2.1 were met, go to Step 3. Otherwise, the LERF significance is

Green and further evaluation for LERF implications is not needed.

STEP 3 – Phase 2 Assessment

For sequences needing Phase 2 analysis, risk significance determination is performed using the

following two substeps:

Step 3.1

Determine the LERF factor for each core damage scenario affected by the finding for the

appropriate containment status using Table 6.4.

Issue Date: 03/23/20 20 0609, App. H

Step 3.2

Document details of LERF significance assessment for the finding being evaluated using the

LERF worksheet (Table 6.3). List each sequence assessed in Phase 2 in column 1 together

with its CDF score (in column 2). Since all core damage sequences are potential LERF

contributors, column 3 may be left blank. Document the LERF factor (see Step 3.1) in

column 4. Document the LERF score in column 5. The LERF score is calculated by multiplying

the ΔCDF score (column 2) by the LERF factor (column 4). For example, if a sequence has a

ΔCDF score of 7 and the associated LERF factor is 0.2, the LERF score is 2×10-8

.

STEP 4 – LERF Significance

Sum the scores for all of the LERF contributing sequences associated with the finding being

evaluated and enter the total ΔLERF score in the space below column 5 of the completed

Table 6.3. Use the numerical result to determine the ΔLERF significance (color), using

Table 1.1.

STEP 5 – Finding Significance

Compare the CDF significance (color) with that for the LERF significance for the same finding.

The higher (color) is the preliminary risk significance of the finding.

Issue Date: 03/23/20 21 0609, App. H

Figure 6.2 Road Map for LERF-based Risk Significance Evaluation for Type A Findings at

Shutdown

Use Table 6.3

Worksheet

Use Table 6.3

Worksheet

Use Table 6.4 for

LERF Factors

Use Table 6.4 for

LERF Factors

Issue Date: 03/23/20 22 0609, App. H

Table 6.4 Phase 2 Assessment Factors -Type A Findings at Shutdown

Reactor/

Containment Type

Containment

Status

(Note 1)

Accident Sequence Related to Finding

Finding occurs: (1) in POS 1E

or POS 2E within first 8 days

of outage.

All Others

BWR Mark I and II De-inerted 1.0 Screened Out

BWR Mark III Intact

0.2 – if igniters are not available

(Note 2)

Screen Out – Screened Out if igniters are

available

(Note 3)

PWR Large Dry and

Sub-Atmospheric Intact Screen Out (Note 3) Screened Out

AP1000 Intact Screen Out (Note 3) Screened Out

Ice Condenser Intact

1.0 – if igniters are not available

(Note 2)

Screen Out – Screened Out if igniters are

available

(Note 2 and Note 3)

All Open 1.0 Screened Out

Note 1: An intact containment is one in which, the licensee intends to: (1) close all containment penetrations with a

single barrier or can be closed in time to control the release of radioactive material, and (2) maintain the

containment differential pressure capability necessary to stay intact following a severe accident at

shutdown. When the RCS is open, an intact containment means that containment can be re-closed prior to

boiling the RCS inventory. If the licensee does not intend to maintain an intact containment, then

containment is open.

A de-inerted containment is one in which limits on the primary containment oxygen concentration as

defined in TS are no longer met.

Note 2: There are no TS for igniters to be operable during shutdown. However, it is possible that igniters could be

recovered by operator action, in which case the finding could be screened out (i.e. not significant to LERF)

Note 3: To screen out the finding, the analyst must verify that the licensee’s plans for containment closure

consider: 1) time to boiling given a loss of RCS inventory which shortens time to boiling compared to a

loss of the operating train of RHR. (NOTE: selecting time to boiling based on RCS level at the bottom of

the hot leg should always meet the recommendation) and (2) a potential loss of offsite power and a loss of

all vital AC power.

Issue Date: 03/23/20 23 0609, App. H

0609H-07 PROCEDURE FOR TYPE B FINDINGS

Type B findings have no direct impact on the likelihood of core damage but have potentially

important implications for containment integrity. This section provides the procedure for

evaluation of LERF significance of Type B findings. Similar to the Type A findings approach, a

step wise process (Figure 7.1) is used, which leads to a conservative estimate of LERF

significance. Section 07.01 presents the procedure for findings at full power, and Section 07.02

for findings at shutdown.

