MONTHYEARNRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements NRC-93-0077, Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys1993-07-29029 July 1993 Application for Amend to License NPF-43.Amend Provides Updated Lab Testng Standard for Surveillance Testing of Activated Charcoal Samples from Control Room Emergency Filtration Sys NRC-93-0061, Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld1993-07-29029 July 1993 Application for Amend to License NPF-43,revising TS to Extend Instrument Calibr Intervals to 36 Months for Selected Instrumentation,Per BWROG Licensing Topical Rept NEDC-32160P,Dec 1992.GE Proprietary Rept Encl.Rept Withheld NRC-93-0078, Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers1993-07-29029 July 1993 Application for Amend to License NPF-43,changing TS 6.8.5.e to Provide Proper Refs to 10CFR20 as Result of New Section Numbers NRC-93-0062, Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements1993-05-24024 May 1993 Application for Amend to License NPF-43,changing Tech Specs Include Modification to Job Titles Following Mgt Reorganization,Changes to Onsite Review Organization Membership Description & Change to Overtime Requirements NRC-93-0038, Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys1993-05-24024 May 1993 Application for Amend to License NPF-43,modifying Leakage Testing Requirements for Primary Containment Isolation Valves in Injection Flow Paths of LPCI Mode of RHR Sys 1999-09-24
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217N4301999-10-25025 October 1999 Amend 17 to License DPR-9,revising TS by Deleting SR D.3.c, Which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0082, Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired1999-09-24024 September 1999 Application for Amend to License NPF-43,revising TS 3/4.6.1.8 to Allow Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired NRC-99-0072, Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement1999-09-10010 September 1999 Application for Amend to License NPF-43,revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement NRC-99-0078, Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included1999-08-25025 August 1999 Rev 14 to Application for Amend to License NPF-43,providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Brief Abstract of Changes Included in Rev & Revised Pages for Submittal & Rev Instructions,Included NRC-99-0048, Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl1999-07-30030 July 1999 Application for Amend to License NPF-43 to Change TS to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (Aprm).Draft TS Pages Encl NRC-99-0035, Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages1999-04-20020 April 1999 Application for Amend to License DPR-9 to Modify TS Section D.3.Amend Would Eliminate TS Surveillance Requirement for Ni Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex.With marked-up & Typed TS Pages ML20205Q7091999-04-15015 April 1999 Amend 16 to License DPR-9,allowing Possession of Nominal Amount of Special Nuclear Matl NRC-99-0025, Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.11999-03-23023 March 1999 Application for Amend to License NPF-43,modifying TS SR 4.4.1.1.1 to Require Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Once Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 ML20198S3271999-01-0606 January 1999 Amend 15 to License DPR-9,consisting of Changes to TS ML20154R2251998-10-21021 October 1998 Amend 13 to License DPR-9,allowing Access Control Flexibility,Establishing Compensatory Provisions Re PA Boundary,Eliminating Redundancy Between Ts,Revising Figure B-1 & Correcting Typos NRC-98-0122, Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl1998-09-28028 September 1998 Rev 1 to 980403 Application for Amend to License NPF-43, Proposing TS Change for Conversion to Improved Standard Ts. Revised Pages for Submittal & Brief Abstract of Changes, Encl NRC-98-0128, Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a1998-08-26026 August 1998 Rev to 980128 Application for Amend to License DPR-9, Revising TS to Implement Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits & Annual Reporting of 10CFR50.36a NRC-98-0117, Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals1998-07-23023 July 1998 Application for Amend to License NPF-43,revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals NRC-98-0044, Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci1998-07-17017 July 1998 Application for Amend to License DPR-9,allowing Util to Possess Special Nuclear Matl in Quantity Totaling No More than 15 Grams of U-235,U-233 or Pu,Or Any Combination Thereof,W/Pu Activity Totaling No More than 2 Ci NRC-98-0040, Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 9809041998-06-26026 June 1998 Application for Amend to License NPF-43,requesting to Allow