MONTHYEARNRC-17-0067, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-08-31031 August 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. Project stage: Request NRC-18-0019, Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-0404 April 2018 Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. Project stage: Response to RAI NRC-18-0032, Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-05-17017 May 2018 Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Response to RAI NRC-18-0040, Supplemental Information in Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-06-27027 June 2018 Supplemental Information in Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Supplement NRC-18-0045, Response to NRC Requests for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-08-0707 August 2018 Response to NRC Requests for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Response to RAI ML18247A4522018-09-17017 September 2018 Issuance of Amendment Revision to Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF 542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC No. MG0208; EPID L-2017-LLA-0282) Project stage: Approval 2018-05-17
[Table View] |
Similar Documents at Fermi |
---|
Category:Letter type:NRC
MONTHYEARNRC-24-0057, Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report2024-09-0303 September 2024 Update to NRC 24-0041: Technical Specification (TS) 5.6.7 – Post Accident Monitoring Report NRC-24-0053, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 20242024-08-30030 August 2024 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30, 2024 NRC-24-0050, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2024-08-12012 August 2024 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-24-0048, Submittal of Inservice Inspection Summary Report2024-08-0606 August 2024 Submittal of Inservice Inspection Summary Report NRC-24-0046, Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance2024-07-25025 July 2024 Fenni 2 Power Plant - Approval of the National Pollutant Discharge Elimination System Permit Application for Reissuance NRC-24-0020, Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan2024-07-24024 July 2024 Submittal of Revision 51 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-24-0044, Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License)2024-07-10010 July 2024 Enrico Fermi 1 License Expiration - 10 CFR 50.51 (Continuation of License) NRC-24-0041, Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report2024-06-21021 June 2024 Technical Specification (TS) 5.6.7 - Post Accident Monitoring Report NRC-24-0042, Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data2024-06-18018 June 2024 Regulat01y Issues Summaty (RIS) 24-01 Preparation and Scheduling of Operator Licensing Examinations to Submit Fonn 536, Operator Licensing Examination Data NRC-24-0040, Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-00332024-06-0606 June 2024 Verification of No Significant Hazards Considerations for License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance Supplement Provided in NRC-24-0033 NRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0035, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications NRC-24-0025, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 NRC-24-0017, 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report and 2023 Radiological Environmental Operating Report NRC-24-0032, Transmittal of the Core Operating Limits Report for Cycle 232024-04-25025 April 2024 Transmittal of the Core Operating Limits Report for Cycle 23 NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter NRC-24-0018, 2023 Annual Non-Radiological Environmental Operating Report2024-04-0909 April 2024 2023 Annual Non-Radiological Environmental Operating Report NRC-24-0015, Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report2024-03-31031 March 2024 Enrico Fermi Atomic Power Plant, Unit 1, Decommissioning Funding Status Report NRC-24-0001, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion2024-03-21021 March 2024 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, TSTF-439, Rev. 2, Eliminate Second Completion NRC-24-0019, Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report2024-03-14014 March 2024 Submittal of 2023 Safety Relief Valve Challenge Report, Main Steam Bypass Lines Report, and ECCS Cooling Performance Evaluation Model Changes or Errors Report NRC-24-0023, NRC-24-0023, Post Exam Package Submittal Letter to NRC2024-03-0707 March 2024 NRC-24-0023, Post Exam Package Submittal Letter to NRC NRC-24-0008, Levels and Sources of Property Insurance Coverage2024-02-15015 February 2024 Levels and Sources of Property Insurance Coverage NRC-24-0009, Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 22024-02-0606 February 2024 Request for NRC to Suspend Regulatory Audit of License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance for Fermi Unit 2 NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-24-0007, Report of Changes to Quality Assurance Program for Radioactive Material Packages2024-01-12012 January 2024 Report of Changes to Quality Assurance Program for Radioactive Material Packages NRC-23-0079, Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 222023-12-14014 December 2023 Transmittal