07.01 Approach for Assessing Type B Findings at Power

STEP 1 – Finding Characterization

Characterize the finding in terms of its relationship to the containment barrier function. Collect

information needed for significance determination: SSCs affected and the nature of the

degradation; the duration (i.e., >30days, 30-3 days, and < 3 days) of the degraded condition;

information such as the magnitude of the leakage or number and location of inoperable

hydrogen igniters. The type of information required can be inferred from Table 7.2 below.

STEP 2 – Screening of Finding

Determine if the finding is associated with an SSC(s) important to LERF, using Table 7.1. If the

finding is screened out then no further assessment is needed and the finding is Green.

Otherwise, proceed to Step 3 below. Note that a detailed description of finding to be assessed

in Step 3 is included in Table 7.2.

STEP 3 – Phase 2 Assessment

Use Table 7.2 to provide a significance assignment to a Type B finding. For inspection findings

involving leakage rates (e.g., MSIV leakage, containment leakage), if the as-found leakage rate

is less than the values listed in Table 7.2, the finding is Green.

Issue Date: 03/23/20 24 0609, App. H

Figure 7.1 Road Map for LERF-based Risk Significance for Evaluation Type B Findings at

Power

Table 7.1

Table 7.1

Table 7.1

Table 7.1

Use

Table 7.2

Use

Table 7.2

Use

Table 7.2

Use

Table 7.2

Issue Date: 03/23/20 25 0609, App. H

Table 7.1 Phase 1 Screening-Type B Findings at Power

Reactor

Type

Containment

Type

SSC Affected by Finding

Containment

Penetration

Seals,

Isolation

Valves, Vent

and Purge

Systems

Ice

Condenser

Flow

Blockage

Suppression

Pool

Integrity

MSIV

Leakage

Drywell /

Containment

Sprays

Igniters

BWR Mark I Perform

Phase 2

Not

Applicable

Perform

Phase 2

Perform

Phase 2

Perform

Phase 2

Not

Applicable

BWR Mark II Perform

Phase 2

Not

Applicable

Perform

Phase 2

Perform

Phase 2

Perform

Phase 2

Not

Applicable

BWR Mark III Perform

Phase 2

Not

Applicable

Perform

Phase 2

Not

Applicable1

Perform

Phase 2

Perform

Phase 2

PWR Large Dry and

Sub-Atmospheric

Perform

Phase 2

Not

Applicable

Not

Applicable

No

Applicable

Not

Applicable

Not

Applicable

PWR AP1000 Perform

Phase 2

Not

Applicable

Not

Applicable

Not

Applicable

Not

Applicable2

Not

Applicable

PWR Ice Condenser Perform

Phase 2

Perform

Phase 2

Not

Applicable

Not

Applicable

Perform

Phase 2

Perform

Phase 2

Note 1: Some BWR Mark lll containments may have a safety-grade low-leakage Main Steam Shutoff Valve (MSSV)

outside of the out- board MSIV. (This may have been abandoned in some plants) Reference (2)

Note 2: AP1000 is being treated akin to a large dry containment in the absence of operating experience, however, a

particular performance deficiency relating to local hydrogen effects (e.g., the potential for a diffusion flame near the

containment wall) could warrant further investigation.

Issue Date: 03/23/20 26 0609, App. H

Table 7.2 Phase 2 Risk Significance -Type B Findings at Power

Reactor

Type

Containment

Type Finding

Risk Significance

>30 days 30–3 days <3 days

BWR Mark I and

Mark II

Leakage from drywell to environment >100 %

containment volume/day through containment

penetration seals, isolation valves or vent and purge

systems

Yellow White Green

Failure of systems/components critical to suppression

pool integrity/scrubbing (vacuum breakers or other

bypass mechanisms)

Yellow White Green

Main steam isolation valve leakage >10,000 scfh

through the best-sealing valve in any steam line (see

Reference 2)

Yellow White Green

Mark I Drywell sprays unavailable Yellow White Green

Mark II Drywell sprays unavailable White Green Green

BWR Mark III

(NOTE 1)

Leakage from wetwell to environment >1,000 %

containment volume/day through containment

penetration seals, isolation valves or vent and purge

systems

White Green Green

Failure of systems/components critical to suppression

pool integrity/scrubbing (vacuum breakers or other

bypass mechanisms)

Yellow White Green

Failure of multiple igniters such that coverage is lost in

two adjacent compartments

White Green Green

Containment sprays unavailable White Green Green

PWR Large Dry and

Sub-Atmospheric

Leakage from containment to environment >100 %

containment volume/day through containment

penetration seals, isolation valves or vent and purge

systems

Red Yellow White

PWR AP1000 Leakage from containment to environment >100 %

containment volume/day through containment

penetration seals, isolation valves or vent and purge

systems

White Green Green

Significant loss of function to hydrogen igniters Note 2

PWR Ice

Condenser

(NOTE 1)