one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20248L7981998-06-0505 June 1998 Application for Amend to License NPF-43,revising TS Section 2.1.2.Proprietary & non-proprietary Info,Encl.Proprietary Info Withheld NRC-98-0065, Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.11998-04-27027 April 1998 Application for Amend to License NPF-43,to Add Configuration Risk Mgt Program to TS Section 6.8.5,contingent on Approval of Previously Submitted License Amend for TS 3.8.1.1 NRC-98-0071, Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications1998-04-0909 April 1998 Application for Amend to License NPF-43,proposing Align Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation in Three Specifications NRC-98-0043, Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS1998-04-0303 April 1998 Application for Amend to License NPF-43 to Convert Current TS to Improved Ts.Meeting Is Requested to Discuss Review Schedule & Contents of Amend.Vol 1 Includes Application & Justification.Vols 2-13 Contain Improved TS NRC-98-0062, Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/41998-04-0202 April 1998 Application for Amend to License NPF-43,modifying Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433,Rev 1, STS GE Plants,BWR/4 NRC-98-0057, Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors1998-04-0202 April 1998 Application for Amend to License NPF-43,revising Requirements Associated W/Containment Oxygen & Hydrogen Monitors NRC-98-0033, Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray1998-03-27027 March 1998 Application for Amend to License NPF-43,eliminating Incorrect Descriptive Info Re Water Inventory in CST Reserved for Hpci/Rcic & Raising CST Min Water Level for Core Spray NRC-98-0034, Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned1998-03-27027 March 1998 Application for Amend to License NPF-43,revising Footnote Specifying Conditions Where Isolation Valves Associated W/ LPCI Sys Operation Are Repositioned NRC-98-0003, Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Tech Specs to Improve Administrative Controls Re thermal-hydraulic Stability & Idle Recirculation Loop Startup & Eliminating Neutron Flux Indication from TS NRC-98-0027, Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a1998-01-28028 January 1998 Application for Amend to License DPR-6,modifying Sections F & I of Plant TS to Include Requirements for Control of Effluents,Dose Limits & Annual Reporting Per 10CFR50.36a NRC-98-0006, Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements1998-01-28028 January 1998 Application for Amend to License NPF-43,changing Surveillance Interval in TS 4.4.3.2.2.a by Extending It from Current 18 Month Testing Interval to 24 Month Testing Interval to Be Consistent W/Asme Code Requirements NRC-98-0002, Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement1998-01-28028 January 1998 Application for Amend to License NPF-43,revising SRs for Div II Battery Sys to Agree W/Design of New Battery Replacement NRC-98-0008, Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed1998-01-28028 January 1998 Application for Amend to License NPF-43,revising Footnotes Specifying Conditions Under Which SRs Associated W/Ts 3/4.9.1, Reactor Mode Switch, Can Be Performed NRC-98-0023, Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor1998-01-28028 January 1998 Application for Amend to License DPR-9,allowing Util to Possess Contaminated Apparatus & Equipment & Radioactive Sources at Fermi 1 Containing Byproduct Matl Not Produced by Operation of Plant Reactor NRC-98-0025, Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access1998-01-28028 January 1998 Application for Amend to License DPR-9,changing TS on Access Control to Provide Flexibility While Maintaining Similar Controls Over Access NRC-97-0115, Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR1997-12-15015 December 1997 Application for Amend to License DPR-9,modifying Part 2.A in Order to Delete Reference to Six Letters Now Listed & Instead Refer to Encl Fermi 1 SAR NRC-97-0105, Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms1997-12-10010 December 1997 Application for Amend to License NPF-43,revising TS to Be Consistent W/Planned Replacement of Current Power Range Monitoring Portion of Existing Nms ML20211J1971997-09-29029 September 1997 Application for Amend to License NPF-43,relocating Selected Requirements & Associated Bases from TS to Ufsar.Rev of TS Index & List of Tables to Reflect Relocation Requested NRC-97-0107, Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing1997-09-0505 September 1997 Application for Amend to License NPF-43,adding Special Test Exception to Allow Unit to Remain in Operational Condition 4 W/Reactor Coolant Temps Greater than 200 F,But Less than 212 F,When Performing Inservice Leak & Hydrostatic Testing NRC-97-0037, Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR1997-06-20020 