NL-18-0238, Report of Changes to Emergency Plan and Summary of 50.54(g) Analysis
ML18054B598 | |
Person / Time | |
---|---|
Site: | Vogtle, 07201039 |
Issue date: | 02/22/2018 |
From: | Hutto J Southern Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
References | |
NL-18-0238 | |
Download: ML18054B598 (4) | |
Category:Emergency Preparedness-Emergency Plan
MONTHYEARNL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023
[Table view]Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ND-22-0328, Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.02022-06-29029 June 2022 Enclosuvogtle Electric Generating Plant, Units 3 & 4 - Fukushima Response NEI 12-01 On-Shift Staffing Analysis Phase 2 Report, Revision 3.0, Standard Emergency Plan Annex, Revision 6.0 ML22018A0282022-01-18018 January 2022 Region 2 RFI - 2022 Exercise Inspections - Rev1 NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions NL-20-1369, & Vogtle Electric Generating Plant Units 1 and 2 - Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2021-01-12012 January 2021 & Vogtle Electric Generating Plant Units 1 and 2 - Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML20339A5792020-12-0404 December 2020 Report of Changes to SNC Standard Emergency Plan Annex and Summary of 50.54(9) Analysis ML20192A1402020-06-30030 June 2020 Southern Nuclear Operating Co., Inc. - License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ND-19-0753, (VEGP) Units 3 and 4 - Emergency Preparedness Communications Assessment2019-08-16016 August 2019 (VEGP) Units 3 and 4 - Emergency Preparedness Communications Assessment NL-19-0924, Report of Changes to Emergency Plan and Summary of 10 CFR 50.54(g) Analysis2019-07-26026 July 2019 Report of Changes to Emergency Plan and Summary of 10 CFR 50.54(g) Analysis ND-19-1095, (VEGP) Units 3 and 4 - Emergency Action Levels and Basis2019-04-18018 April 2019 (VEGP) Units 3 and 4 - Emergency Action Levels and Basis ML18226A0952018-04-10010 April 2018 Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis NL-17-1089, Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis2018-04-10010 April 2018 Edwin I. Hatch Nuclear Plant Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis NL-17-1089, Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis2018-04-10010 April 2018 Standard Emergency Plan Proposed Version 4.0 On-Shift Staffing Analysis NL-18-0238, Report of Changes to Emergency Plan and Summary of 50.54(g) Analysis2018-02-22022 February 2018 Report of Changes to Emergency Plan and Summary of 50.54(g) Analysis NL-18-0033, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2018-01-12012 January 2018 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-16-1028, E.I. Hatch and Vogtle - Report of Changes to Emergency Plan2016-06-30030 June 2016 E.I. Hatch and Vogtle - Report of Changes to Emergency Plan NL-16-0169, Southern Nuclear Operating Company Response to Third Request for Additional Information Regarding Standard Emergency Plan: Enclosure 11, Vogtle Units 1 and 2 Standard Emergency Plan Annex (Marked-Up Pages and Clean Copy)2016-06-0909 June 2016 Southern Nuclear Operating Company Response to Third Request for Additional Information Regarding Standard Emergency Plan: Enclosure 11, Vogtle Units 1 and 2 Standard Emergency Plan Annex (Marked-Up Pages and Clean Copy) NL-16-0739, Corrected Response to Second Request for Additional Information Regarding Standard Emergency Plan2016-05-26026 May 2016 Corrected Response to Second Request for Additional Information Regarding Standard Emergency Plan NL-16-0169, Enclosure 20: SNC Standard