February 2003 Monthly Operating Report for Point Beach, Units 1 and 2
ML030770613
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/2003
From: Cayia A
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC 2003-0022
Download: ML030770613 (10)


Text

Nuc Committed to Nuclear Excellence> Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0022 GL 97-02 March 6, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of February 2003.

Sincerely, ic Pr nt Attachment cc: J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager 6590 Nuclear Road ° Two Rivers, Wisconsin 54241 Telephone 920 755 2321 ON

'9 OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 03/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD February - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 521.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 233,015.4 672.0 1,416.0 229,474.5
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 0.0 0.0 846.9
5. UNIT RESERVED SHUTDOWN HOURS 343,233.0 718,423.0 106,269,732.0
6. NET ELECTRICAL ENERGY (MWH)

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15,1997

I..

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 3/04/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: February 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G. Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit I average daily power for the month of February was 510.8 MWe.

Implemented 1.4% Power Measurement Uncertainty Recapture (MUR) for Unit 1 on February 12, 2003.

On February 27, due to concerns with containment isolation valve leakage, Unit 1 power was reduced to 92% for about 0.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

There were no Licensee Event Reports (LERs) submitted to the NRC in February:

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 03/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD February - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 521.0 518.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

MONTH YEAR TO DATE CUMULATIVE 672.0 227,169.1 1,416.0

3. NUMBER OF HOURS REACTOR WAS CRITICAL 224,181.7 672.0 1,416.0
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 302.2 0.0 0.0
5. UNIT RESERVED SHUTDOWN HOURS 725,009.0 105,512,812.5 346,588.0
6. NET ELECTRICAL ENERGY (MWH) 97-02 DATED MAY 15, 1997 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 3/04/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: February 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 2 average daily power for the month of February was 515.8 MWe.

Implemented 1.4% Power Measurement Uncertainty Recapture (MUR) for Unit 2 on February 08, 2003.

There were no Licensee Event Reports (LERs) submitted to the NRC in February:

f E POINT BEACH SHIFT OPERATIONAL DATA

SUMMARY

Februar~y, 2003 4, I Unit 1 1 Unit22 DAY j Gen X02 X04 X08 X27 Net MWhr Avg MWe J Gen X02 X04 X08 X27 Net MWhr Ava MWe J 1 12670.0 477.0 43.0 1.0 5.0 12144.0 506.0 12780.0 475.0 35.0 1.0 5.0 12264.0 511.0 2 12690.0 477.0 39.0 1.0 4.0 12169.0 507.0 12820.0 476.0 35.0 1.0 4.0 12304.0 512.7 3 12730.0 481.0 42.0 1.0 5.0 12201.0 508.4 12810.0 478.0 35.0 1.0 5.0 12291.0 512.1 4 12650.0 478.0 43.0 1.5 5.5 12122.0 505.1 12740.0 477.0 37.0 1.5 5.5 12219.0 509.1 5 12640.0 479.0 43.0 1.0 6.0 12111.0 504.6 12750.01 477.0 39.0 1.0 6.0 12227.0 509.5 6 12660.0 479.0 42.0 1.0 6.0 12132.0 505.5 12780.0 478.0 38.0 1.0 6.0 12257.0 510.7 7 12690.0 480.0 42.0 1.0 6.0 12161.0 506.7 12800.0 479.0 39.0 1.0 6.0 12275.0 511.5 8 12660.0 480.0 44.0 1.5 6.0 12128.5 505.4 12780.0 479.0 39.0 1.5 6.0 12254.5 510.6 9 12690.0 479.0 41.0 1.0 6.0 12163.0 506.8 12960.0 480.0 36.0 1.0 6.0 12437.0 518.2 10 12690.0 481.0 43.0 1.0 6.0 12159.0 506.6 12950.0 480.0 39.0 1.0 6.0 12424.0 517.7 I11 12760.0 481.0 44.0 1.5 6.5 12227.0 509.5 12890.0 480.0 39.0 1.5 6.5 12363.0 515.1 12 12900.0 484.0 44.0 1.0 6.5 12364.5 515.2 12900.0 481.0 39.0 1.0 6.5 12372.5 515.5 13 12830.0 484.0 43.0 1.0 6.0 12296.0 512.3 12820.0 480.0 37.0 1.0 6.0 12296.0 512.3 14 12910.0 482.0 45.0 1.5 6.0 12375.5 515.6 12930.0 481.0 38.0 1.5 6.0 12403.5 516.8 15 12850.0 483.0 43.0 1.0 5.5 12317.5 513.2 12950.0 480.0 38.0 1.0 5.5 12425.5 517.7 16 12850.0 482.0 41.0 1.0 9.5 12316.5 513.2 12970.0 480.0 37.0 1.0 9.5 12442.5 518.4 17 12840.0 480.0 43.0 1.0 0.0 12316.0 513.2 12950.0 480.0 38.0 1.0 0.0 12431.0 518.0 18 12870.0 480.0 40.0 0.5 4.5 12345.0 514.4 12980.0 479.0 36.0 0.5 4.5 12460.0 519.2 19 12850.0 481.0 42.0 1.5 5.0 12320.5 513.4 12960.0 480.0 49.0 1.5 5.0 12424.5 517.7 20 12890.0 480.0 42.0 0.5 5.5 12362.0 515.1 13020.0 479.0 28.0 0.5 5.5 12507.0 521.1 21 12900.0 480.0 48.0 1.0 4.5 12366.5 515.3 13030.0 500.0 34.0 1.0 4.5 12490.5 520.4 22 12900.0 483.0 32.0 1.0 5.5 12378.5 515.8 13010.0 461.0 38.0 1.0 5.5 12504.5 521.0 23 12950.0 487.0 38.0 1.5 5.5 12418.0 517.4 13050.0 486.0 39.0 1.5 5.5 12518.0 521.6 24 12720.0 473.0 43.0 1.0 6.0 12197.0 508.2 12950.0 473.0 39.0 1.0 6.0 12431.0 518.0 25 12810.0 481.0 42.0 1.0 6.5 12279.5 511.6 12820.0 482.0 39.0 1.0 6.5 12291.5 512.1 26 12850.0 482.0 42.0 1.0 5.5 12319.5 513.3 12970.0 480.0 39.0 1.0 5.5 12444.5 518.5 27 12770.0 481.0 42.0 1.5 5.5 12240.0 510.0 12930.0 480.0 39.0 1.5 5.5 12404.0 516.8 28 12830.0 480.0 41.0 0.5 5.5 12303.0 512.6 12950.0 480.0 38.0 0.5 5.5 12426.0 517.8 MONTHLY TOTALS - UNIT 1 MONTHLY TOTALS - UNIT 2 Gross Generation: 358,050.0 MWhr Gross Generation: 361,250.0 MWhr Total Station Service: 14,817.0 MWhr Total Station Service: 14,662.0 MWhr Net Generation: 343,233.0 MWhr Net Generation: 346,588.0 MWhr Average Daily Power: 510.8 MWe Average Daily Power: 515.8 MWe

zI POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 AVERAGE DAILY UNIT POWER LEVEL DATE: 03/04/03 COMPLETED BY: Kim M. Locke MONTH FEBRUARY - 2003 TELEPHONE: 920-755-6420 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL MWe NET MWe NET DAY MWe NET DAY DAY 509 21 515 1 506 11 515 22 516 2 507 12 512 23 517 3 508 13 516 24 508 4 505 14 25 512 5 505 15 513 26 513 6 506 16 513 27 510 7 507 17 513 28 513 8 505 18 514 19 513 9 507 507 20 515 10

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 1 - FEBRUARY 2003 UNITS MONTH YEAR CUMULATIVE ELECTRICAL 358,050.0 749,550.0 111,448,680.0 MWH 5,178,948.0 GROSS GENERATION 14,817.0 31,127.0 MWH 106,269,732.0 TOTAL STATION SERVICE MWH 343,233.0 718,423.0 NET OUTPUT 529.3 393.4 MWH 532.8 AVG. GROSS GENERATION FOR MONTH 532.8 529.3 485.7 MWH 4.7%

AVG. GROSS GENERATION RUNNING 4.1% 4.2%

TOTAL STATION SERVICE/GROSS GEN. 672.0 1,416.0 229,474.5 HRS HOURS OF GENERATION MONTH YEAR CUMULATIVE PLANT PERFORMANCE UNITS 33.32% 32.39%

33.38%

NET PLANT EFFICIENCY 10,223.4 10,243.3 10,537.8 BTU/KWH 10,476 NET PLANT HEAT RATE 28 59 NUMBER OF DAYS OF OPERATION DAYS 99.0% 98.9% 76.6%

