Response to Request for Additional Information Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled.
ML15191A013
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/10/2015
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L2588
Download: ML15191A013 (10)


Text

Exelon Generation 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.90 NMP2L2588 July 1O, 2015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410

Subject:

Response to Request for Additional Information* "Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3)."

References:

1. Letter from J. Barstow (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission, "Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3),"

dated November 19, 2014.

2. Email from Brenda Mozafari (Licensing Project Manager, U.S. Nuclear Regulatory Commission) to Ronnie Reynolds and Enrique Villar (Exelon Generation Company, LLC) Draft Request for additional information regarding TSTF-425, Rev. 3," dated June 16, 2015.

This letter responds to the U.S. Nuclear Regulatory Commission request for additional information (Reference 2) requesting Exelon Generation Company, LLC (Exelon) provide additional information regarding the License Amendment Request (LAR) to modify the Nine Mile Point Unit 2 (NMP2) Technical Specifications (TS) (Reference 1). The proposed amendment request would modify NMP2 TS by relocating specific surveillance frequencies

Response to Request for Additional Information Adoption of TSTF-425, Revision 3 July 10, 2015 Page 2 to a licensee-controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies." to this letter contains the NRC's request for additional information immediately followed by Exelon's response.

Exelon has reviewed the information supporting a finding of no significant hazards consideration and the environmental consideration provided to the NRC in Reference 1.

The additional information provided in this response does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration. Furthermore, the additional information provided in this response does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.

There are no regulatory commitments contained in this letter.

If you should have any questions regarding this submittal, please contact Enrique Villar at 610-765-5736.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 101h day of July 2015.

vfA-<.,,)T LJ~~

James Barstow ~ - U.

Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC Attachment 1: Response to Request for Additional Information cc: USNRC Region I Regional Administrator w/attachments USN RC Senior Resident Inspector - NMP USNRC Project Manager, NRA - NMP A. L. Peterson, NYSERDA

ATTACHMENT 1 Response to Request for Additional Information to Support Review of Nine Mile Point Nuclear Station, Unit 2 Adoption of Technical Specification Task Force-425 Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (TAC No. MF5364)

Response to Request for Additional Information Attachment 1 Adoption of TSTF-425, Revision 3 Page 1 of 7 PRA RAI 1 In Attachment 2, Section 2.5 "References," of the License Amendment Request (LAR), the licensee provides references that suggest the July 2009 peer review was performed using ASME RA-Sc-2007, "Addenda to ASME RA-S-2002 Standard for Probabilistic Risk Assessment [PRA] for Nuclear Power Plant Applications." The staff would like to clarify that Regulatory Guide 1.200, Revision 2, "An Approach for Determining the Technical Adequacy of Probabilistic Risk Assessment Results for Risk-Informed Activities" (ML090410014), provides clarification to ASME/ANS RA-Sa-2009 on providing a technically adequate PAA. Furthermore, consistent with the information provided in Regulatory Issue Summary (RIS) 2007-06 (ADAMS Accession No. ML070650428), "Regulatory Guide 1.200 Implementation," the NRG staff will use Revision 2 of RG 1.200 (ADAMS Accession No. ML090410014) to assess technical adequacy of the PRA used to support risk-informed applications received after March 2010. If the licensee did not use ASME/ANS RA-Sa-2009, "Addenda to ASME/ANS RA-S-2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications,"

then they would need to perform a gap analysis for the differences in revisions and provide the applicable Facts and Observations (F&Os) of that gap analysis.

a. Explain whether the peer review was performed to ASME/ANS RA-Sa-2009 as clarified by AG 1.200 Revision 2.

Exelon Response to PRA RAI 1 Yes. The Nine Mile Point Nuclear Station Unit 2 (NMP2) Peer Review Team used ASME/ANS RA-Sa-2009 as clarified by RG 1.200 Revision 2.

PRA-RAI 2 The licensee stated that its PRA model update to meet Regulatory Guide (AG) 1.200 was completed and peer reviewed in July 2009. The licensee further stated that the peer review resulted in "18 findings which did not meeting Capability Category (CC) II and 34 suggestions that met CCII." The licensee also provided Table 2-1 which lists six open findings that have yet to be resolved per the licensee's update process. As discussed in AG 1.200, Revision 2, Regulatory Position 4.2, the licensee should provide discussion regarding the resolution of the peer review findings and observations that are applicable to the parts of the PRA required for the application.

a. If the July 2009 peer review was performed using ASME/ANS RA-Sa-2009, then provide all the applicable findings and suggestions resulting from the 2009 peer review, their disposition, and the potential impact on the Risk-Informed Surveillance Test Interval (RI STI) application. If the peer review was not performed using ASME/ANS RA-Sa-2009, then provide the applicable findings and suggestions resulting from the gap analysis as mentioned in PAA RAI 1, their disposition, and the potential impact on the RI STI application.