of Revision 1 of the Core Operating Limits Report for Cycle 22 NRC-23-0077, Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan2023-12-0404 December 2023 Submittal of Revision 50 to the Fermi 2 Radiological Emergency Response Preparedness Plan NRC-23-0075, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation2023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notification Implementation NRC-23-0073, Guarantee of Payment of Deferred Premiums2023-11-29029 November 2023 Guarantee of Payment of Deferred Premiums NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0068, Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-09-28028 September 2023 Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0064, Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-09-11011 September 2023 Additional Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0057, Independent Spent Fuel Storage Installation Cask Registration2023-08-31031 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0054, Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 20232023-08-31031 August 2023 Enrico Fermi Atomic Power Plant, Unit 1, Annual Report for Period Ending June 30 2023 NRC-23-0056, Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval2023-08-31031 August 2023 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0060, Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Supplemental Information to Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0053, Independent Spent Fuel Storage Installation Cask Registration2023-08-23023 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0050, Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-10010 August 2023 Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0048, Independent Spent Fuel Storage Installation Cask Registration2023-08-0101 August 2023 Independent Spent Fuel Storage Installation Cask Registration NRC-23-0049, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-07-24024 July 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0043, Independent Spent Fuel Storage Installation, Cask Registration2023-06-27027 June 2023 Independent Spent Fuel Storage Installation, Cask Registration NRC-23-0020, License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance2023-06-13013 June 2023 License Amendment Request for a Risk Informed Approach to ECCS Strainer Performance NRC-23-0039, Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-06-0606 June 2023 Request for Enforcement Discretion for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0029, Snubber Program for the Fourth 10-Year Testing Interval2023-06-0505 June 2023 Snubber Program for the Fourth 10-Year Testing Interval NRC-23-0030, Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval2023-06-0505 June 2023 Inservice Inspection-Nondestructive Examination (ISI-NDE) Program for the Fourth 10-Year Inspection Interval NRC-23-0037, 56542-EN 56542 - Fermi2023-05-26026 May 2023 56542-EN 56542 - Fermi 2024-09-03
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARNRC-24-0033, DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-05-30030 May 2024 DTE Electric Company - Final Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0027, Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance2024-04-24024 April 2024 Partial Response to Request for Additional Information for License Amendment Request Regarding Risk Informed Approach to Performance ECCS Strainer Performance NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122024-01-12012 January 2024 Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating2023-10-13013 October 2023 Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.122023-10-12012 October 2023 Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..2023-08-30030 August 2023 Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. NRC-23-0059, Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS)2023-08-25025 August 2023 Response to Request for Additional Information Exigent License Amendment Request for Technical Specification 3.7.2,Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink (UHS) NRC-23-0031, Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements2023-05-16016 May 2023 Response to NRC Request from Audit of License Amendment Request to Revise Technical Specification 3.8.1, AC Sources -Operating,' Emergency Diesel Generator Voltage and Frequency Surveillance Requirements NRC-21-0045, Response to Request for Additional Information Regarding License Amendment Request to Revise the Fermi 2 Technical Specifications2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Revise the Fermi 2 Technical Specifications NRC-21-0032, Response to Request for Additional Information Regarding Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval2021-07-0101 July 2021 Response to Request for Additional Information Regarding Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval NRC-21-0007, Response to Request for Additional Information Regarding Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval2021-05-27027 May 2021 Response to Request for Additional Information Regarding Revised Relief Request RR-A39 for the Fourth Ten-Year Inservice Inspection Interval NRC-20-0077, Response to Request for Additional Information Regarding Exemption from