Letter of Intent to Adopt NFPA 805 - Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Cooper Nuclear Station
ML053640280
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/22/2005
From: Edington R
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2005109
Download: ML053640280 (4)


Text

N Nebraska Public Power District Always there when you need us NLS2005109 December 22, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Letter of Intent to Adopt NFPA 805 - Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition Cooper Nuclear Station, Docket No. 50-298, DPR-46 The purpose of this letter is to inform the Nuclear Regulatory Commission (NRC) that Nebraska Public Power District (NPPD) intends to adopt the subject National Fire Protection Association standard NFPA 805 in accordance with 10 CFR 50.48(c) for Cooper Nuclear Station (CNS).

This letter also requests enforcement discretion in accordance with NRC interim enforcement policy with an extension beyond the two years in the policy. Finally, this letter proposes CNS be considered for a pilot plant and requests that NRC fees be waived.

The transition to the performance-based standard will commence during the first quarter of 2006 and will take approximately 48 months to fully implement. The schedule is subject to change depending on the extent of any physical plant modifications or changes required to the CNS fire protection program to comply with NFPA 805. An updated schedule will accompany the license amendment request required under 10 CFR 50.48(c)(3)(i).

The NFPA 805 transition process will proceed in three phases:

Phase I - Preliminary assessment of the Fire Protection Program

  • Technical and regulatory assessments to determine the feasibility and practicality of performing the transition Phase 2 - Review and Engineering Analysis
  • Nuclear Safety Performance Criteria Transition review
  • Non-Power Operational Mode Transition review
  • Radiological Release Transition review
  • Change Evaluations
  • License Amendment Request COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

NLS2005109 Page 2 of 3 Phase 3 - Implementation

  • Program Documentation
  • Configuration Control
  • Monitoring The process will be considered complete upon implementation of the approved license amendment authorizing the transition to NFPA 805.

In accordance with NRC interim enforcement policy (69FR33684, June 16, 2004), NPPD requests enforcement discretion for NRC identified non-compliances and unresolved items (URI's) and for CNS identified non-compliances related to fire protection. As outlined in the enforcement policy, those non-compliances must be entered into the licensee's Corrective Action Program, must not be associated with findings that the Reactor Oversight Process Significance Determination Process would evaluate as Red, or would not be categorized as Severity Level 1, and appropriate compensatory measures have been taken. NPPD understands that this letter of intent initiates a period of enforcement discretion during which no enforcement actions will be taken for non-compliances (which meet the enforcement policy guidelines) discovered as the result of evaluations to support this licensing basis transition.

For the reasons stated below, NPPD requests an extension of the enforcement discretion window to four years for CNS, a single unit plant.

  • Duke Energy, Progress Energy and other plants have submitted letters of intent to transition to NFPA 805, and have requested to be considered as pilot plants. CNS desires to apply the lessons learned from their efforts, and these lessons learned may not be available for one to two years.
  • CNS will need to rely on outside resources to complete the transition. However, within the nuclear industry, there are a limited number of experts in the areas of Electrical Engineering (circuit analysis), System Engineering, Appendix R Safe Shutdown, and Probabilistic Safety Assessment which are needed to support reconstitution of the Appendix R design basis and the transition to NFPA 805.
  • There are several actions that need to be completed in series to make a quality transition.

This would include developing a cable and raceway data base and a complete Fire PRA prior to doing further engineering analysis. For this reason, NPPD estimates the total project duration to be approximately 48 months.

Since CNS will be among the first Boiling Water Reactors (BWR) to announce its intent to adopt NFPA 805, NPPD proposes that CNS be considered a pilot plant for the initial implementation of performance based fire protection using NFPA 805. As part of this pilot process, NPPD requests

NLS2005 109 Page 3 of 3 that all NRC licensing and review fees be waived for the CNS License Amendment Request.

NPPD believes that its participation in the pilot process will significantly benefit the NRC through the knowledge and experience gained during the NRC observation process, and will provide valuable input into the NRC inspection guidance for transition. The experience gained by the NRC and NPPD in developing, submitting, and reviewing the Transition Report will allow the development of valid industry BWR templates for future licensees undergoing transition. In addition, waiver of the licensing fees will somewhat offset the expense and burden of orchestrating the on-site observation process.

Should you have any questions regarding this submittal, please contact Paul Fleming, Licensing Manager, at (402) 825-2774.

Sincerely, Randall K. Edington Vice President Nuclear and Chief Nuclear Officer

/em cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-I Senior Resident Inspector USNRC - CNS NPG Distribution CNS Records

I ATTACHMENT 3 LIST OF REGULATORY COMMITMENTSl Correspondence Number: NLS2005109 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory commitments. Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITMENT COMMITTED DATE COMMITMENT NUMBER OR OUTAGE None t 1-t t

4 I 4 4 t I

4. I I PROCEDURE 0.42 l REVISION 18 l PAGE 19 OF 25 1