MONTHYEARNRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements NRC-93-0077, Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys1993-07-29029 July 1993 Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys NRC-93-0061, Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld1993-07-29029 July 1993 Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld NRC-93-0078, Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers1993-07-29029 July 1993 Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers NRC-93-0062, Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements1993-05-24024 May 1993 Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements NRC-93-0038, Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys1993-05-24024 May 1993 Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys 1999-09-24
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217N4301999-10-25025 October 1999 Amend 17 to License DPR-9,revising TS by Deleting SR D.3.c, Which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages ML20205Q7091999-04-15015 April 1999 Amend 16 to License DPR-9,allowing Possession of Nominal Amount of Special Nuclear Matl NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 ML20198S3271999-01-0606 January 1999 Amend 15 to License DPR-9,consisting of Changes to TS ML20154R2251998-10-21021 October 1998 Amend 13 to License DPR-9,allowing Access Control Flexibility,Establishing Compensatory Provisions Re PA Boundary,Eliminating Redundancy Between Ts,Revising Figure B-1 & Correcting Typos NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements ML20133L6171997-01-0202 January 1997 Amend 11 to License DPR-9,allowing Certain Equipment & Instruments to Be Removed from Svc for Short Periods of Time Allowing for Maint,Testing,Insp & Account for Equipment Failures NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements 1999-09-24
[Table view] |
Text
. _ . . _ _
I WAlism S. omr
. We Preudent
. Nuclear Operations y;-; 4 DOITOli rem Edison mar h*ay 6400 Nortn Dizie Hig Wds o-August 5, 1988 NRC- 88-017 3 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
References:
- 1) Fermi 2 NRC Docket No. 50-341 NRC License No NPF-43
- 2) Detroit Edison Letter to NRC, NRC-87-0244, "Proposed Technical Specification Change (License Amendment) - Emergency Equipment Cooling Water System (3/4.7.1.2), Emergency Equipment Service Water System (3/4.7.1.3), and Ultimate Heat Sink ;
(3/4.7.1.5)", dated March 10, 1988 i
Subject:
Proposed Technical Specification Change (License Amendment) - Noninterruptible Control Air System Pursuant to 10CFR50.90, Detroit Edison Company hereby proposes to amend Operating License NPF-43 for the Fermi 2 piset by incorporating the enclosed change into the Plant Technical Specifications. The proposed change adds a new Specification, numbered 3/4.7.10, for the Noninterruptible Control Air System. A proposed Bases is also included.
Detroit Edison has evaluated the proposed Technical Specifications against the criteria of 10CFR50.92 and determined that no significant hazards consideration is involved. The Fermi 2 Onsite Review Organization has approved and the Nuclear Safety Review Group has reviewed the proposed Technical Specifications and concurs with the enclosed determinations. ,
I Pursuant to 10CFR170.12(c) encloscd with this amendment request is a I J
check for one hundred fifty dollars ($150.00). In accordance with l 10CFR50.91, Detroit Edison has provided a copy of this letter to the State of Michigan.
f00I I
sw G803110082 880805 PDR P
ADOCK 05000341 PDC
[NN l
4
, US'NRC August 5, 1988 NRC-88-0173 Page 2 If you have any questions, please contact Mr. Glen D. Ohlemacher at (313) 586-4275.
Sincerely, Enclosure cc: A. B. Davis R. C. Knop T. R. Quay W. G. Rogers Supervisor. Advanced Planning and Review Section, Michigan Public Service Commission l
l
. USNRC August 5, 1988 NRC-88-0173 Page 3 I, WILLIAM S. ORSER, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
WILLIAM S. ORSER Vice President Nuclear Operations On this dh day of M 1988, before me personally appeared William S. Orserfeing ff rst duly sworn and says that he executed the foregoing as his free act and deed.
/ .
NotaryPubgc SHIRLEY L CARLSON Wory Putilc. Wayne County, het W h Wh 25,1991 l I
i I
i 1
1
USNRC August 5, 1988 l NRC-88-0173 Page 4 bec: C. Borr (WPSC, Inc.)
S. G. Catola J. M. DuBay P. Fessler J. H. Flynn F. N. Ghodsi-D. R. Gipson L. S. Goodman D. Hahn (Michigan Dept./Public Health)
R. S. Lenart C. A. Naegeli W. S. Orser T. Randazzo C. Settles R. B. Stafford F. J. Svetkovich B. R.-Sylvia R. J. Szkotnicki/R. D. Lightfoot W. Tucker /G. Preston/J. Plona Information Management - 140 NOC Secretary's Office (2412 WCB)
NRR Chron File NSRG Secretary RACTS Coordinator UFSAR Coordinator Author Routing Copy t
~
, Enc 16sure NRC-88-0173 Page 1 BACKGROUND / DISCUSSION The Fermi 2 station and control air systems provide the plant with a reliable source of clean, dry, oil-free compressed air for plant operation. These systems are the source of compressed air for use in routine maintenance operations, in equipment process cycles such as domineralizer backwashing, and as an instrument and control media.