the Annual Force on Force Training Requirements of 10 CFR 73, Appendix B, Section VI, Due to the COVID-19 Public Health Emergency2020-12-0303 December 2020 Response to Request for Additional Information Regarding Exemption from the Annual Force on Force Training Requirements of 10 CFR 73, Appendix B, Section VI, Due to the COVID-19 Public Health Emergency NRC-20-0057, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2020-09-11011 September 2020 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle NRC-20-0046, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Fermi 2 Spent Fuel Storage Racks2020-07-30030 July 2020 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Utilize Neutron Absorbing Inserts in Criticality Safety Analysis for Fermi 2 Spent Fuel Storage Racks NRC-19-0084, Response to Request for Additional Information Regarding Inservice Testing Program Relief Request VRR-006 for the Fourth 10-Year Interval2019-12-0606 December 2019 Response to Request for Additional Information Regarding Inservice Testing Program Relief Request VRR-006 for the Fourth 10-Year Interval NRC-19-0039, Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation2019-06-18018 June 2019 Response to NRC Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation NRC-19-0045, Response to Request for Additional Information Regarding Snubber Program Relief Request RR-S1 for the Fourth 10-Year Interval2019-06-12012 June 2019 Response to Request for Additional Information Regarding Snubber Program Relief Request RR-S1 for the Fourth 10-Year Interval NRC-19-0042, Responses to Requests for Additional Information Regarding Relief Requests for the Inservice Inspection Program Fourth Ten-year Interval2019-06-11011 June 2019 Responses to Requests for Additional Information Regarding Relief Requests for the Inservice Inspection Program Fourth Ten-year Interval NRC-18-0045, Response to NRC Requests for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-08-0707 August 2018 Response to NRC Requests for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NRC-18-0040, Supplemental Information in Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-06-27027 June 2018 Supplemental Information in Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NRC-18-0032, Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-05-17017 May 2018 Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control NRC-18-0019, Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2018-04-0404 April 2018 Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. NRC-18-0015, Response to Request for Additional Information (Set 1) Regarding License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1.2018-02-27027 February 2018 Response to Request for Additional Information (Set 1) Regarding License Amendment Request to Revise Technical Specifications to Eliminate Main Steam Line Radiation Monitor Reactor Trip and Primary Containment Isolation System Group 1. NRC-18-0014, Response to Request for Additional Information Regarding Relief Request No. RR-A37, Revision 1, for the Inservice Inspection Program Third 10-Year Interval2018-02-0606 February 2018 Response to Request for Additional Information Regarding Relief Request No. RR-A37, Revision 1, for the Inservice Inspection Program Third 10-Year Interval NRC-18-0001, DTE Energy Company - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification Section 3.7.22018-01-0808 January 2018 DTE Energy Company - Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification Section 3.7.2 NRC-17-0036, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation2017-03-30030 March 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications for Emergency Core Cooling System Instrumentation and Reactor Core Isolation Cooling System Instrumentation NRC-16-0067, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-12-0909 December 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident NRC-16-0049, Response to Request for Additional Information Regarding License Amendment Request to Revise Integrated Leak Rate Test - Type a and Type C Test Intervals2016-08-11011 August 2016 Response to Request for Additional Information Regarding License Amendment Request to Revise Integrated Leak Rate Test - Type a and Type C Test Intervals NRC-16-0042, Response to NRC Request for Additional Information Regarding Environmental Review of the License Renewal Application, Severe Accident Mitigation Alternatives Sensitivity Analysis2016-07-19019 July 2016 Response to NRC Request for Additional Information Regarding Environmental Review of the License Renewal Application, Severe Accident Mitigation Alternatives Sensitivity Analysis NRC-16-0038, Response to Request for Additional Information Regarding Revised Relief Request PRR-007 for the Inservice Testing Program Third 10-Year Interval2016-06-23023 June 2016 Response to Request for Additional Information Regarding Revised Relief Request PRR-007 for the Inservice Testing Program Third 10-Year Interval NRC-16-0021, Supplemental Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 17 RAI 4.3.3-12016-03-10010 March 2016 Supplemental Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 17 RAI 4.3.3-1 NRC-16-0003, Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 