Emergency Plan LAR - Updated Clean Version of Enclosures 1-192016-02-17017 February 2016 Enclosure 20: SNC Standard Emergency Plan LAR - Updated Clean Version of Enclosures 1-19 NL-16-0169, Enclosure 6: Farley Justification Matrix2016-02-17017 February 2016 Enclosure 6: Farley Justification Matrix NL-16-0169, Enclosure 8: Hatch Standard Emergency Plan Annex2016-02-17017 February 2016 Enclosure 8: Hatch Standard Emergency Plan Annex NL-16-0169, Enclosures 10, 11, 12, 13 & 14: Vogtle (Units 1 & 2) Staffing - Detailed Description and Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Staffing-Detailed Description and Technical Evaluation and Standard Emerge2016-02-17017 February 2016 Enclosures 10, 11, 12, 13 & 14: Vogtle (Units 1 & 2) Staffing - Detailed Description and Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Staffing-Detailed Description and Technical Evaluation and Standard Emergenc NL-16-0169, Enclosures 15, 16, 17, 18 & 19: Vogtle (Units 3 & 4) - Justification Matrix, Evaluation of Proposed Changes LAR for Revision for Emergency Planning ITAAC, Rev to Units 3 & 4 COL Appendix C - Proposed Changes, and Off-Site Response Organiz2016-02-17017 February 2016 Enclosures 15, 16, 17, 18 & 19: Vogtle (Units 3 & 4) - Justification Matrix, Evaluation of Proposed Changes LAR for Revision for Emergency Planning ITAAC, Rev to Units 3 & 4 COL Appendix C - Proposed Changes, and Off-Site Response Organizat NL-16-0169, Enclosures 13, 14, 15, 16, 17, 18, 19 Re Vogtle Units 3 & 4 Detailed Description & Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Evaluation of Proposed Changes, Revision to Units 3 & 4 COL Appendix C & Off-Sit2016-02-17017 February 2016 Enclosures 13, 14, 15, 16, 17, 18, 19 Re Vogtle Units 3 & 4 Detailed Description & Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Evaluation of Proposed Changes, Revision to Units 3 & 4 COL Appendix C & Off-Site NL-16-0169, Enclosures 2 to 12: SNC Standard Emergency Plan (Marked-Up Pages), Farley Staffing - Detailed Description and Technical Evaluation (Marked-up Pages),Standard Emergency Plan Annex (Marked-up Pages), Farley Justification Matrix..2016-02-17017 February 2016 Enclosures 2 to 12: SNC Standard Emergency Plan (Marked-Up Pages), Farley Staffing - Detailed Description and Technical Evaluation (Marked-up Pages),Standard Emergency Plan Annex (Marked-up Pages), Farley Justification Matrix.. NL-16-0169, Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Encl2016-02-17017 February 2016 Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Enclos ML16060A3292016-02-17017 February 2016 Enclosures 2 to 12: SNC Standard Emergency Plan (Marked-Up Pages), Farley Staffing - Detailed Description and Technical Evaluation (Marked-up Pages),Standard Emergency Plan Annex (Marked-up Pages), Farley Justification Matrix.. ML16060A3352016-02-17017 February 2016 Enclosures 10, 11, 12, 13 & 14: Vogtle (Units 1 & 2) Staffing - Detailed Description and Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Staffing-Detailed Description and Technical Evaluation and Standard Emergenc ML16060A3342016-02-17017 February 2016 Enclosure 8: Hatch Standard Emergency Plan Annex ML16060A3302016-02-17017 February 2016 Enclosures 13, 14, 15, 16, 17, 18, 19 Re Vogtle Units 3 & 4 Detailed Description & Technical Evaluation, Standard Emergency Plan Annex, Justification Matrix, Evaluation of Proposed Changes, Revision to Units 3 & 4 COL Appendix C & Off-Site ML16060A3322016-02-17017 February 2016 Enclosure 20: SNC Standard Emergency Plan LAR - Updated Clean Version of Enclosures 1-19 ML16060A3362016-02-17017 