Leakage from containment to environment >100 %

containment volume/day through containment

penetration seals, isolation valves or vent and purge

systems

Red Yellow White

Blockage of more than 15% of the flow passage into or

through the ice bed

Red Yellow White

Failure of multiple igniters such that coverage is lost in

two adjacent compartments

Red Yellow White

Note 1: For BWR Mark III containments and PWR ice condenser plants, the term compartments is used interchangeably

with the term regions, or zones and relates to the likelihood that hydrogen concentrations could rise to levels that

could challenge containment. For a particular finding, the intent is to determine if the igniter system would remain

effective at controlling concentrations in this regard, and “two adjacent compartments” is used as a rule-of-thumb. If

it is not clear whether the igniter system would remain effective, the inspector should refer to the text in section

5.2.3 (Mark III containments) or section 7.2.4 (ice condenser containments) of NUREG-1765, and to consult the

design-basis analysis associated with the igniter system. If it is still unclear, the inspector should contact the

regional SRA and headquarters staff knowledgeable in this area.

Note 2: For AP1000, a significant loss of function to the hydrogen igniters should be assessed for LERF impacts.

Issue Date: 03/23/20 27 0609, App. H

07.02 Approach for Assessing Type B Findings at Shutdown

STEP 1 – Finding Characterization

Figure 7.2 shows the process flow for this approach. Characterize the finding in terms of its

relationship to the containment barrier function. Collect information needed for significance

determination, specifically the SSCs affected and the nature of the degradation, the duration of

the degraded condition if less than the complete outage and if the condition had existed before

shutdown (during power operation), or could exist upon change of plant/containment status (e.g.

return to power) and information such as the magnitude of the leakage or the number and

location of the inoperable hydrogen igniters. The type of information required can be inferred

from Table 7.4 below. In addition, identify each POS(s) and time windows with which the finding

is associated.

STEP 2 – Accident Sequence Screening

STEP 2.1 – Screen on the Basis of POS and Time Window

If the finding occurs (1) in POS 1 or POS 2 AND (2) in TW-E, AND (3) within eight days of the

start of the outage, THEN, go to Step 2.2. Otherwise, screen the finding as Green.

STEP 2.2 – Screen on the Basis of the Impact of the Finding

Determine if the finding is associated with an SSC(s) important to LERF using Table 7.3.

Consideration of items A through D (as applicable) facilitates the use of Table 7.3.

A. Did the finding involve the licensee failing to maintain the capability to close containment

(maintain an intact containment) when the licensee planned to maintain an intact containment

consistent with NRC expectations (GL 88-17) and Industry expectations (NUMARC 91-06)?

This question applies to PWR and BWR Mark III licensees only. If yes, Go to Table 7.3,

containment status is intact. If no, continue with Step B.

B. Did the finding involve hydrogen igniters in a BWR Mark III or a PWR ice condenser

containment and the licensee maintained an intact containment?

If yes, Go to Table 7.3, containment status is intact. If no, continue with Step C.

C. Did the finding occur when the containment was de-inerted for a Mark I or Mark II

containment?

If yes, go to Table 7.3, containment status is de-inerted. If no, continue with Step D.

D. Did the licensee intend to have an open containment without the capability to reclose

containment?

If yes, Go to Table 7.3, containment status is open.

NOTE: If a PWR licensee is not maintaining an intact containment during POS 1E and POS 2E,

this may be a significant finding under the Maintenance Rule. Check with an SRA for further

guidance.

Issue Date: 03/23/20 28 0609, App. H

If no, Screen out the finding.

If the finding is screened out, it is assigned Green significance, and no further assessment is

needed. Otherwise, proceed to Step 3 below.

STEP 3 – Phase 2 Assessment

Determine if shutdown mitigation capability is minimal or in-depth or closely resembles an indepth or minimal capability. Use Tables 7.5 and 7.6 for BWRs, or Tables 7.7 and 7.8 for PWRs,

to help make this determination.

NOTE: For PWRs, if mitigation capability does not match with the tables, choose between indepth or minimal capability based on: (1) availability of SGs and (2) availability of ECCS pumps

and charging pumps

Use Table 7.4 to determine color of finding.

NOTE: Should the duration of a Type B finding exist for less than eight hours, then the color

finding is reduced by one order of magnitude.