June 1997 Application for Amend to License NPF-43,relocating Surveillance Requirements for Reactor Recirculation Sys MG Set Scoop Tube Stop Setpoints to UFSAR NRC-97-0031, Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements1997-03-27027 March 1997 Application for Amend to License NPF-43,requesting Elimination of Selected Response Time Testing Requirements ML20133L6171997-01-0202 January 1997 Amend 11 to License DPR-9,allowing Certain Equipment & Instruments to Be Removed from Svc for Short Periods of Time Allowing for Maint,Testing,Insp & Account for Equipment Failures NRC-96-0134, Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability1996-12-0202 December 1996 Application for Amend to License NPF-43,modifying TS Section 3.1.4.3,Table 3.3.6-1 & Table 4.3.6-1 Re Rod Block Monitor Applicability ML20129F0611996-09-25025 September 1996 Application for Amend to License NPF-43,revising Tech Spec 4.8.4.3 Re Periodic Testing Requirement for Thermal Overload Protection Devices NRC-96-0075, Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value1996-09-0505 September 1996 Application for Amend to License NPF-43,changing SLMCPRs in TS 2.1.2 to Reflect Results of cycle-specific Calculation Performed for Plant Operating Cycle 6 Expected to Commence in 1996 & Deleting Specific SLMCPR Value NRC-96-0003, Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys1996-03-25025 March 1996 Application for Amend to License NPF-43,modifying Charcoal Testing Stds for Control Room Emergency Filtration Sys & Standby Gas Treatment Sys ML20095K4211995-12-21021 December 1995 Application for Amend to License NPF-43,incorporating 10CFR50,App J,Option B NRC-95-0124, Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.31995-11-22022 November 1995 Application for Amend to License NPF-43,modifying TS Action Statements 3.8.1.1.b & 3.8.1.1.d,SRs 4.8.1.1.2.a,4.8.1.1.3 & 4.8.1.2,Table 4.8.1.1.2-1 & Bases 3/4.8.1,3/4.8.2 & 3/4.8.3 NRC-95-0104, Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS1995-10-0202 October 1995 Application for Amend to License NPF-43,incorporating one- Time Deferral of Limited Aspects of SR 4.3.3.2,4.8.1.1.2.e. 4.b & 4.8.1.1.2.e.6.b Into Plant TS NRC-95-0096, Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals1995-09-20020 September 1995 Application for Amend to License NPF-43,revising TS Re Sys Testing,Instrumentation Calibr,Component Insp,Component Testing,Response Time Testing & Logic Sys Functional Tests to Allow one-time Extension of Surveillance Intervals NRC-94-0107, Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans1994-12-15015 December 1994 Application for Amend to License NPF-43,proposing Changes to Administrative Controls Section of Ts,Consistent W/Guidance in NUREG-1433 & GL 93-07, Mod of Ts...For Emergency & Security Plans NRC-94-0047, Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-081994-05-10010 May 1994 Application for Amend to License NPF-43,incorporating Changes to Ts,Removing Component Lists from TS Sections 3.6.3 & 3.8.4.3 Per GL 91-08 NRC-94-0027, Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-322911994-04-26026 April 1994 Application for Amend to License NPF-43,relocating Response Time Limit Tables from TS to Ufsar,In Response to GL 93-08 & BWROG Topical Rept NEDO-32291 NRC-93-0151, Application for Amend to License NPF-43 Re Reduced Testing During Power Operation1994-03-29029 March 1994 Application for Amend to License NPF-43 Re Reduced Testing During Power Operation NRC-93-0143, Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements1993-12-0909 December 1993 Application for Amend to License DPR-9,revising TS for Implementation of Revised 10CFR20 Requirements 1999-09-24
[Table view] |
Text
- - - - _ - - _ _ _ _ - _ - - - _ - - _ _ -- _ _
Dour,las R. Gipson r -; Senior Vice President, Nuclear G%eration Fermi 2 6400 North Dixie lluy., Newport, Michigan 48166 !
Teh 311MC.6201 Fax:311MG.4172 Detroit Edison l 10CFR50.92 l l
June 5,1998 NRC-98-0067 l
l l U. S. Nuclear Regulatory Commission l Attention: Document Control Desk Washington D C 20555-0001
Reference:
' Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Proposed Technical Specification Change (License Amendment)-
Safety Limit-Minimum Critical Power Ratio (MCPR)
Pursuant to 10CFR50.90, Detroit Edison hereby proposes to amend the Fermi 2 Plant Operating License NPF-43, Appendix A, Technical Specifications (TS), by l modifying Technical Specification Section 2.1.2. This application proposes to l
change the Minimum Critical Power Ratio Safety Limits (SLMCPRs) in Technical Specification (TS) 2.1.2 to reflect results of a cycle-specific calculation performed l for Fermi 2 operating Cycle 7, and to update the footnote associated with the
! SLMCPR values to limit the applicability of the SLMCPR walues to only Cycle 7 operation.