Response to Request for Additional Information Attachment 1 Adoption of TSTF-425, Revision 3 Page 2 of 7 Exelon Response to PRA RAI 2 NMP2 Probabilistic Risk Assessment (PRA) model periodic updated is being performed in 2015 per the Exelon Risk Management Training and Requirements Manuals and procedures. The resolutions of the Open Findings and Suggestions below describe actions performed during the 2015 periodic update and documented in the updated PRA notebooks per the Exelon PRA update process.

The following Table shows the applicable Findings and Suggestions from the Peer Review that are applicable to support a Risk Informed Surveillance Frequency Control Program at NMP2:

Response to Request for Additional Information Attachment 1 Adoption of TSTF-425, Revision 3 Page 3 of 7 Finding/ Assoc. Basis for Possible F&O I F&O Description I NMPZ Action/Response Comment Sugestion SR Significance Resolution URE 472: Demands from causes other than surveillance tests were not included in the OPEN collection of plant-specific Include demands Insignificant Impact - Defer for data.

from the four consideration during next major (This F&O originated from SR causes listed in the update. DA-CG)

Demands from causes other than SR. Perhaps use It was looked at during unit 1 SR requires oil surveillance tests were not included in MSPI estimates for update and considered again during URE 472 Resolution : Appendix DA-CG types of demands 1-1 I the collection of plant-specific data.

DA-C7 be counted or MSPI components unit 2 update. It is a little c of the Data Notebook because that conservative and not considered discusses the Plant-Specific estimated.

(This F&O originated from SR DA-CG) program includes significant to estimate using Unavailability Assessment. It al/demands surveillance procedures. Note that includes plant-specific (except post MSPI no longer counts actual demands on the basis of:

maintenance test). events; they estimates the same A) Surveillance Tests way the PRA Group does. B) Maintenance Tests C) Operationa I Demand s URE 472 can be closed .

P. 2-7 of the DA Notebook states that a Perform Bayesian Bayesian analysis was not done when update when data there are no plant-specific failures. This is is available and unacceptable for Category II or Category zero plant-specific Ill. Bayesian updates for events failures are CLOSED with zero plant specific failures It is not observed, or, The discussion justifying not performing Section 2 of DA Notebook and will be performed. This w ill acceptable to skip alternatively, such updates on p. 2-G and 2-7 of the DA Model were updated with Bayesian continue to be performed performing a show that it is I Notebook is misleading because of the analysis for zero events down to going forward per Exelon Best 2-5 DA-Dl Bayesian update unlikely to get the very small failure probabilities involved in failure rates on the order of lE-3. Practices, Procedures and Test when zero plant- required number the example given. The conservatism of no performing and Requirements Manuals.

specific failures of demands to this update for lower failure rates is Specifically, Exelon Best are observed. significantly Based on NUREG/CR-G928 parameters for shown to be minor. Practice, BP-OOG, is used for change the failure distributions with as few as 200 to 1000 PRA data analysis.

probability for demands, the posterior mean could drop specific equipment by a factor of 2 showing zero I , failures.

(This F&O originated from SR DA-Dl)

Response to Request for Additional Information Attachment 1 Adoption of TSTF-425, Revision 3 Page 4 of 7 F&O I F&O Description Finding/

Sugestion Assoc.

SR Basis for Significance I Possible Resolution I NMP2 Action/Response I Comment A critical test of the posterior that is suggested in this Supporting Requirement is:

(c) examination of inconsistencies between the prior distribution and the plant-specific evidence to confirm that they are appropriate. I CLOSED Consistency Section 2. 7 of DA Notebook There is at least one case in which data is between the updated to include test of key Exelon Best Practice BP-OOG inconsistent--MOV (lake) fails to open. plant-specific data Perform distributions with documentation provides guidance for There were Gfailures in 150 demands. and the prior was recommended of methodology. A few treatment of posterior 2-G I The prior from NUREG/CR-G928 for MOV DA-D4 not evaluated. A consistency distributions were identified as Bayesian update results that FTO/C has a mean of 1.07 E-3. The representative analyses for all potentially inconsistent (prior are inconsistent with plant-method from NUREG/CR-G823, Section example of such data. versus posterior and plant data). As specific performance.

G.2.3.5 & G.3.3.4 describe a method for an inconsistency is a result, the uncertainty in the prior consistency evaluation that suggests that provided. distribution was increased to be greater than or equal to 2 failures would more representative of plant data.

be inconsistent and that another prior should be used.