NOTE: Findings that may have existed before shutdown (during power operation) or that could

impact LERF upon change of plant/containment status (e.g. return to power) should be

assessed. In case the finding is judged to impact power operation, Section 07.01 guidance

should be used in the assessment.

Issue Date: 03/23/20 29 0609, App. H

Figure 7.2 Road Map for LERF-based Risk Significance Evaluation for Type B Findings at

Shutdown

Use

Table 7.3

Use

Table 7.3

Use

Table 7.4

Use

Table 7.4

Level of Shutdown

Mitigation Capability

Tables 7.5, 7.6, 7.7 & 7.8

Level of Shutdown

Mitigation Capability

Tables 7.5, 7.6, 7.7 & 7.8

Issue Date: 03/23/20 30 0609, App. H

Table 7.3 Phase 1 Screening-Type B Findings at Shutdown

Reactor/

Containment Type

Containment

Status

(Note 1)

SSC Affected by Finding

Containment

Penetration

Seals, Isolation

Valves, Vent

and Purge

Systems

Suppression

Pool Integrity

Drywell/

Containment

Sprays

Igniters

BWR Mark I and II De-inerted No Type B Findings Important to ΔLERF (Note 2)

BWR Mark III Intact Perform

Phase 2

Perform

Phase 2

Screen Out

(Not important to LERF)

Perform

Phase 2

PWR Large Dry and

Sub-Atmospheric Intact Perform

Phase 2

Not

Applicable

Screen Out

(Not important to LERF)

Not

Applicable

PWR AP1000 Intact

Perform Phase 2

contact HQ for

further

assistance

Not

Applicable

Not

Applicable (note 4)

PWR Ice Condenser Intact Perform

Phase 2

Not

Applicable

Screen Out

(Not important to LERF)

Perform

Phase 2

All Open No Type B Findings Important to ΔLERF (Note 3)

Note 1: An intact containment is one in which, the licensee intends to: (1) close all containment penetrations with a

single barrier or can be closed in time to control the release of radioactive material, and (2) maintain the

containment differential pressure capability necessary to stay intact following a severe accident at shutdown.

When the RCS is open, an intact containment means that containment can be reclosed prior to RCS boiling.

A Type B performance deficiency results when a licensee intends to have an intact containment but cannot

maintain that capability due to a performance deficiency. For Mark III containments, the definition of intact

containment applies to primary containment.

If the licensee does not intend to maintain an intact containment, then containment is open. If a PWR

licensee is not maintaining an intact containment during POS 1E and POS 2E, then this observation could be

risk significant under the Maintenance Rule and should be reported to an SRA.

A de-inerted containment is one in which limits on the primary containment oxygen concentration as defined

in TS are no longer maintained.

Note 2: Type B findings would be unimportant to ΔLERF because containment would be de-inerted and expected to

fail due to hydrogen combustion, regardless of Type B finding. However, findings that may have existed

before shutdown or that could impact LERF upon change of plant/containment status (e.g. return to power)

should be assessed.

Note 3: Type B findings would be unimportant to Δ LERF because containment is already open and cannot be reclosed. However, findings that may have existed before shutdown or that could impact LERF upon change of

plant/containment status (e.g. return to power) should be assessed. If a PWR licensee is not maintaining an

intact containment during POS 1E and POS 2E, then this observation could be risk significant under the

Maintenance Rule and should be reported to an SRA.

Note 4: For AP1000, a significant loss of function should be assessed for LERF impacts.

Issue Date: 03/23/20 31 0609, App. H

Table 7.4 Phase 2 Risk Significance -Type B Findings at Shutdown

(For POS 1/TW-E and POS 2/TW-E in which the finding occurs during the first eight days of the outage)

Reactor/

Containment

Type

Containment

Status

(NOTE 1)

Finding

Risk Significance (NOTE 2)

Minimal

Capability

In-depth

Capability

BWR Mark I, II De-inerted Screened Out in Phase 1 N/A N/A

BWR Mark III Intact Leakage from containment to environment

> 1000% containment volume/day through

containment penetration seals, isolation

valves or vent and purge systems with

suppression pool integrity (NOTE 3)

POS 1E -Yellow POS 1E- White

POS 2E - Yellow POS 2E - Green

BWR Mark III Intact Loss of suppression pool integrity

(NOTE 4)

POS 1E -Yellow POS 1E- White

POS 2E - Yellow POS 2E - Green

BWR Mark III

(NOTE 5)