382016-02-0101 February 2016 Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 38 NRC-16-0004, Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Response to Request for Additional Information2016-01-20020 January 2016 Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) and Response to Request for Additional Information NRC-15-0089, Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 372015-09-24024 September 2015 Response to NRC Request for Additional Information for the Review of License Renewal Application - Set 37 NRC-15-0083, Supplemental Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 332015-08-20020 August 2015 Supplemental Response to NRC Request for Additional Information for the Review of the License Renewal Application - Set 33 NRC-15-0077, Response to Request for Additional Information (RAI) Regarding the License Amendment Request to Revise the Emergency Action Level (EAL) Scheme for the Emergency Plan2015-07-28028 July 2015 Response to Request for Additional Information (RAI) Regarding the License Amendment Request to Revise the Emergency Action Level (EAL) Scheme for the Emergency Plan NRC-15-0066, Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 332015-07-0606 July 2015 Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 33 2024-05-30
[Table view] |
Text
Keith J. Polson Senior Vice President and CNO DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.6515 Fax: 734.586.1431 Email: keith.polson@dteenergy.com August 7, 2018 NRC-18-0045 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control
References:
- 1) DTE Electric Letter to NRC, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, NRC-17-0067, dated August 31, 2017 (ML17243A422)
- 2) DTE Electric Letter to NRC, Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, NRC-18-0019, dated April 4, 2018 (ML18094A165)
- 3) DTE Electric Letter to NRC, Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, NRC-18-0032, dated May 17, 2018 (ML18138A149)
- 4) DTE Electric Letter to NRC, Supplemental Information in Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, NRC-18-0040, dated June 27, 2018 (ML18178A134)
USNRC NRC-18-0045 Page 2 In Reference 1, DTE Electric Company (DTE) submitted a license amendment request (LAR) to replace existing Technical Specifications (TS) requirements related to "operations with a potential for draining the reactor vessel" (OPDRVs) with new requirements on Reactor Pressure Vessel Water Inventory Control (RPV WIC) to protect Safety Limit 2.1.1.3. In Reference 2, DTE sent a response to a NRC email request for additional information (RAI) from Ms. Sujata Goetz to Mr. Jason Haas dated March 6, 2018 along with supplemental information in support of the LAR. In Reference 3, DTE sent a response to a NRC email RAI from Ms. Sujata Goetz to Mr.
Jason Haas dated May 9, 2018. Subsequent to this submittal, supplemental information was identified related to the Reference 3 response. The supplemental information for the RAI response was provided in Reference 4. A RAI from the NRC was sent by email dated July 25, 2018 from Ms. Sujata Goetz to Mr. Jason Haas.
DTE's response to the RAI is provided in Enclosure 1. to this letter provides the existing TS pages marked to show the proposed changes. Enclosure 3 provides revised (clean) TS pages. Enclosure 4 provided the existing TS Bases pages marked to show the proposed changes for information only.
No new commitments are being made in this submittal.
Should you have any questions or require additional information, please contact Mr. Scott A. Maglio, Manager - Nuclear Licensing, at (734) 586-5076.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 7, 2018 Keith J. Polson Senior Vice President and CNO
Enclosures:
- 1. Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, "Reactor Pressure Vessel Water Inventory Control"
- 2. Proposed Technical Specification Changes (Mark-Up)
- 3. Revised Technical Specification Pages (Clean)
- 4. Proposed Technical Specification Bases Changes (Mark-Up)
(For Information Only)
USNRC NRC-18-0045 Page 3 cc: NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 5, Region III Regional Administrator, Region III Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)
Enclosure 1 to NRC-18-0045 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control to NRC-18-0045 Page 1 By letter dated August 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17243A422), DTE Electric Company (DTE or the licensee),
submitted a license amendment request (LAR) to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2, ML16074A448 which changes the technical specifications (TS) for Fermi 2. Your application was also supplement by letter dated April 4, 2018 (ADAMS Accession No. ML18094A165),
May 17, 2018 (ADAMS Accession No. ML18138A149) and June 27, 2018 (ADAMS Accession No. ML18178A134).
RAI EICB-4 In Enclosure 2 of the LAR, the licensee proposed to adopt TS 3.3.5.3 Condition D (equivalent to TSTF-542 Standard Technical Specification (STS) 3.3.5.2 Condition D), which requires that an inoperable instrumentation channel be restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. It would apply to the manual initiation functions for core spray (CS) and low pressure coolant injection (LPCI) subsystem.