Enclosure 1 provides a description and evaluation of the proposed TS change.
Enclosure 2 provides an analysis of the issue of significant hazards consideration l using the standards of 10CFR50.92. Enclosure 3 provides the marked up pages of the existing TS to show the proposed change and a typed version of the affected TS l pages with the proposed changes incorporated. The General Electric Nuclear Energy i (GENE) document provided as Attachment 1 contains additional information regarding the Cycle 7 SLMCPR analysis, including a comparison of the Fermi 2 Cycle 7 SLMCPR to the generic gel 1 SLMCPR. Some of the infonnation l contained in the document is considered GE proprietary information and should be withheld from public disclosure in accordance with 10CFR9.17(a)(4) and
( 10CFR2.790(a)(4). An affidavit attesting to this fact is provided as Attachment 2. A l
non-proprietary version of the GE document is provided as Attachment 3.
LCM I N_.s 90 i
l 9906110364 990605
-n A hoe <*g g f[),y ; g,,) o N/,
POR ADOCK 05000341 p A Dm:ncrg Company P PDR f
_ _ _ _ _ _ ____= - _ ________ - _ _ - ______-_ - _ _ _-_____-___
USNRC NRC-98-0067 Page 2 Detroit Edison has reviewed the proposed TS changes against the criteria of 10CFR51.22 for environmental considerations. The proposed changes do not involve a significant hazards consideration, nor significantly change the types or significantly increase the amounts of effluents that may be released offsite, nor significantly increase individual or cumulative occupational radiation exposures.
Based on the foregoing, Detroit Edison concludes that the proposed TS changes meet the criteria provided in 10CFR51.22(c) (9) for a categorical exclusion from the requirements for an Environmental Impact Statement or an Environmental Assessment.
Based on the refueling outage schedule, Detroit Edison requests issuance of the proposed license amendment by September 14,1998. In order to allow time for procedure revision and orderly incorporation into copies of the Technical Specifications, Detroit Edison requests that the proposed license amendment, once approved by the NRC, be issued with a requirement for implementation prior to startup of Fermi 2 following Refueling Outage 6.
Should you have any questions or require additional information, please conta::t Mr. Norman K. Peterson of my staff at (734) 586-4258.
Sincerely, ,
Enclosures Attachments cc: B. L. Burgess
- G. A. Harris A. J. Kugler Regional Administrator,RegionIII Supervisor, Electric Operators, l - Michigan Public Service Commission L
l1_ _ _ _ _ _ _ _ _ _ _ _ _ . _
i
- : USNRC NRC-98-0067 l l
Page 3 '
1 l
I, DOUGLAS R. GIPSON, do hereby affirm that the foregoing statements are based l on facts and circumstances which are true and accurate to the best ofmy knowledge and belief.
l DOUGLAS R."GIPSON Senior Vice President, Nuclear Generation On this day of DC 1998 before me personally appeared Douglas R. Gipson, being firstfuly sworn and says that he executed the foregoing as his free act and deed.
i I
LJ1/u -
Notary Public W
j ROSAUE A. AIMTTA ggutyPuguC MONRDECO'ATY,Mi egynnemamanEllMRE81W11A10 l
l 1
l l
1
Attachment 2 to NRC-98-0067 Page1 l
ATTACHMENT 2 i GENERAL ELECTRIC NUCLEAR ENERGY AFFIDAVIT REGARDING WITHHOLDING FROM PUBLIC DISCLOSURE l
l l
l l
l
___-_-.m._ -__m___
O V
GE Nuclear Energy GeneralEkctnc Company P. O. Box 700, WWnington, NC 28402 Affidavit I, Glen A. Watford, being duly sworn, depose and state as follows:
(. (1) I am Manager, Nuclear Fuel Engineering, General Electric Company ("GE")'and have been delegated the function of reviewing the information described :n paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
[ (2) The information sought to be withheld is contained in the Attachment to the letter from D. R.
i Gipson (DliCO) to United States ' Nuclear Regulatory Commission, Proposed Technical Specification Cnatige (License Amendment)- Safety Limit - Minimum Critical Power Ratio
- (MCPR), letter number NRC-98-0067.