There is no documentation of any NMP-2 analysis like this.

(This F&O originated from SR DA-D4)

-1 OPEN - Insignificant URE 474: Routine system Wait for plant reliability model alignments contributing to development. initiating event frequencies are Routine alignments are already not included. (This F&O included in the average initiating originated from SR IE-AG) event frequency development. In Include routine system Include routine addition, the addition of support alignments in the calculation Routine system alignments contributing system alignments system initiating event fault trees of initiating event frequencies, to initiating event frequencies are not I Does not meet IE- in the calculation to the model (see F&O 2-16 and 4- where applicable.

5-2 I included. IE-AG A6Catll of initiating event 4) adds some important alignments requirements. Resolution for URE 474: SR IE-frequencies, for these systems. It would be a (This F&O originated from SR IE-AG) I where applicable. significant effor to add the type of A6 Capability Category II states: When performing the factors that are typically reserved for EOOS risk managment modeling systematic evaluation required such as 1/2 scram testing etc. This in IE-AS, INCLUDE initiating will have to wait until a plant events resulting from multiple reliability program is developed failures, if the equipment (e.g., scram risk).

failures result from a common cause, and from routine

Response to Request for Additional Information Attachment 1 Adoption of TSTF-425, Revision 3 Page 5 of 7 Finding/ Assoc. Basis for Possible F&O I F&O Description NMPZ Action/Response Comment Sugestion SR Significance Resolution system alignments.

Section 2.5.2 of the Initiating Events Notebook discusses the routine system alignment for each special initiating event.

The system fault trees developed for special initiating events include maintenance and alignment gates. The fault trees are used to obtain a system failure rate, which includes input from any maintenance and alignment gates in the system model.

Table 3-10 lists system fault tree initiator values.

Section 2.5.2.6 discusses multiple failures for each special initiating event due to the potential for common cause effects.

Based on the requirements identified in SR IE-AG, the systematic evaluation performed considered routine system alignments, and common cause failures. The routine system alignments and common cause failures are included in the system fault trees developed, and discussion is provided in the Initiating Events Notebook.

Therefore, the requirements of the F&O and URE 474 have been satisfied, and URE 474 can be closed.

Response to Request for Additional Information Attachment 1 Adoption of TSTF-425, Revision 3 Page 6 of 7 Finding/ Assoc. Basis for Possible F&O F&O Description NMPZ Action/Response Comment Sugestion SR Significance Resolution The emergency diesel generator output circuit breaker is modeled separate from the emergency diesel generator in the Eliminate the CLOSED PRA, while it is included in the emergency This is an isolated circuit breaker EOG output breaker basic event set Treatment of the EOG output diesel generator boundary in NU REG/CR- error associated fram the made/, or DA-Cl to 0.0 in model. As a result circuit breakers and the EDG 1-3 6928 (which provides the prior). This Suggestion with this SR and change its failure SY-A8 documentation in several component boundary is being results in over counting of circuit breaker the result is probability to zero notebooks were updated (SY.00, maintained as stated.

failures, which is significant for the FTLR conservative. (to prevent double SY.01 and DA Notebooks).

failure mode. counting).

(This F70 originated from SR DA-Cl)

p. 2-7 of the DA Notebook states that a This is a documentation error.

Bayesian analysis was not done when See resolution above for 2-5 Please state there are no plant-specific failures. regarding current and future correctly what CLOSED treatment of zero failures.

Error in was done with 2-4 An exception to this statement was Suggestion DA-Dl This error was corrected (also see documentation. situations with found-- Div I & Div II emergency diesel F&O 2-5).

zera plant-specific generator failure to start.

failures .

(This F&O originated from SR DA-Dl)

Response to Request for Additional Information Attachment 1 Adoption of TSTF-425, Revision 3 Page 7 of 7 PRA RAI 3 The LAR does not provide a discussion or description of any low-power or shutdown events. A qualitative analysis of shutdown events is acceptable, as presented in the NRG-endorsed document NEI 04-10, Revision 1. Step 10 of Section 4.0 of NEI 04-10, Revision 1, provides guidance on the initial assessment of Internal Events, External Events, and Shutdown Events. Describe how shutdown events will be assessed as part of the Nine Mile Point, Unit 2, Surveillance Frequency Control Program.

Exelon Response to PRA RAI 3 Changes to surveillance frequencies under the Surveillance Frequency Control Program will consider external, lower power and shutdown events in accordance with NEI 04-10, Revision 1, Section 4.0, Step 10.