UNIT NET CAPACITY FACTOR 100.0% 100.0% 81.0%

UNIT SERVICE FACTOR 0 0 127 SCHEDULED OUTAGES 0 0 73 FORCED OUTAGES 0.0 0.0 10,227.1 HRS 4.3%

FORCED OUTAGE HOURS 0.0% 0.0%

UNIT FORCED OUTAGE RATE MONTH YEAR CUMULATIVE NUCLEAR UNITS 1,416.0 233,015.4 HRS 672.0 HOURS CRITICAL 672.0 1,416.0 283,271.0 HRS 57 TOTAL HOURS POSSIBLE 0 0 INADVERTANT REACTOR TRIPS 0.0 0.0 50,339.6 HRS 76.3%

DURATION OF REACTOR DOWN TIME 100.8% 100.3%

REACTOR CAPACITY FACTOR 100.0% 100.0% 82.3%

REACTOR SERVICE FACTOR 1,028,209.0 2,156,341.0 328,135,691.0 MWTHR THERMAL POWER GENERATED MWTHR 4,841,790.0 THERMAL POWER GENERATED THIS FUEL CYCLE

'S POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 AVERAGE DAILY UNIT POWER LEVEL DATE: 03/04/03 COMPLETED BY: Kim M. Locke MONTH FEBRUARY - 2003 TELEPHONE: 920-755-6420 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL MWe NET MWe NET DAY MWe NET DAY DAY 515 21 520 1 511 11 516 22 521 2 513 12 512 23 522 3 512 13 517 24 518 4 509 14 518 25 512 5 509 15 518 26 519 6 511 16 518 27 517 7 511 17 28 518 8 511 18 519 19 518 9 518 518 20 521 10

I POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 2 - FEBRUARY 2003 ELECTRICAL UNITS MONTH YEAR CUMULATIVE GROSS GENERATION MWH 361,250.0 755,880.0 110,669,300.0 TOTAL STATION SERVICE MWH 14,662.0 30,871.0 5,156,487.5 NET OUTPUT MWH 346,588.0 725,009.0 105,512,812.5 AVG. GROSS GENERATION FOR MONTH MWH 537.6 533.8 412.9 AVG. GROSS GENERATION RUNNING MWH 537.6 533.8 493.7 TOTAL STATION SERVICE/GROSS GEN. 4.1% 4.1% 4.7%

HOURS OF GENERATION HRS 672.0 1,416.0 224,181.7 PLANT PERFORMANCE UNITS MONTH YEAR CUMULATIVE NET PLANT EFFICIENCY 33.66% 33.63% 32.55%

NET PLANT HEAT RATE BTU/KWH 10,140.3 10,148.6 10,483.7 NUMBER OF DAYS OF OPERATION DAYS 28 59 9,514 UNIT NET CAPACITY FACTOR 99.6% 99.4% 80.1%

UNIT SERVICE FACTOR 100.0% 100.0% 83.6%

SCHEDULED OUTAGES 0 0 93 FORCED OUTAGES 0 0 59 FORCED OUTAGE HOURS HRS 0.0 0.0 4,900.9 UNIT FORCED OUTAGE RATE 0.0% 0.0% 2.1%

NUCLEAR UNITS MONTH YEAR CUMULATIVE HOURS CRITICAL HRS 672.0 1,416.0 227,169.1 TOTAL HOURS POSSIBLE HRS 672.0 1,416.0 268,056.0 INADVERTANT REACTOR TRIPS 0 0 50 DURATION OF REACTOR DOWN TIME HRS 0.0 0.0 40,886.9 REACTOR CAPACITY FACTOR 100.9% 100.3% 79.6%

REACTOR SERVICE FACTOR 100.0% 100.0% 84.7%

THERMAL POWER GENERATED MWTHR 1,029,816.0 2,155,974.0 324,128,378.0 THERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 10,540,443.0

Text

Nuc Committed to Nuclear Excellence> Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2003-0022 GL 97-02 March 6, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Dockets 50-266 And 50-301 Point Beach Nuclear Plant, Units 1 And 2 Monthly Operating Reports Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of February 2003.

Sincerely, ic Pr nt Attachment cc: J. D. Loock, PSCW NRC Regional Administrator NRC Resident Inspector NRC Project Manager 6590 Nuclear Road ° Two Rivers, Wisconsin 54241 Telephone 920 755 2321 ON

'9 OPERATING DATA REPORT DOCKET NO. 50-266 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 1 DATE 03/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD February - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 521.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 516.0 MONTH YEAR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 233,015.4 672.0 1,416.0 229,474.5
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 0.0 0.0 846.9
5. UNIT RESERVED SHUTDOWN HOURS 343,233.0 718,423.0 106,269,732.0
6. NET ELECTRICAL ENERGY (MWH)

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER 97-02 DATED MAY 15,1997

I..