(3) In making this application for withholoog, of proprietary information of which it is the owner, l_
- GE relics upon the exemption from disclosure set forth ii the Freedom of Information Act
("FOIA"), 5 USC Sec. 552(b)(4), and the Trade Secrets Act,18 USC Sec.1905, and NRC regulations 10 CFR 9.17(a)(4) and 2.790(a)(4) for " trade secrets and commercial or financial information obtained from a person and privileged or confidential" (Exemption 4). The material fer .which extmption from disclosure is here sought is all " confidential commercial information," and some portions also qualify under the nar~awer definition of" trade secret,"
within the meanings assigned to those terms for purposes of FOIA Exemption 4 in, respectively, Critical Mass Enerav Project v. Nuclear Regulatory Commission. 975F2d871 (DC Cir.1992),
and Public Citizen Health Research Groun v. FDA,704F2dl280 (DC Cir.1983).
(4) Some exatoples of categories of information which fit into the definition of proprietary infc-ma+. on are:
l a. . Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its.use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;
- b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product;
- e. Information which reveals cost or price information, production capacities, budget levels, or commercial strategies of General Electric, its customers, or its suppliers; di Information which reveals aspects of past, present, or future General Electric customer-funded development plans and programs, of potential commercial value to General Electric;
- c. Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
Page1
_:_____=_.__________ ____
Affidavit The information sought to be withheld is considered to be proprietary for the reasons set forth in both paragraphs (4)a. and (4)b., above.
(.,, ..s information sought to be withheld is being submitted to NRC in confidence. The information is of a sort customarily held in confidence by GE, and is in fact so held. Its initial designation as proprietary information, and the subsequent steps taken to prevent its unauthorized disclosure, are as set forth in (6) and (7) folicwing. The information sought to be withheld has, to the best of my knowledge and belief, consistently been held in confidence by GE, no public disclosure has been made, and it is not available in public sources. All disclosures to third parties including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or proprietary agreements which provije for maintenance of the information in confidence.
(6) Initial approval of proprietary treatment of a document is made by the manager of the originating component, the person most likely to be acquainted with the value and sensitiv;ity of the information in relation to industry knowledge. Access to such documents within GE is limited on a "need to know" basis. J
' (7) He procedure for approval of external release of such a document typically requires review by the staff manager, project manager, principal scientist or other equivalent authority, by the manager of the cognizant marketing function (or his delegate), and by the Legal Operation, for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside GE are limited to regulatory bodies, customers, and potentiai customers, and their agents, suppliers, and licensces, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or proprietary I agreements.
(8) The information identified in paragraph (2) is classified as proprietary because it contains details of GE's Safety Limit analysis and the corresponding results which GE has applied to actual core designs with GE's fuel.
- De development of the methods used in these analysis, along with the testing, development and approval of the supporting critical power correlation was achieved at a significant cost, on the order of several million dollars, to GE.
(9) Public disclosure of the information sought to be withheld is likely to cause substantial harm to j GE's, competitive position and foieclose or reduce the availability of profit-making opportunities. The stability analysis is part of GE's comprehensive BWR safety and tect nology base, and its commercial value extends beyond the originC development cost. The value of the i technology base goes beyond the extensive physical database and analytical methodology and I includes development of the expertise to determine and apply the appropriate evaluation !
process. In addition, the technology base inc!udes the value derivea from providing analyses
]
done with NRC-approved methods.
The research, development, engineering, analytical, and FRC review costs comprise a ;
substantial investment of time and money by GE.
The precise value o' the expertise to devise an evaluation process and apply the correct I analytica! methodology is difficult to quantify, but it clearly is substantial.
- GE's competitive advantage will be lost ifits competitors are able to use the resuhs of the GE experience to normalize or verify their own process er if they are able to claim en equivalent understanding by demonstrating that they can arrive at the saue or similar conclusions.