The licensee stated in its letter dated April 4, 2018, in response to RAI EICB -2:
Fermi 2 does not have the capability to actuate an entire subsystem of or LPCI by a single manual pushbutton, as described in the response to [question number] RAI EICB-1. Instead, a CS or LPCI subsystem is actuated by manually controlling each individual component of that subsystem in accordance with approved plant procedures. In this context, the phrase manual initiation channel in the proposed TS Bases page B 3.3.5.3-3 is used to collectively describe all of the individual components required to manually initiate a subsystem and is not intended to imply that pushing one or two buttons actuates an entire subsystem.
Based on this information, Fermi 2s design does not align with the TSTF-542 STS Bases 3.3.5.2 design description of manual initiation instrumentation, which assumes that an entire ECCS subsystem can be started with the press of one button.
Furthermore, TSTF-542 STS 3.3.5.2 Bases for Required Action D.1 states, in part:
If a manual initiation function is inoperable, the ECCS subsystem pumps can be started manually and the valves can be opened manually, but this is not the preferred condition.
The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time was chosen to allow time for the operator to evaluate and repair any discovered inoperabilities. The Completion Time is appropriate given the ability to manually start the ECCS pumps and open the injection valves and to manually ensure the pump does not overheat.
Since the Fermi 2 design does not have the capability to start an entire CS or LPCI subsystem, the individual component controls would be the only method to inject water. Should any of those controls become inoperable, there would be no backup means to inject water using the to NRC-18-0045 Page 2 associated required ECCS subsystem, rendering it inoperable as well. Proposed Fermi 2 TS 3.3.5.3 Condition D would allow the plant to remain in this condition, without injection capability, for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, which is a non-conservative TS action considering the assumptions described in the STS.
Please provide technical justification for why proposed Fermi 2 TS 3.3.5.3 Condition D would be appropriate for the CS and LPCI manual initiation functions, or revise the TS changes as necessary.
RESPONSE
DTE proposes to revise Technical Specification (TS) 3.3.5.3, as indicated in Enclosures 2 and 3, to require immediately declaring the associated required ECCS subsystem inoperable if the manual initiation function by means of individual component controls is inoperable. As described in RAI EICB-2, the Fermi design does not have the capability to actuate an entire subsystem of LPCI or CS by a single manual pushbutton, and instead relies on individual component controls to manually actuate a subsystem. In Modes 4 and 5, should any of those controls become inoperable, there would be no backup means to inject water using the associated required ECCS subsystem, rendering it inoperable as well. Therefore, the TS 3.3.5.3, Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation, Condition D Completion Time, referenced from Table 3.3.5.3-1 for the Core Spray and Low Pressure Coolant Injection manual initiation functions, is being revised from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to an immediate action to declare the associated low pressure ECCS injection/spray subsystem inoperable. Since failure to meet the Required Action and Completion Time of TS 3.3.5.3 Condition C will also result in declaring the associated low pressure ECCS injection/spray subsystem inoperable with an immediate Completion Time, Condition E is merged with Condition D to minimize duplicate condition actions. The associated TS Bases has similarly been revised as indicated in Enclosure 4 to clarify that if a manual initiation function is inoperable, the associated low pressure ECCS injection/spray subsystem may be incapable of performing the intended function, and must be declared inoperable immediately. The change in TS 3.3.5.3 Condition D Completion Time from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to immediately is a conservative change consistent with plant design and is an acceptable variation from TSTF-542, Revision 2.
As a result of reviewing the TS Bases as part of this RAI response, DTE proposes to revise the TS Bases for TS 3.3.5.3 Functions 1.b and 2.b Manual Initiation to delete the paragraph that states, The Manual Initiation Function is not assumed in any accident or transient analyses in the UFSAR. However, the Function is retained for overall redundancy and diversity of the low pressure ECCS function as required by the NRC in the plant licensing basis. The paragraph was carried over from the current Fermi TS Bases (TS B 3.3.5.1 Functions 1.d & 2.h), but is not included in TSTF-542, Revision 2.
