Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20204G65218 March 1999Comments Re PRM 50-64.Urges Commission to Delete Paragraph Containing Joint & Several Liability Clause as Contained in Final Policy Statement
3F1298-06, Comment Supporting Proposed Rule 10CFR50.65 Re Monitoring Effectiveness of Maint at Npps.Expresses Concern Re Absence of Definition of risk-significant Configurations & Unacceptable Level for Safety Function Degradation9 December 1998Comment Supporting Proposed Rule 10CFR50.65 Re Monitoring Effectiveness of Maint at Npps.Expresses Concern Re Absence of Definition of risk-significant Configurations & Unacceptable Level for Safety Function Degradation
3F1098-09, Comment Re Integrated Review of Assessment Process for Commercial Npps.Recommends That Assessment Process Be Reviewed with Consideration of Enforcement Process,Insp Process & Reporting Process5 October 1998Comment Re Integrated Review of Assessment Process for Commercial Npps.Recommends That Assessment Process Be Reviewed with Consideration of Enforcement Process,Insp Process & Reporting ProcessProbabilistic Risk Assessment
ML20199E08223 January 1998Comment Supporting PRM 50-63A Re Emergency Plan for CR3 to Include Mandatory Stockpiling of Ki for Distribution to General Public in Event of Severe Accident
ML20098B28027 September 1995Comment Supporting Petition for Rulemaking PRM-50-61 Re Proposed App as Improvement Over Existing App R on Basis That It Allows Utilities to Apply Fire Protection Resources in Proportion to Safety Significance of Plant AreasSafe Shutdown
Fire Barrier
Exemption Request
ML20091S05331 August 1995Comment on Review of Revised NRC SALP Program.Use of Numerical Scores Has Proven to Be Punitive from Economic PerspectiveSystematic Assessment of Licensee Performance
NL-95-0061, Comment on Draft GL Re Testing of safety-related Circuits. Util Primary Concern W/Requested Actions of Proposed GL Is Schedule18 July 1995Comment on Draft GL Re Testing of safety-related Circuits. Util Primary Concern W/Requested Actions of Proposed GL Is Schedule
NL-95-0053, Comment on Review of NRC Insp Rept Content,Format & Style. Insp Repts Frequently Not Appropriately Focused on Safety Issues29 June 1995Comment on Review of NRC Insp Rept Content,Format & Style. Insp Repts Frequently Not Appropriately Focused on Safety Issues
ML20083N4615 May 1995Comment Re Proposed GL Concerning Pressure Locking & Thermal Binding of Safety Related Power Operated Valves.Tis to Insp Personnel,Surveys or Other Means Could Confirm That SR Power Operated Valves Capable of Performing Safety FunctionPower-Operated Valves
Power Operated Valves
Backfit
ML20077M67929 December 1994Comments Opposing Proposed Rule 10CFR50 Re Shutdown & Low Power Operation for Nuclear Power ReactorBackfit
ML20077E8238 December 1994Comment Supporting Proposed Rules 10CFR2,51 & 54 Re Rev to NRC NPP License Renewal RuleLicense Renewal
ML20064G1498 March 1994Comments on Whistleblower Protection Issue.Lists Violations Identified
ML20067C14915 February 1994Comment on Draft NUREG-5884 Re Revised Analyses of Decommissioning for Ref Pressurized Water Reactor Power Station
ML20056G98327 August 1993Comment on Whistleblower Protection Issue
3F0492-15, Comment Concurring W/Comments Offered by NUMARC on Sections 7 & 8 of Draft NUREG-1449, Shutdown & Low-Power Operation at Commercial Nuclear Power Plants in Us. Urges NRC to Consider Comments Carefully30 April 1992Comment Concurring W/Comments Offered by NUMARC on Sections 7 & 8 of Draft NUREG-1449, Shutdown & Low-Power Operation at Commercial Nuclear Power Plants in Us. Urges NRC to Consider Comments Carefully
ML20094E11419 December 1991Comment on Draft Reg Guide DG-8005, Assessing External Radiation Dose from Airborne Radioactive Matls. Reg Guide Provides Minimal New Info to Nuclear Industry & Would Probably Be Best Combined W/Some Other Reg Guide
ML20024H42824 May 1991Comment Opposing Proposed Rules 10CFR71,170 & 171, Rev of Fee Schedules;100% Fee Recovery.
ML19324B87027 October 1989Comments on 54FR40221 Re Licensee Application for Amend to License DPR-72,eliminating Need to Test Diesel Generator in 30-minute Rating.Application Objection Expressed
3F0289-18, Comment on Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants.Industry Actions in Maint Area Effective W/Continuing Improvement Across Industry.Balance of Plant Equipment Inappropriate28 February 1989Comment on Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants.Industry Actions in Maint Area Effective W/Continuing Improvement Across Industry.Balance of Plant Equipment Inappropriate
3F1288-02, Requests That Comment Period Be Extended from 60 Days to 120 Days on Proposed Rule 10CFR50 Re Maint in Nuclear Power Plants2 December 1988Requests That Comment Period Be Extended from 60 Days to 120 Days on Proposed Rule 10CFR50 Re Maint in Nuclear Power Plants
3F1287-24, Comment on Proposed Rules 10CFR4,11,25,30,31,32,34,35,40,50, 60,61,70,71,73,74,75,95 & 110 Re Retention Period for Records.Formal Tech Spec Amends Should Not Be Required to Implement Changes & No 10CFR170 Fees Should Be Incurred22 December 1987Comment on Proposed Rules 10CFR4,11,25,30,31,32,34,35,40,50, 60,61,70,71,73,74,75,95 & 110 Re Retention Period for Records.Formal Tech Spec Amends Should Not Be Required to Implement Changes & No 10CFR170 Fees Should Be Incurred
ML20236A04413 October 1987Comment Opposing Proposed Rule 10CFR50 Re Rev to Backfitting Process for Power Reactors.Proposed Rule Devoid of Objective Guidance or Criteria for Distinguishing Between Cases Where cost-benefit Analysis Permissible & Where Not