The station air system normally provides control air at 100 psig for operation and control of various plant systems that are safety related as well as those that are nonsafety related. The control air distribution system is divided into two distinct parts: interruptible and noninterruptible. Noninterruptible control air (Noninterruptible Air Supply or NIAS) supplies through two separate distribution systems (Divisions I and II) equipment in the Standby Gas Treatment System (SGTS), Control Center Air Conditioning System (CCACS), Main Steam Isolation Valve Leakage Control System (MSIVLCS), Primary Containment Atmospheric Monitoring System (PCAMS), Emergency Equipment Cooling Water System (E"CWS), Primary Containment Pneumatic Supply System, Torus to Secondary Containment vacuum breaker testability feature, and 1 Torus to Secondary Containment vccuum breaker isolation valves. In addition, Division I NIAS provides control air for the primary )
containment isolation valves on the drywell equipment and floor drain sump pump discharge lines, Suppression Chamber narrow range level indicating and alarm instrumentation isolation valves, and a backup supply for Division I nitrogen pneumatic supply to the Primary Containment. Division II NIAS supplies, in addition, air operated valves in the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) systems. All other control air users are l connected to the Interruptible Control Air distribution system that is I supplied separately from the station air system. A simplified diagram is attached.
During normal plant operation, the source of noninterruptible and interruptible control air is through interconnections between the station and control air systems. Compressed air from the station air system is supplied through one of these interconnections to the Division I and II noninterruptible control air compressor discharge headers. The air then flows from each header through its divisional !
100 percent-capacity filter and dryer. After leaving the ;
f ilt e r/d rye r, the noninterruptible control air flows to its divisional I control air receiver from which it eventually flows to its point of i use through its divisional noninterruptible control air distribution I system.
Initiation of the Control Air System Compressor operation and isolation of the Control Air System occurs automatically on detection i
i 1
l
n ,a 4 gA
$nclosure NRC-88-0173 Page 2 of low control air header pressure (85 psig and 75 psig, respectively) and loss of offsite power. In addition, both Control Air Compressors start on a Loss of Coolant Accident (LOCA) signal. The LOCA signal >
comes from either high drywell pressure or level 2 low reactor water level. Normally, the intertie between the Station Air System and Control Air System is open and the Control Air Compressors are not running.
Loss of NIAS to the RCIC, HPCI, EECW and the Primary Containment Pneumatic Supply Systems, does not affect their OPERABILITY. The remaining systems and components which are supplied NIAS become inoperable upon loss of NIAS.
When Division I of control air is lost to the isolation valves on the drywell equipment and floor drain sump pump discharge lines these valves fail to the isolated position. Manual action to provide an alternative motive force to open these isolation valves is required to monitor Reactor Coolant System (RCS) leakage by monitoring Primary Containment sump flow rate per Specification 4.4.3.2.1.b. The isolation valves would be opened, and the ACTION provisions of Specification 3.6.3 entered, for intermittent short time periods necessary to pump the Primary Containment sumps. If RCS leakage monitoring surveillance requirements can not be met appropriate ACTION will be taken per Specification 3.4.3.2.
Recently Detroit Edison received a Notice of Violation and Civil Penalty due to problems in interpretation as to the required actions for an inoperable Control Air Compressor. Further, the Fermi 2 Control Air System design includes redundancy not normally found in divisional systems in that all control air requirements can be supplied by either division's air compressor. Detroit Edison therefore is proposing new Technical Specifications (attached) for the Noninterruptible Control Air system in order to prevent further interpretation problems and properly account for the unique system design at Fermi 2.
PROPOSED TECHNICAL SPECIFICATION The proposed Limiting Condition for Operation (LCO) for the Noninterruptible Control Air System is:
" Two independent Noninterruptible Control Air (NIAS) system subsystems shall be OPERABLE with each subsystem:
- a. Consisting of one OPERABLE Control Air Compressor, associated Dehydration and Filter Units Air Rceciver Tank, and associated control instrumentation.
E'nclosure NRC-88-0173 Page 3
- b. Capable of automatic isolation from nonsafety grade air systems.
This LCO defines the number of NIAS system subsystems required to be OPERABLE. For each subsystem, the required components are explicitly listed. Since each subsystem is normally connected to a nonsafety grade air system, the requirement of automatic isolation capability is explicitly given.