The markups in Enclosures 2 and 4 only highlight the new changes from this RAI response. shows all changes, including previous RAI responses, as clean.
to NRC-18-0045 Page 3 DTE has reviewed the information supporting a finding of No Significant Hazards Consideration and the Environmental Consideration provided to the NRC in Sections 3.1 and 4.0 of Enclosure 1 of the Reference 1 LAR. The information provided in this letter does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. In addition, the information provided in this letter does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
Enclosure 2 to NRC-18-0045 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Proposed Technical Specification Changes (Mark-Up)
Revised Page 3.3-49a (3.3.5.3 RPV Water Inventory Control Instrumentation)
NEW TS 3.3.5.3 RPV Water Inventory Control Instrumentation 3.3.5.3 3.3 INSTRUMENTATION 3.3.5.3 Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation LCO 3.3.5.3 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.3-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.5.3-1.
ACTIONS
NOTE--------------------------------
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Enter the Condition referenced Immediately inoperable. in Table 3.3.5.3-1 for the channel.
B. As required by Required B.1 Declare associated penetration Immediately Action A.1 and referenced flow path(s) incapable of in Table 3.3.5.3-1. automatic isolation.
AND B.2 Calculate DRAIN TIME. Immediately C. As required by Required C.1 Place channel in trip. 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Action A.1 and referenced in Table 3.3.5.3-1.
D. As required by Required D.1 Declare associated low Immediately Action A.1 and referenced pressure ECCS injection/spray in Table 3.3.5.3-1. subsystem inoperable.
OR Required Action and Revise per associated Completion NRC-18-0045 Delete per Time of Condition C NRC-18-0045 not met.
E. Required Action and E.1 Declare associated low associated Completion pressure Time of Condition C or jec ion/spray subsystem inoperable.
FERMI - UNIT 2 3.3-49a Amendment No.
Enclosure 3 to NRC-18-0045 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Revised Technical Specification Changes (Clean)
Revised Page 3.3-49a (3.3.5.3 RPV Water Inventory Control Instrumentation) 3.3-49b (3.3.5.3 RPV Water Inventory Control Instrumentation)
RPV Water Inventory Control Instrumentation 3.3.5.3 3.3 INSTRUMENTATION 3.3.5.3 Reactor Pressure Vessel (RPV) Water Inventory Control Instrumentation LCO 3.3.5.3 The RPV Water Inventory Control instrumentation for each Function in Table 3.3.5.3-1 shall be OPERABLE.
APPLICABILITY: According to Table 3.3.5.3-1.
ACTIONS
NOTE-------------------------------------
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A. One or more channels A.1 Enter the Condition Immediately inoperable. referenced in Table 3.3.5.3-1 for the channel.
B. As required by B.1 Declare associated Immediately Required Action A.1 penetration flow and referenced in path(s) incapable of Table 3.3.5.3-1. automatic isolation.
AND B.2 Calculate DRAIN TIME. Immediately C. As required by C.1 Place channel in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Action A.1 trip.
and referenced in Table 3.3.5.3-1.
(continued)
FERMI - UNIT 2 3.3-49a Amendment No.
RPV Water Inventory Control Instrumentation 3.3.5.3 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME D. As required by D.1 Declare associated Immediately Required Action A.1 low pressure ECCS and referenced in injection/spray Table 3.3.5.3-1. subsystem inoperable.
OR Required Action and associated Completion Time of Condition C not met.
SURVEILLANCE REQUIREMENTS
NOTE-------------------------------------
Refer to Table 3.3.5.3-1 to determine which SRs apply for each ECCS Function.
SURVEILLANCE FREQUENCY SR 3.3.5.3.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program SR 3.3.5.3.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program SR 3.3.5.3.3 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program FERMI - UNIT 2 3.3-49b Amendment No.
Enclosure 4 to NRC-18-0045 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Response to NRC Request for Additional Information for License Amendment Request to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Proposed Technical Specification Bases Changes (Mark-Up)
(For Information Only)
Revised Page 3.3.5.3-3 (B 3.3.5.3 RPV Water Inventory Control Instrumentation) 3.3.5.3-6 (B 3.3.5.3 RPV Water Inventory Control Instrumentation)
NEWTS 3.3.5.3 Bases RPV Water Inventory Control Instrumentation B 3.3.5.3 BASES APPLICABLE SAFETY ANALYSES, LCO, and APPLICABILITY (continued)
The Allowable Value is low enough to prevent overpressuring the equipment in the low pressure ECCS.