UNIT SHUTDOWNS DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 DATE: 3/04/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: February 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G. Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit I average daily power for the month of February was 510.8 MWe.

Implemented 1.4% Power Measurement Uncertainty Recapture (MUR) for Unit 1 on February 12, 2003.

On February 27, due to concerns with containment isolation valve leakage, Unit 1 power was reduced to 92% for about 0.8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

There were no Licensee Event Reports (LERs) submitted to the NRC in February:

OPERATING DATA REPORT DOCKET NO. 50-301 UNIT NAME POINT BEACH NUCLEAR PLANT - UNIT 2 DATE 03/04/03 COMPLETED BY Kim M. Locke TELEPHONE 920-755-6420 REPORTING PERIOD February - 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 521.0 518.0
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET)

MONTH YEAR TO DATE CUMULATIVE 672.0 227,169.1 1,416.0

3. NUMBER OF HOURS REACTOR WAS CRITICAL 224,181.7 672.0 1,416.0
4. NUMBER OF HOURS THE GENERATOR WAS ON LINE 302.2 0.0 0.0
5. UNIT RESERVED SHUTDOWN HOURS 725,009.0 105,512,812.5 346,588.0
6. NET ELECTRICAL ENERGY (MWH) 97-02 DATED MAY 15, 1997 DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC GENERIC LETTER

UNIT SHUTDOWNS DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 DATE: 3/04/2003 COMPLETED BY: Kim M. Locke TELEPHONE: 755-6420 REPORTING PERIOD: February 2003 (Month/Year)

NO. DATE TYPE DURATION REASON (1) METHOD OF CAUSE/CORRECTIVE ACTIONS F: FORCED (HOURS) SHUTTING S: SCHEDULED DOWN (2) COMMENTS N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A. Equipment Failure (Explain) I Manual B. Maintenance or Test 2 Manual Trip/Scram C. Refueling 3 Automatic Trip/Scram D. Regulatory Restriction 4. Continuation E. Operator Training/license Examination F .Administrative 5. Other (Explain)

G .Operational Error (Explain) H .Other (Explain)

SUMMARY

Unit 2 average daily power for the month of February was 515.8 MWe.

Implemented 1.4% Power Measurement Uncertainty Recapture (MUR) for Unit 2 on February 08, 2003.

There were no Licensee Event Reports (LERs) submitted to the NRC in February:

f E POINT BEACH SHIFT OPERATIONAL DATA

SUMMARY

Februar~y, 2003 4, I Unit 1 1 Unit22 DAY j Gen X02 X04 X08 X27 Net MWhr Avg MWe J Gen X02 X04 X08 X27 Net MWhr Ava MWe J 1 12670.0 477.0 43.0 1.0 5.0 12144.0 506.0 12780.0 475.0 35.0 1.0 5.0 12264.0 511.0 2 12690.0 477.0 39.0 1.0 4.0 12169.0 507.0 12820.0 476.0 35.0 1.0 4.0 12304.0 512.7 3 12730.0 481.0 42.0 1.0 5.0 12201.0 508.4 12810.0 478.0 35.0 1.0 5.0 12291.0 512.1 4 12650.0 478.0 43.0 1.5 5.5 12122.0 505.1 12740.0 477.0 37.0 1.5 5.5 12219.0 509.1 5 12640.0 479.0 43.0 1.0 6.0 12111.0 504.6 12750.01 477.0 39.0 1.0 6.0 12227.0 509.5 6 12660.0 479.0 42.0 1.0 6.0 12132.0 505.5 12780.0 478.0 38.0 1.0 6.0 12257.0 510.7 7 12690.0 480.0 42.0 1.0 6.0 12161.0 506.7 12800.0 479.0 39.0 1.0 6.0 12275.0 511.5 8 12660.0 480.0 44.0 1.5 6.0 12128.5 505.4 12780.0 479.0 39.0 1.5 6.0 12254.5 510.6 9 12690.0 479.0 41.0 1.0 6.0 12163.0 506.8 12960.0 480.0 36.0 1.0 6.0 12437.0 518.2 10 12690.0 481.0 43.0 1.0 6.0 12159.0 506.6 12950.0 480.0 39.0 1.0 6.0 12424.0 517.7 I11 12760.0 481.0 44.0 1.5 6.5 12227.0 509.5 12890.0 480.0 39.0 1.5 6.5 12363.0 515.1 12 12900.0 484.0 44.0 1.0 6.5 12364.5 515.2 12900.0 481.0 39.0 1.0 6.5 12372.5 515.5 13 12830.0 484.0 43.0 1.0 6.0 12296.0 512.3 12820.0 480.0 37.0 1.0 6.0 12296.0 512.3 14 12910.0 482.0 45.0 1.5 6.0 12375.5 515.6 12930.0 481.0 38.0 1.5 6.0 12403.5 516.8 15 12850.0 483.0 43.0 1.0 5.5 12317.5 513.2 12950.0 480.0 38.0 1.0 5.5 12425.5 517.7 16 12850.0 482.0 41.0 1.0 9.5 12316.5 513.2 12970.0 480.0 37.0 1.0 9.5 12442.5 518.4 17 12840.0 480.0 43.0 1.0 0.0 12316.0 513.2 12950.0 480.0 38.0 1.0 0.0 12431.0 518.0 18 12870.0 480.0 40.0 0.5 4.5 12345.0 514.4 12980.0 479.0 36.0 0.5 4.5 12460.0 519.2 19 12850.0 481.0 42.0 1.5 5.0 12320.5 513.4 12960.0 480.0 49.0 1.5 5.0 12424.5 517.7 20 12890.0 480.0 42.0 0.5 5.5 12362.0 515.1 13020.0 479.0 28.0 0.5 5.5 12507.0 521.1 21 12900.0 480.0 48.0 1.0 4.5 12366.5 515.3 13030.0 500.0 34.0 1.0 4.5 12490.5 520.4 22 12900.0 483.0 32.0 1.0 5.5 12378.5 515.8 13010.0 461.0 38.0 1.0 5.5 12504.5 521.0 23 12950.0 487.0 38.0 1.5 5.5 12418.0 517.4 13050.0 486.0 39.0 1.5 5.5 12518.0 521.6 24 12720.0 473.0 43.0 1.0 6.0 12197.0 508.2 12950.0 473.0 39.0 1.0 6.0 12431.0 518.0 25 12810.0 481.0 42.0 1.0 6.5 12279.5 511.6 12820.0 482.0 39.0 1.0 6.5 12291.5 512.1 26 12850.0 482.0 42.0 1.0 5.5 12319.5 513.3 12970.0 480.0 39.0 1.0 5.5 12444.5 518.5 27 12770.0 481.0 42.0 1.5 5.5 12240.0 510.0 12930.0 480.0 39.0 1.5 5.5 12404.0 516.8 28 12830.0 480.0 41.0 0.5 5.5 12303.0 512.6 12950.0 480.0 38.0 0.5 5.5 12426.0 517.8 MONTHLY TOTALS - UNIT 1 MONTHLY TOTALS - UNIT 2 Gross Generation: 358,050.0 MWhr Gross Generation: 361,250.0 MWhr Total Station Service: 14,817.0 MWhr Total Station Service: 14,662.0 MWhr Net Generation: 343,233.0 MWhr Net Generation: 346,588.0 MWhr Average Daily Power: 510.8 MWe Average Daily Power: 515.8 MWe

zI POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 UNIT NAME: Point Beach, Unit 1 AVERAGE DAILY UNIT POWER LEVEL DATE: 03/04/03 COMPLETED BY: Kim M. Locke MONTH FEBRUARY - 2003 TELEPHONE: 920-755-6420 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL MWe NET MWe NET DAY MWe NET DAY DAY 509 21 515 1 506 11 515 22 516 2 507 12 512 23 517 3 508 13 516 24 508 4 505 14 25 512 5 505 15 513 26 513 6 506 16 513 27 510 7 507 17 513 28 513 8 505 18 514 19 513 9 507 507 20 515 10

POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 1 - FEBRUARY 2003 UNITS MONTH YEAR CUMULATIVE ELECTRICAL 358,050.0 749,550.0 111,448,680.0 MWH 5,178,948.0 GROSS GENERATION 14,817.0 31,127.0 MWH 106,269,732.0 TOTAL STATION SERVICE MWH 343,233.0 718,423.0 NET OUTPUT 529.3 393.4 MWH 532.8 AVG. GROSS GENERATION FOR MONTH 532.8 529.3 485.7 MWH 4.7%

AVG. GROSS GENERATION RUNNING 4.1% 4.2%

TOTAL STATION SERVICE/GROSS GEN. 672.0 1,416.0 229,474.5 HRS HOURS OF GENERATION MONTH YEAR CUMULATIVE PLANT PERFORMANCE UNITS 33.32% 32.39%