C WERMBCycle 7Aaloed Licensmg\nmdavit doc
.Unge 2
. Affidavit The value of this information to GE would be lost if the information were disclosed to the public. Making such information available to competitors without their having been required to undertake a similar expendir.ure of resources would unfairly provide competitors with a windfall, and deprive CE of the opportunity to exercise its cernpetitive advantage to seek an adequate retuni on its large investmeat in developing these very valuable analytical tools.
l l State of North Carolina ) gg, County of New llanover )
Glen A. Watford, being duly sworn, deposes and says:
That he has read the foregoing affidavit and the matters stated therein are true and correct to the best of his knowledge, information, and belief.
O Executed at Wilmingtori, North Carolina, this day of M. ,19 N f f Glen A. , afford General :lectric Company Subscribed and sworn before me this M/,,gday of T} b , _ ,19Y r
~
)
Notary Public, State of North Carolina My Commission Expires A.1#-4#/
C if ERMTfycle 7Jimioad ' 6cenomg's/Navd tks :
Page.: 3
. Enclosure I to NRC-98-0067 Page1 ENCLOSURE 1 FERMI 2 NRC DOCKET NO. 50-341 OPERATING LICENSE NO. NPF-43 REQUEST TO REVISE TECHNICAL SPECIFICATIONS:
TIIERMAL POWER,liigh Pressure and Iligh Flow DESCRIPTION AND EVALUATION OF THE PROPOSED CIIANGES P -
l I
l- ..
. Enclosure I to NRC-98-0067 Page 2 DESCRIPTION AND EVALUATION OF l
THE PROPOSED CHANGE (S)
DESCRIPTION:
The proposed change involves revising the SLMCPR values specified in Detroit Edison Fermi 2 TS Section 2.1.2 for two recirculation loop operation from 1.09 to 1.11 and for single loop operation from 1.11 to 1.13, and update the associated footnote which limits the applicability of the values to Cycle 7 operation only.
On November 5,1996, the NRC approved Amendment No.109 to the Facility Operating License for the Fermi 2 facility. This amendment revised the SLMCPR values specified in TS Section 2.1.2 from 1.07 to 1.09 for two recirculation loop operation and from 1.08 to 1.11 for single loop operation based upon a plant / cycle specific analysis performed by General Electric assuming a mixed core of gel 1, GE9B, and GE6 fuel which was loaded for Fermi.2 Cycle 6. Because the new SLMCPR values were based upon a cycle specific analysis for Fermi 2 Cycle 6, the approval of the new SLMCPR values was limited to Cycle 6 operation by inclusion of a footnote to the SLMCPR value.
Prior to 1996, General Electric Report NEDE-24011-P-A-11, " General Electric Standard Application for Reactor Fuel (GESTAR II)" stipulated that the SLMCPR for a new fuel design be performed for a large, high power density plant assuming a bounding equilibrium reactor core. The generic SLMCPR for the gel 1 fuel type was determined, according to this specification, and found to be 1.07. In March 1996 it was discovered that the SLMCPR calculated on a generic basis with the GE methodology may be non-conservative when applied to some actual core and fuel designs This was the subject of a 10 CFR Part 21 notification for General Electric dated May 24,1996. Plant / cycle specific SLMCPR analyses now are used to confirm the calculated SLMCPR value on a plant / cycle-specific basis using the uncertainties defined in NEDE-31152-P, Revision 6," General Electric Fuel Bundle Designs."
General Electric's calculation of the plant-specific SLMCPR values for Fermi 2 Cycle 7 was performed based upon NRC approved methods (General Electric Standard Application for Reactor Fuel, NEDE-24011-P-A-13 and U. S. Supplement NEDE-24011-P-A-13-US, August 1996) and interim implementing procedures which have been discussed between General Electric Nuclear Energy (GENE) and
- the NRC during their meetings with the NRr staff on April 17,1996 and May 6 l through 10,1996. The implementing procedures are identical to those used for similar recent analyses (Dockets 50-341,50-324,50-325,50-298,50-277, et al3 and
( are described in GENE's proposed Amendment 25 to GESTAR II (R. J. Reda (GE) l to T. E. Collins (NRC), Proposed Amendment 25 to GE Licensing Topical Report NEDE-24011-P-A (GESTAR II) on Cycle-Specific MCPR, December 13,1996).