The LCO is proposed to be APPLICAPLE in all OPERATIONAL COND3 PIONS and when irradiated fuel is being handled in the secondary containment, during CORE ALTERATIONS, and during operations with a potential for draining the reactor vessel (OPERATIONAL CONDITTON *). This APPLICABILITY is consistent with the required APPLICABILITY of components which vtilize the NIAS.
The ACTION requirements are stated separately for OPERATIONAL CONDITIONS 1, 2 and 3 and other OPERATIONAL CONDITIONS. In OPERATIONAL CONDITIONS 1, 2, and 3. the ACTION requirements are:
- 1) With one NIAS system subsystem inoperable due to an inoperable Control Air Compressor, associated Dehydration or Filter Unit, or associated control instrumentation, cross-tie the NIAS system subsystem to the OPERABLE NI AS system subsystem within one hour. Restore the inoperable NIAS system subsystem to OPERABLE status within 30 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- 2) With one NIAS system subsystem otherwise inoperable:
- a. Verify that the NIAS system subsystems are not cross-tied within one hour,
- b. Declare the af fected Accident Monitoring Instrumentation (Drywell Hydrogen and Oxygen concentration, Drywell pressure, and Suppression Chamber pressure and water level). Primary Containment Atmosphere Gaseous Radioactivity monitor (Division I only), MSIV Leakage Control System subsystem. Torus to Secondary Containment vacuum breaker isolation valve, Standby Gas Treatment System subsystem, and Control Room Emergency Filtration System components inoperable and take the ACTIONS required by Specification 3.3.7.5, 3.6.2.1, 3.4.3.1, 3.6.1.4, 3.6.3, 3.6.5.3, and 3.7.2.
Enclosure NRC-88-0173 Page 4
- 3) With both NIAS system subsystems inoperable be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Action 1 applies to situations where it is possible to continue to supply control air to an inoperable subsystem from the opposite subsystem. In these cases, the single control air compre:sor has sufficient capacity to supply all the required uses in both divisions. Since each supplied component has its normal nonsafety grade air supply and a single safety grade air supply, Detroit Edison believes that the supplied components themselves should be considered OPERABLE.
However, it must be recognized that a loss of redundancy in the safety grade air rupply would exist. If a loss of normal air supply occurs combined with a loss of certain single components of the sefety grade backup air supply, then both divisions of the affected safety systems would become inoperable. Detroit Edison proposes a 30 day allowable outage time for this loss of redundancy due to the small risk of the above events occurring. A study performed by Detroit Edison using the '
PRA methodology has shown that cross-tieing the NIAS subsystems poses a sma!.ler risk to plant safety than operation with no safety grade back up control air for one division.
Action 2 covers the situation where the NIAS system subsystems must not be cross-tied. In this case, the ACTIONS specified in the Technical Specifications for the resulting inoperability of the supported systems are applied. The Primary Containment Atmosphere Geseous Radioactivity monitor is supported by only the Division I NIAS system subsystem; accordingly, a notation to this effect is included.
Action 3 requires a prompt plant shutdown if both NIAS system j subsystems are inoperable. This is consistent with the required l ACTION from the resulting inoperabilities.
In OPERATIONAL CONDITIONS 4, 5, OR
- a similar philosophy is applied:
- 1) With one NIAS system subsystem inoperable due to an inoperable Control Air Compressor, associated Dehydratior. or Filter Unit or control instrumentation, cross-tie the NIAS system subsystem to the OPERABLE NI AS system subsystem within one hour.
- 2) Otherwise, declare the Standby Gas Treatment subsystem (s) and Control Room Emergency Filtration System ccmponent(s) inoperable and take the ACTIONS required by Specifications 3.6.5.3 and 3.7.2.
l I
l l
., . . _ _ _ . . . _ . . . ~ , _ _ . , , _ . . , _ .- _. . _ , . . . ~ - . . -
. Enc 16sure NRC-88-0173 Page 5 An unlimited period of time is proposed with the NIAS system subsystems cross-tied since, with the plant shutdown, the risk to plant safety is lessened. This provision also allows for extended maintenance on one division's control air components.
The following Surveillance Requirements are proposed:
The Noninterruptible Control Air System shall be demonstrated OPERABLE:
- a. At least once per 31 days by verifying that the cross-tie valves and each valve (manual, power-operated or automatic) required for proper operation of the Control Air Compressors, Filter and Dehydration Units, and associated control ,
instrumentation, that is not locked. sealed, or otherwise secured in position, is in its correct position.