Intact Failure of multiple igniters such that

coverage is lost in two adjacent

compartments given that primary

containment is intact

POS 1E - White POS 2E- Green

POS 2E - White POS 2E - Green

PWR Large Dry and

Sub-Atmospheric

Intact Leakage from containment to environment

> 100 % containment volume/day through

containment penetration seals, isolation

valves or vent and purge systems

POS 1E -Yellow POS 1E - White

POS 2E - Red POS 2E - White

PWR Ice Condenser

(NOTE 5)

Intact Leakage from containment to environment

>100 % containment volume/day through

containment penetration seals, isolation

valves or vent and purge systems

POS 1E - Yellow POS 1E - White

POS 2E - Red POS 2E - White

Failure of multiple igniters such that

coverage is lost in two adjacent

compartments

POS 1E - Yellow POS 1E - White

POS 2E - Red POS 2E - White

All Open Screened Out in Phase 1 Green Green

Note 1: An intact containment is one in which the licensee intends to: (1) close all containment penetrations with a single

barrier or can be closed in time to control the release of radioactive material, and (2) maintain the containment

differential pressure capability necessary to stay intact following a severe accident at shutdown. When the RCS is

open, an intact containment means that containment can be re-closed prior to RCS boiling. A type B performance

deficiency results when a licensee intends to have an intact containment but cannot maintain that capability due to a

performance deficiency. For Mark III containments, the definition of intact applies to primary containment.

If the licensee does not intend to maintain an intact containment, then containment is open. If a PWR licensee is

not maintaining an intact containment during POS 1E and POS 2E, then this observation could be risk significant

under the Maintenance Rule and should be reported to a SRA.

A de-inerted containment is one in which limits on the primary containment oxygen concentration as defined in

Technical Specifications are no longer maintained.

Note 2: The results assume that each shutdown scenario results in a LERF if the licensee fails to maintain an intact

containment or the containment fails due to loss of hydrogen control in Ice Condenser and Mark III containments. In

phase 3 analysis, if the staff concludes that failures involving long term cooling can be eliminated from LERF

because the licensee would have evacuated given successful short-term cooling, then the color of the finding would

be reduced.

When using this table, there are no duration factors associated with findings at shutdown. The generic shutdown

CDFs include the frequency and duration that POS 1 and POS 2 are entered into per calendar year for both PWRs

and BWRs. For BWRs, POS 1 is assumed to last four days; POS 2 is assumed to last two days. For PWRs, POS 1

is assumed to last two days; POS 2 is assumed to last six days. Should the duration of a type B finding exist for

less than eight hours, then the color finding is reduced by one order of magnitude.

Note 3: As discussed in Regulatory Guide 1.174, releases that pass through the pool would be scrubbed and would not

contribute to LERF. Rather than crediting the pool with completely eliminating LERF, a decontamination factor (DF)

Issue Date: 03/23/20 32 0609, App. H

of 10 is assigned to pool scrubbing in the SDP. This DF results in the LERF-significant leak rate increasing from

100% containment volume per day to 1000% containment volume per day

Note 4: With the suppression pool unavailable, fission products will not be scrubbed and steam generated by decay heat is

assumed to lead to gradual over-pressurization of containment and the need to vent prior to effective evacuation.

Thus, the finding could be LERF significant even if leak rate is less than 100% containment volume per day.

Note 5: For BWR Mark III containments and PWR ice condenser plants, the term compartments is used interchangeably

with the term regions, or zones, and relates to the likelihood that hydrogen concentrations could rise to levels that

could challenge containment. For a particular finding, the intent is to determine if the igniter system would remain

effective at controlling concentrations in this regard, and “two adjacent compartments” is used as a rule-of-thumb. If

it is not clear whether the igniter system would remain effective, the inspector should refer to the text in section 5.2.3

(Mark III containments) or section 7.2.4 (ice condenser containments) of NUREG-1765, and to consult the designbasis analysis associated with the igniter system. If it is still unclear, the inspector should contact the regional SRA

and headquarters staff knowledgeable in this area.