Enciosure 1 to NRC-98-0067 Page 3 This calculation resulted in a calculated Cycle 7 SLMCPR value of 1.11 for two recirculation loop operation and 1.13 for single loop operation. The General Electric document provided as Attachment I contains additional information regarding the j Cycle 7 SLMCPR analysis, including a comparison of the Fermi 2 Cycle 7 SLMCPR l
to the generic gel 1 SLMCPR. Some of the information contained in the document is considered GE propr:etary information and should be withheld from public disclosure in accordance with 10 CFR 9.17(a)(4) and 10 CFR 2.790(a)(4). An affidavit attesting to this fact is provided as Attachment 2. A non-proprietary version of the GE document is provided as Attachment 3.
Until the NRC approves GE Report NEDE-24011-P-A(GESTAR II)," General Electric Standard Application for Reactor Fuel (GESTAR II)", Amendment 25, the proposed SLMCPR values should be limited to Cycle 7. To accommodate this, the footnote to TS 2.1.2 is being updated to limit the applicability of the SLlV"PR values to only Cycle 7 operation.
Therefore, Detroit Edison proposes that tne Fermi 2 Plant TS Section 2.1.2 be revised to rerect the change in the SLMCPRs and to update the associated footnote.
EVALCATION OF THE PROPOSED CIIANGE(S):
The proposed TS change will revise the Technical Specifications to reflect the change in the SLMCPRs due to the plant specific evaluation performed by GENE for rermi 2, Cycle 7. The new SLMCPRs were calculated using NRC approved methods (General Electric Standard Application for Reactor Fuel, NEDE-24011-P-A-13 and U. S. Supplement NEDE-24011-P-A-13-US, August 1996) and technical design procedures as discussed during GENE meetings with the NRC on April 17, 1996 and May 6 through 10,1996.
The Fuel Cladding Integrity Saf-ty Limit is set such that no mechanistic fuel damage is calculated to occur if the limit is not violated. Since the parameters which result in fuel damage are not directly observable during reactor operation, the thermal and hydraulic conditions resulting in a departure from nucleate boiling have been used to mark the beginning of the region where fuel damage could occur. Although it is recognized that a departure from nudeate boiling would not necessarily result in damage to BWR fuel rods, the critical power at which boiling transition is calculated to occur had been adopted as a convenient limit. However, the uncertainties in monitoring the core operating state md in the procedmes used to calculate the critical power result in an uncertainty in the value of the critical power. Therefore, the Fuel Cladding Integrity Safety Limit is defined as the CPR in the limiting fuel assembly for which more than 99.9% of the fuel rods in the core are expected to avoid boiling transition considering the power distribution within the core and all uncertainties.
The new SLMCPRs for Fermi 2 Cycle 7 were calculated to be 1.11 and 1.13 (single loop operation).
.- : Enclosure 2 to NRC-98-0067 Page 1 0
4 h
ENCLOSURE 2 FERMI 2 NRC DOCKET NO. 50-341 OPERATING LICENSE NO. NPF-43 j J '
REQUEST TO REVISE TECIINICAL SPECIFICATIONS: j
)
10CFR50.92 SIGNIFICANT IIAZARDS CONSIDERATION l
l t
l l
l l
4 l
1 1
I l ,
. Erclosure 2 to NRC-98-0067 Page 2 l
l .
10CFR50.92 SIGNIFICANT HAZARDS CONSIDERATION BASIS FOR SIGNIFICANT HAZARDS DETERMINATION l
l In accordance with 10CFR50.92, Detroit Edison has made a determination that the proposed amendment involves no significant hazards consideration. The proposed Technical Specification (TS) changes described above do not involve a significant hazards consideration for the following reasons:
- 1. The proposed chwge does not involve a significant increase in the probability or consequences of an accident previously evaluated.
t The proposed license amendment establishes a revised SLMCPR value of 1.11 for two recirculation loop operation and 1.13 for single recirculation loop operation for use during Cycle 7 operation. The derivation of the cycle-specific SLMCPRs was performed using '-General Electric Standard Application for Reactor Fuel," NEDE-24011-P-A-13; U. S. Supplement, NEDE-24011-P-A US, August 1996; and the " Proposed Amendment 25 to GE Licensing Topical Report NEDE-24011-P-A (GESTAR II) on Cycle Specific Safety Limit MCPR."