The four channels of Reactor Steam Dome Pressure - Low Function are required to be OPERABLE in MODES 4 and 5 when ECCS manual initiation is required to be OPERABLE by LCO 3.5.2.
1.b, 2.b. Manual Initiation The Manual Initiation channel provides manual initiation capability by means of individual component controls. There is one manual initiation channel for each of the CS and LPCI subsystems (i.e., four for CS and four for LPCI).
The Manual Initiation Function is not assumed in any ac transient analyses in the UFSAR. How , unction is retained for Dlte Per overall redundanc ~ y of the low pressure ECCS function as N-18-0045 re ' e NRC in the plant licensing basis.
There is no Allowable Value for this Function since the channels are mechanically actuated based solely on the position of the individual components. Each channel of the Manual Initiation Function is only required to be OPERABLE in MODES 4 and 5 when the associated ECCS subsystems are required to be OPERABLE per LCO 3.5.2.
RHR System Isolation 3.a - Reactor Vessel Water Level - Low, Level 3 The definition of DRAIN TIME allows crediting the closing of penetration flow paths that are capable of being isolated by valves that will close automatically without offsite power prior to the RPV water level being equal to the TAF when actuated by RPV water level isolation instrumentation. The Reactor Vessel Water Level - Low, Level 3 Function associated with RHR System isolation may be credited for automatic isolation of penetration flow paths associated with the RHR System.
Reactor Vessel Water Level - Low, Level 3 signals are initiated from four level transmitters that sense the difference between the pressure due to a constant column of water (reference leg) and the pressure due to the actual water level (variable leg) in the vessel. While four channels (two channels per trip system) of the Reactor Vessel Water Level - Low, Level 3 Function are available, only two channels (both in the same trip system) are required to be OPERABLE.
FERMI - UNIT 2 3.3.5.3-3 Revision
NEWTS 3.3.5.3 Bases RPV Water Inventory Control Instrumentation B 3.3.5.3 BASES ACTIONS (continued)
If a manual initiation D.1 function is inoperable, the associated low There is a risk that the associated low pressure ECCS pump could pressure ECCS overheat when the pump is operating and the associated injecti alve injection/spray is not fully open. In this condition, the operator can take m al control subsystem may be of the pump and the injection valve to ensure the pu oes not incapable of overheat. If a manual initiation function is inope e, the ECCS performing the subsystem pumps can be started manuall d the valves can be intended function, and opened manually, but this is not the erred condition.
must be declared Replace Per inoperable NRC-18-0045 The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Tim as chosen to allow time for the operator immediately. to evaluate and repair a iscovered inoperabilities. The Completion Time is appropriat ' en the ability to manually start the ECCS pumps and open the ' ction valves and to manually ensure the pump does not overhea With the Required Action and associated Completion Time of Condition C F-9 not met, the associated low pressure ECCS injection/spray bsystem may be incapable of performing the intended function, and Delete pero45 must be declared inoperable immediately.
SURVEILLANCE As noted in the beginning of the SRs, the SRs for each RPV Water REQUIREMENTS Inventory Control instrument Function are found in the SRs column of Table 3.3.5.3-1.
SR 3.3.5.3.1 Performance of the CHANNEL CHECK ensures that a gross failure of instrumentation has not occurred. A CHANNEL CHECK is normally a comparison of the parameter indicated on one channel to a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between the instrument channels could be an indication of excessive instrument drift in one of the channels or something even more serious. A CHANNEL CHECK guarantees that undetected outright channel failure is limited; thus, it is key to verifying the instrumentation continues to operate properly between each CHANNEL FUNCTIONAL TEST.
Agreement criteria are determined by the plant staff, based on a combination of the channel instrument uncertainties, including indication and readability. If a channel is outside the criteria, it may be an indication that the instrument has drifted outside its limit.
The Surveillance Frequency is controlled under the Surveillance Frequency Control Program.
FERMI - UNIT 2 3.3.5.3-6 Revision