Issue Date: 03/23/20 33 0609, App. H

Table 7.5 BWRs With Minimal Shutdown Mitigation Capability

Total Annualized CDF Head on: 3E-6 (per calendar year)

Total Annualized CDF Head off: 9E-7 (per calendar year)

Item Value

RHR pumps 2 (shared with ECCS)

Other heat removal pumps 0

ECCS pumps (in standby) 2 (Shared with RHR)

SRVs for Power Operated Relief Mode 2

CCW pumps/trains 1 train with 2 pumps

SW pumps/trains 1 train with 2 pumps

Containment Spray pumps 0

Fire Water No

SW Injection into RCS No

Path to Suppression Pool Yes

Suppression Pool Yes

Other Water sources No

Other means of removing heat None

Offsite power sources 2

EDGs 1

Other onsite power sources 0

Level instruments Yes

Vessel Temperature Instruments No

Level 3 RHR Isolation Sometimes Not Used

Issue Date: 03/23/20 34 0609, App. H

Table 7.6 BWRs With In-depth Shutdown Mitigation Capability

Total Annualized CDF RCS Head on: 2E-7 (per calendar year)

Total Annualized CDF RCS Head off: 4E-8 (per calendar year)

Item Value

RHR pumps 2 (Shared with ECCS

Other heat removal pumps 0

ECCS pumps 2 (shared with RHR pumps)

SRVs (in Power Operated Relief mode) 2

CCW pumps/trains 1 train with pumps

SW pumps/trains 1 train with pumps

Containment Spray Pumps 0

Fire Water Yes

SW Injection into the RCS Yes

Path to the Suppression Pools Yes

Suppression Pool Yes

Other water sources No

Other means of removing heat None

Offsite power sources 2

EDGs 2

Other onsite power sources 0

Level instruments Yes

Vessel temperature Instruments Yes

Level 3 RHR isolation Always

Issue Date: 03/23/20 35 0609, App. H

Table 7.7 PWRs With Minimal Shutdown Mitigation Capability

Total Annualized CDF RCS open: 3E-5 (per calendar year)

Total Annualized CDF RCS closed: 3E-6 (per calendar year)

Item Value

RHR pumps 2

Other heat removal pumps 0

ECCS pumps (in standby) 1

RCS vents and pressure control Yes

CCW pumps/trains 2 trains

SW pumps/trains 2 trains

Containment Spray pumps (as back up to the RHR pumps) 0

Gravity Feed Yes

Accumulators 0

Steam Generators Yes

Containment sumps Yes, but not fully reliable

Other borated water sources 0

Other means of removing heat 0

Offsite power sources 2

EDGs 1

Other onsite power sources 0

Level instruments 2 some of time

Vessel temperature Instruments 2 some of time

Issue Date: 03/23/20 36 0609, App. H

Table 7.8 PWRs With In-depth Shutdown Mitigation Capability

Total Annualized CDF RCS open: 1E-7 (per calendar year)

Total Annualized CDF RCS closed: 8E-7 (per calendar year)

Item Value

RHR pumps 2

Other heat removal pumps 0

Charging Pumps 1

ECCS pumps (in standby) 1

RCS vents and pressure control Yes

CCW pumps/trains 2 trains

SW pumps/trains 2 trains

Containment Spray pumps 2 as piggy back to the RHR pumps

Gravity Feed Yes

Accumulators 0

Steam Generators Yes

Containment sumps Yes, enhanced reliability

other borated water sources 0

other means of removing heat 0

Offsite power sources 2

EDGs 2

other onsite power sources 0

Level instruments 2 at all times

Vessel temperature Instruments 2 at all times

Issue Date: 03/23/20 37 0609, App. H

0609H-08 REFERENCES

1. Regulatory Guide 1.174, Revision 3 “An Approach for using Probabilistic Risk

Assessment in Risk-informed Decisions on Plant-Specific Changes to the Licensing

Basis.” January, 2018.

2. PRAB–02-01 “Assessment of BWR Main Steam Line Release Consequences.”

ML062920249. October 2002.

3. NRC, Memo from Barret to Haag, SPSB significance Determination Process, December

7, 2001.

4. NUREG-1765 “Basis Document for Large Early Release Frequency (LERF)

Significance Determination Process (SDP)” Inspection Findings That May Affect LERF

December, 2002.

5. NUREG-1150 “Severe Accident Risks: an Assessment for Five U. S. Nuclear Power

Plants” December, 1990.

6. NUREG-1560 “Individual Plants Examination Program: Perspectives on Reactor Safety

and Plant Performance” December, 1997.

7. NUREG/CR-6595 “An Approach for Estimating the Frequencies of Various Containment

Failure Modes and Bypass Events”. January, 1999.

8. NUREG/CR-5432 “The Probability of Liner Failure in Mark-I Containment” August,

1991.

9. NUREG/CR-6427 “Assessment of the DCH Issue for Plants with Ice Condenser” April,

2000.

10. NUREG/CR-4330 “Review of Light Water Reactor Regulatory Requirements” June,

1986.