Amendment 25 was submitted by General Electric Nuclear Energy (GENE) to the NRC on December 13,1996.
The probability of an evaluated accident is derived from the probabilities of the individual precursors to that accident. The consequences of an evaluated accident are determined by the operability of plant systems designed to mitigate those consequences. Limits have been established, consistent with NRC approved methods, to ensure that fuel performance during normal, transient, and accident conditions is acceptable.
The probability of an evaluated accident is not increased by revising the SLMCPR values. The change does not require any physical plant modifications or physically affect any plant components. Therefore, no individual precursors of an accident are affected.
The proposed license amendment establishes a revised SLMCPR that ensures that the fuel is protected during normal operation and during any plant transients or anticipated operational occurrences. Specifically, the reload analysis
! demonstrates that a SLMCPR value of 1.11 (1.13 for single loop operation) l ensures that less than 0.1 percent of the fuel rods will experience boiling transition during any plant operation if the limit is not violated.
j ,
Based on (1) the determination of the new SLMCPR values using conservative methods, and (2) the operability of plant systems designed to mitigate the
. Enclosure 2 to l E NRC-98-0067 Page 3 l-consequences of accidents not having been changed; the consequen:es of an i accidem previously evaluated have not been increased.
Additionally, updating of the footnote on the SLMCPR value in Tecimical Specification 2.1.2 to limit the applicability of the SLMCPR values so only Cycle ;
7 operation will not increase the probability or consequences of accidems j previously evaluated. The updating of the footnote on the SLMCPR value in !
Technical Specification 2.1.2 is an administrative change the.t has no effect on the probability or consequences of accidents previously evaluated.
l Therefore, the proposed TS change does not involve an increase in the probability or consequences of an accidem previously evaluated.
- 2. The proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
l ' The proposed license amendment involves a revision of the SLMCPR from 1.09 to 1.11 for two recirculation loop operation and from 1.11 to 1.13 for single loop ;
operation based on the results of analysis of the Cycle 7 core using the same fuel
']
types as in previous cycles, and updating of the footnote on the SLMCPR values l in TS 2.1.2. Creation of the possibility of a new or different kind of accident would require the creation of one or more new precursors of that accident. New accident precursors may be created by modifications of the plant configuration, including changes in the allowable metho ' ifoperating the facility. This l
proposed license amendment does not int se any modifications of the plant configuration or changes in the allowable methods of operation. Therefore, the y proposed TS change does not create the possibility of a new or different kind of )
accident from any accident previously evaluated, i
- 3. The change does not involve a significant reduction in the margin of safety.
The proposed license amendment. establishes a revised SLMCPR value of 1.11 for two recirculation loop operation and 1.13 for single recirculation loop operation for use during Cycle 7 operation. The derivation of the cycle-specific L SLMCPRs was performed using " General Electric Standard Application for Reactor Fuel," NEDE-24011-P-A 13; U. S. Supplement, NEDE-24011-P-A US; August 1996; and the "Propoxd Amendment 25 to GE Licensing Topical l Report NEDE-24011-P-A (GESTAR II) on Cycle-Specific Safety Limit MCPR."
L Amendment 25 was submitted by General Electric Nuclear Energy (GENE) to the NRC on December 13,1996. Use of these methods ensures that the resulting SLMCPR satisfies the fuel design safety criteria that 'ess than 0.1 percent of the fuel rods experience boiling transition if the safety limit is not violated. Based on L the assurance that the fuel design safety criteria will be met, the proposed license amendment does not involve a significant reduction in a margin of safety.
L_._...._...._____ ___ _ _ _ . _ _ _ _ - . _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- Endosure 2 to NRC-9F-0067 Page 4 s,p
- y j i ?- ' Additionally, updating of the kotnote on the SLMCPR value in TS 2.1.2 will not j, decrease the maryn of safety for accidents previously evaluated. The updating m ,
c of the footnote on the SLMCPR value in Technical Specification 2.1.2 is an adnumstranve change that does not reduce the margin of safety.