- b. At least once per 18 months by verifying that each automatic valve which isolates the NIAS system subsystem from nonsafety grade air systems actuates to its isolation position on each of the following automatic actuation test signals:
- 1. Station air supply low pressure
- 2. NIAS control air header icw pressure
- 3. Loss of offsite power
- c. At least once per 18 months by verifying the control air compressor capacity is greater than or equal to 100 sefm.
- d. At least once per 18 months by verifying that each Control Air Compressor automatically starts on each of the following automatic actuation test signals:
- 1. NIAS control air header low pressure
- 2. Loss of Coolant Accident (Drywell Pressure-High and/or Reactor Vessel Level-Low Level 2)
- 3. Emergency Diesel Generator load sequencer following loss of power These requirements ensure that system alignment is maintained and important aspects of system operatior e runctionally tested every 18 months. Detroit Edison believes that .h se Surveillance Reqeirements
B 4 Enclosure NRC-88-0173 Page 6 provide adequate assurance of proper system performance and are consistent with other Specifications for systems which fulfill a similar function.
In reference 2. Detroit Edison requested changes to Technical Specifications for Fermi 2 cooling water systems. The NI AS Control Air Compressors are cooled by Emergency Equipment Cooling Water (EECW). The addition of these proposed Specifications entails modification of the reference 2 proposal in that the Control-Air Compressors become inoperable when EECW is lost. Therefore, Specification 3.7.10 must be added to the list of Specifications in Specification 3.7.1.2 for which ACTION is required in the event of an inoperable EECW system subsystem. Page changes for Technical Specifiestions, both as presently existing and as proposed to be modified in reference 2, are attached. In addition, proposed bases for the new Specification are attached.
SIGNIFICANT RAZARDS CONSIDERATION In accordance with 10CFR50.92, Detroit Edison has made a determination that the proposed amendment involves no significant hazards considerations. To make this determination, Detroit Edison must establish that operation in accordance with the proposed amendment would not: 1) involve a significant increase in the probability or consequences of an accident previously evaluated, or 2) create the possibility of a new or different kind of accident from any accident previously evaluated, or, 3) involve a significant reduction in a margin of safety.
The proposed change to include Technical Specifications provisions for the Noninterruptible Control Air System (NIAS) do not:
- 1) Involve a significant increase in the probability or consequence of an accident previously evalurced. The new explicit requirements were previously implied through the effect of the NIAS upon the OPERABILITY of equipment included in Technical Specifications. The new Specification also provides new out-of-service times for modes of operation which are described in the Fermi 2 safety analysis, but are j not adequately addressed by the concept of OPERABILITY.
Further, the new out-of-service times are based upon compensating design features present at Fermi 2. Thus the probability or consequence of any previously evaluated accident is unchanged since the proposed changes either do not represent actual changes in requirements or are based upon compensatory design features.
- 2) Create the possibility of a new or dif ferent kind of accident from any accident previously evaluated. The change does not
. Enclosure NRC-88-0173 Page 7 modify plant design or operation and therefore creates no new accident modes.
3). Involve a significant reduction in a margin of safety. As discussed in 1) above, the new specification either provides explicit requirements which were previously implied or provides requirements to cover modes of operation previously not specifically addressed. Where the proposal restates explicitly previously implicit requirements, the margin of safety is unchanged since the actual requirement is unchanged. 'The Fermi 2 Noninterruptible Control Air System has unique design features in that the two subsystems can be cross-tied, and all required air uses can be supplied by a single air compressor. Studies using the Probabilistic Risk Assessment methodology have shown that operation with the two systems cross-tied present less risk than operation with no .
safety-gtact centrol air for one division. Recognizing these unique features in Teconical Specifications by specifying an appropriate allowable out-of-service time does not represent a reduction in the margin of safety.
Based on the above reasoning, Detroit Edison has determined that the proposed amendment does not involve a significant hazards consideration.
ENVIRONMENTAL IMPACT Detroit Edison has reviewed the proposed Technical Specification changes against the criteria of 10CFR51.22 for environmental considerations. The proposed changes do not involve a significant hazards consideration, nor significantly change the types or significantly increase the amounts of effluents that may be released ef fsite, nor significantly increase individual or cumulative occupational radiation exposures. Based on the foregoing Detroit Edison concludes that the proposed Technical Specifications do meet the criteria given in 10CFR51.22(c)(9) for a categorical exclusion from the requirement for an Environmental Impact Statement.
CONCLUSION Based on the evaluations above: 1) there is reasonable assurance that the health and safety of the public will not be endangered by '
operation in the proposed manner, and 2) such activities will be conducted in compliance with the Commission's regulations and proposed i amendments will not be inimical to the common defense and security or l to the health and safety of the public.