11. NUREG/CR-1493 “Performance- Based Containment Leak-Test Program” September,

1995.

12. 51 FR 28044 “Safety Goals for the Operations of Nuclear Power Plants; Policy

Statement; Republication” August 1986.

13. NUREG-2195 “Consequential SGTR Analysis for Westinghouse and Combustion

Engineering Plants with Thermally Treated Alloy 600 and 690 Steam Generator Tubes,

Final Report” May 2018.

14. Westinghouse AP1000 Design Control Document Rev. 19 – Tier 2 Chapter 19 –

Probabilistic Risk Assessment – Sections 19.59 PRA Results and Insights.

ML11171A411. June 2011.

15. Vogtle, Units 3 and 4, Updated Final Safety Analysis Report, Revision 2, Chapter 19,

Probabilistic Risk Assesment. ML13206A152. June 2013.

Issue Date: 03/23/20 Att 1-1 0609, App. H

Attachment 1 Guidance for Assessing the Timing of Protective Actions in Detailed Risk

Evaluations

SDP LERF treatment typically relies on a general, functional definition of LERF, rather than a

more detailed accounting of accident progressing timing against protective action timing. While

this more general treatment is usually sufficient for an SDP, experience has shown that it is

infrequently necessary to evaluate the timing of protective actions relative to radiological release

on an accident sequence basis as part of a detailed risk evaluation. In these situations, the

guidance below may be helpful, and should be considered in tandem with other considerations

specific to the SDP in question. This level of detail may not be warranted, particularly if the

available information on core damage and containment failure timings is not well-characterized.

1. Early declaration, when warranted, may be credited on a probability basis. Example:

EALs provide for SRO judgement in some circumstances. 50% probability that SRO

declares event early given the plant damage state.

2. It should be assumed that emergency action level monitoring and protective action

recommendations are made in a timely manner (e.g. declaration made within 15 minutes

of relevant plant conditions and protective action recommendations made 15 minutes

thereafter).

3. For external hazards well beyond the design basis (e.g. seismic bins in the upper end of

the seismic hazard), some impact on response capabilities is possible but also beyond

the state-of-the-practice to model. If these types of events are particularly important to a

particular risk evaluation, a sensitivity study could be used to address this aspect.

4. Evacuation time estimate (ETE) studies have been performed, and are periodically

updated for all sites. These studies are appropriate sources of information for use in

SDP assessments. It is understood that these studies are developed for other purposes,

but they often represent the “best available information” with respect to evacuation

timing, which meets the intent of SDP. They typically provide estimates of the time

between the start of evacuation to the time the last of the individuals have cleared the

10-mile boundary for a range of conditions and assumptions.

5. In using ETE studies as part of the best available information for LERF determination in

a detailed risk evaluation:

a. ETE studies typically present timing for evacuations of emergency response planning

areas (ERPAs). ERPAs are typically defined by compass sectors and distances of 2,

5, and 10 miles. For LERF, it is the 2 mile population that is most relevant.

b. ETE studies typically present timings for the time to evacuate 90% and 100% of the

population in particular ERPAs and combinations of ERPAs. The analyst should use

the time estimates associated with evacuating 90% of the population, as this

represents a reasonable tradeoff between the inclusiveness of the 100% value,

versus the fact that the timings represent the time to reach the 10 mile boundary

(whereas dose levels will likely drop below those of concern for LERF prior to that

distance).

Issue Date: 03/23/20 Att 1-2 0609, App. H

c. ETE studies present times for different scenarios (e.g., day time, night time, winter

storms, and roadway impacts). When considering the spectrum of applicable

scenarios If the LERF determination is not sensitive to the range of time estimates of

relevance, use the most inclusive time.

d. ETE studies also present timings for different evacuation assumptions (i.e., keyhole

evacuation, 5-mile 360 degree evacuations, and 10-mile 360 degree evacuations). A

judgement should be made as to which of these is most applicable.

6. There are a number of aspects of the above assumptions that are uncertain, and there

are aspects of the protective action implementation that are outside of the licensee’s

control. For this reason, it is appropriate to perform a sensitivity study that shows how

∆LERF would differ if a more optimistic or pessimistic set of assumptions are employed.