33.38%

NET PLANT EFFICIENCY 10,223.4 10,243.3 10,537.8 BTU/KWH 10,476 NET PLANT HEAT RATE 28 59 NUMBER OF DAYS OF OPERATION DAYS 99.0% 98.9% 76.6%

UNIT NET CAPACITY FACTOR 100.0% 100.0% 81.0%

UNIT SERVICE FACTOR 0 0 127 SCHEDULED OUTAGES 0 0 73 FORCED OUTAGES 0.0 0.0 10,227.1 HRS 4.3%

FORCED OUTAGE HOURS 0.0% 0.0%

UNIT FORCED OUTAGE RATE MONTH YEAR CUMULATIVE NUCLEAR UNITS 1,416.0 233,015.4 HRS 672.0 HOURS CRITICAL 672.0 1,416.0 283,271.0 HRS 57 TOTAL HOURS POSSIBLE 0 0 INADVERTANT REACTOR TRIPS 0.0 0.0 50,339.6 HRS 76.3%

DURATION OF REACTOR DOWN TIME 100.8% 100.3%

REACTOR CAPACITY FACTOR 100.0% 100.0% 82.3%

REACTOR SERVICE FACTOR 1,028,209.0 2,156,341.0 328,135,691.0 MWTHR THERMAL POWER GENERATED MWTHR 4,841,790.0 THERMAL POWER GENERATED THIS FUEL CYCLE

'S POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 UNIT NAME: Point Beach, Unit 2 AVERAGE DAILY UNIT POWER LEVEL DATE: 03/04/03 COMPLETED BY: Kim M. Locke MONTH FEBRUARY - 2003 TELEPHONE: 920-755-6420 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL MWe NET MWe NET DAY MWe NET DAY DAY 515 21 520 1 511 11 516 22 521 2 513 12 512 23 522 3 512 13 517 24 518 4 509 14 518 25 512 5 509 15 518 26 519 6 511 16 518 27 517 7 511 17 28 518 8 511 18 519 19 518 9 518 518 20 521 10

I POINT BEACH NUCLEAR PLANT OPERATING

SUMMARY

REPORT UNIT 2 - FEBRUARY 2003 ELECTRICAL UNITS MONTH YEAR CUMULATIVE GROSS GENERATION MWH 361,250.0 755,880.0 110,669,300.0 TOTAL STATION SERVICE MWH 14,662.0 30,871.0 5,156,487.5 NET OUTPUT MWH 346,588.0 725,009.0 105,512,812.5 AVG. GROSS GENERATION FOR MONTH MWH 537.6 533.8 412.9 AVG. GROSS GENERATION RUNNING MWH 537.6 533.8 493.7 TOTAL STATION SERVICE/GROSS GEN. 4.1% 4.1% 4.7%

HOURS OF GENERATION HRS 672.0 1,416.0 224,181.7 PLANT PERFORMANCE UNITS MONTH YEAR CUMULATIVE NET PLANT EFFICIENCY 33.66% 33.63% 32.55%

NET PLANT HEAT RATE BTU/KWH 10,140.3 10,148.6 10,483.7 NUMBER OF DAYS OF OPERATION DAYS 28 59 9,514 UNIT NET CAPACITY FACTOR 99.6% 99.4% 80.1%

UNIT SERVICE FACTOR 100.0% 100.0% 83.6%

SCHEDULED OUTAGES 0 0 93 FORCED OUTAGES 0 0 59 FORCED OUTAGE HOURS HRS 0.0 0.0 4,900.9 UNIT FORCED OUTAGE RATE 0.0% 0.0% 2.1%

NUCLEAR UNITS MONTH YEAR CUMULATIVE HOURS CRITICAL HRS 672.0 1,416.0 227,169.1 TOTAL HOURS POSSIBLE HRS 672.0 1,416.0 268,056.0 INADVERTANT REACTOR TRIPS 0 0 50 DURATION OF REACTOR DOWN TIME HRS 0.0 0.0 40,886.9 REACTOR CAPACITY FACTOR 100.9% 100.3% 79.6%

REACTOR SERVICE FACTOR 100.0% 100.0% 84.7%

THERMAL POWER GENERATED MWTHR 1,029,816.0 2,155,974.0 324,128,378.0 THERMAL POWER GENERATED THIS FUEL CYCLE MWTHR 10,540,443.0