Issue Date: 03/23/20 Att 2-1 0609, App. H

Attachment 2: Revision History for IMC 0609, Appendix H

Commitment

Tracking

Number

Accession

Number

Issue Date

Change

Notice

Description of Change

Description

of Training

Required and

Completion

Date

Comment

Resolution and

Closed Feedback

Form Accession

Number (PreDecisional, NonPublic Information)

n/a

04/21/2000

CN 00-007

Intial issuance N/A

n/a ML041340009

05/06/04

CN 04-010

Periodic update N/A

N/A ML18243A521

02/25/19

CN 19-008

Changes included:

• Removed all references to Phase 2 obosolete system notebooks

• Added SRA to the list of people that can perform a Phase 3

analysis.

• Added a reminder that Saphire can now be used to perform

LERF calculations.

• Removed the step to multiply the LERF score by a factor of 3.3

from table 5.3 (now table 6.3) since it is not correct to do so.

• Revised figure 5.1 (now table 6.1) so it no longer mentions SDP

Phase 2 notebooks.

• Provided new definitions for “close in population” and “effective

evacuation”.

• Created a new Attachment 1 which is a Guidance for Assessing

the Timing of Protective Actions in Detailed Risk Evaluations.

• Addressed feedback form 0609H-2225.

Added a new section (section 0609H-05) for C-SGTR and revised table

6.1 to add a row for Combustion Engineering Plants. As a result of

adding section 0609H-05, subsequent sections and table numbers were

changed.

N/A ML18247A003

0609H-2225

ML18352A703

Issue Date: 03/23/20 Att 2-2 0609, App. H

Commitment

Tracking

Number

Accession

Number

Issue Date

Change

Notice

Description of Change

Description

of Training

Required and

Completion

Date

Comment

Resolution and

Closed Feedback

Form Accession

Number (PreDecisional, NonPublic Information)

Table 7.1 has been revised to add a new column for ice condenser flow

blockage.

Added a note to tables 7.2 and 7.4 to provide more information on

failure of multiple igniters for Ice Condenser and BWR Mark III plants.

Added a new section 01.05 regarding the use of licensee provided

LERF information.

Revised definition for Shutdown Operation to better align with IMC 0609,

Appendix G.

ML20078L336

03/23/20

CN 20-017

IMC 0609, Appendix H has been modified to assess AP1000 reactor

design.

0609H2 – Limitations and Precautions:

• Alerted analysts that this is the first introduction of AP1000 into

Appendix H, and if they have a basis for why this procedure is

not adequately capturing the risk, they may depart from this

procedure and perform a Phase 3 detailed risk evaluation.

• Revised the line item about ISLOCAs that the path outside

containment is assumed to be not submerged, and nor does it

benefit from other means of fission product retention. This

sentence was revised based on insights from SOARCA that

substantial ISLOCA fission product retention could result from

means other than break submergence.

• A CDF value was assigned for AP1000 of 1E-6/ry. This value will

be re-visited as operating and PRA modeling experience is

gained with the AP1000 design.

• Shutdown definitions have been removed from IMC 0609,

Appendix H, they are more appropriately located in IMC 0609,

App G, Shutdown Operations Significant Determination Process.

• Reference #14 has been added to the references.

N/A ML19352E278

Issue Date: 03/23/20 Att 2-3 0609, App. H

Commitment

Tracking

Number

Accession

Number

Issue Date

Change

Notice

Description of Change

Description

of Training

Required and

Completion

Date

Comment

Resolution and

Closed Feedback

Form Accession

Number (PreDecisional, NonPublic Information)

• Section 5.01 has been added regarding C-SGTR in AP1000

reactors, and section 6.01 has been revised for C-SGTR.

• Tables 6.1, 6.2, 6.4, 7.1, 7.2, 7.3 have been revised to

accommodate AP1000 reactor design.

• A couple of abbreviations for AP1000 have been added to

section 3.01.

• Table 4.1 has been modified to include information about

AP1000 hydrogen igniters and the ADS system. The information

about stage 4 ADS came from the Vogtle Units 3 and 4 FSAR

table 19.59-18.

• Table 6.4 note 1 – the requirement to notify NRR/SPSB for open

containments per SRM 97-168 was removed because the

requirement to do so has been replaced by a change to 10 CFR 50.65(a)(4) (64 FR 38557) and the issuance of RG 1.160 that

imposed a requirement to manage risk maintenance activities

and clarified that the requirement applied during shutdown

states.

• The wording was changed on note 2 of table 7.4 since the SDP

is the NRC staff process not the licensee.

• Table 7.1 for PWR Ice Condensers was changed to Perform a

Phase 2 for issues with Igniters or Drywell / Containment Sprays.

This was mistakenly changed to Not Applicable in the 2019

revision to Appendix H, and is now being corrected.