February 2016 Enclosures 15, 16, 17, 18 & 19: Vogtle (Units 3 & 4) - Justification Matrix, Evaluation of Proposed Changes LAR for Revision for Emergency Planning ITAAC, Rev to Units 3 & 4 COL Appendix C - Proposed Changes, and Off-Site Response Organizat ML16060A3332016-02-17017 February 2016 Enclosure 6: Farley Justification Matrix ML16060A3282016-02-17017 February 2016 Southern Nuclear Operating Company Response to First Request for Additional Information Re Standard Emergency Plan. Attachment 1: SNC Response to NRC RAI-1 Fleet Standard Emergency Plan and Enclosure 1: Evaluation of Proposed Changes Enclos ML15246A0562015-08-31031 August 2015 Enclosure 11 - Vogtle (Units 1 and 2) Standard Emergency Plan Annex NL-15-1392, Enclosure 9 - Hatch Justification Matrix2015-08-31031 August 2015 Enclosure 9 - Hatch Justification Matrix NL-15-1392, Enclosure 7 - Hatch Staffing - Detailed Description and Technical Evaluation & Enclosure 8 - Hatch Standard Emergency Plan Annex2015-08-31031 August 2015 Enclosure 7 - Hatch Staffing - Detailed Description and Technical Evaluation & Enclosure 8 - Hatch Standard Emergency Plan Annex NL-15-1392, Enclosure 6 - Farley Justification Matrix2015-08-31031 August 2015 Enclosure 6 - Farley Justification Matrix NL-15-1392, Enclosure 10 - Vogtle (Units 1 and 2) Staffing - Detailed Description and Technical Evaluation2015-08-31031 August 2015 Enclosure 10 - Vogtle (Units 1 and 2) Staffing - Detailed Description and Technical Evaluation NL-15-1392, Enclosure 4 - Farley Staffing - Detailed Description and Technical Evaluation & Enclosure 5 - Farley Standard Emergency Plan Annex2015-08-31031 August 2015 Enclosure 4 - Farley Staffing - Detailed Description and Technical Evaluation & Enclosure 5 - Farley Standard Emergency Plan Annex NL-15-1392, Enclosure 3 - Corporate Joint Information Center Description and Technical Evaluation2015-08-31031 August 2015 Enclosure 3 - Corporate Joint Information Center Description and Technical Evaluation NL-15-1392, Enclosure 2 - SNC Standard Emergency Plan2015-08-31031 August 2015 Enclosure 2 - SNC Standard Emergency Plan NL-15-1392, Enclosure 1 - Evaluation of the Proposed Changes - LAR for the Adoption of a Standard Emergency Plan for the SNC Fleet2015-08-31031 August 2015 Enclosure 1 - Evaluation of the Proposed Changes - LAR for the Adoption of a Standard Emergency Plan for the SNC Fleet NL-15-1392, Joseph M. Farley Nuclear Plant Units 1 and 2; Edwin I. Hatch Nuclear Plant Units 1 and 2; Vogtle Electric Generating Plant Units 1 and 2; Vogtle Electric Generating Plant Units 3 and 4 Standard Emergency Plan2015-08-31031 August 2015 Joseph M. Farley Nuclear Plant Units 1 and 2; Edwin I. Hatch Nuclear Plant Units 1 and 2; Vogtle Electric Generating Plant Units 1 and 2; Vogtle Electric Generating Plant Units 3 and 4 Standard Emergency Plan ML15246A0592015-08-31031 August 2015 Enclosure 14 - Vogtle (Units 3 and 4) Standard Emergency Plan Annex & Enclosure 15- Vogtle (Units 3 and 4) Justification Matrix NL-15-1392, Enclosure 16 - Evaluation of Proposed Changes Through Enclosure 19 - Off-site Response Organizations Letters of Consultation and Concurrence2015-08-31031 August 2015 Enclosure 16 - Evaluation of Proposed Changes Through Enclosure 19 - Off-site Response Organizations Letters of Consultation and Concurrence NL-15-1392, Enclosure 12 - Vogtle (Units 1 and 2) Justification Matrix2015-08-31031 August 2015 Enclosure 12 - Vogtle (Units 1 and 2) Justification Matrix NL-15-1392, Enclosure 13 - Vogtle (Units 3 and 4) Staffing - Detailed Description and Technical Evaluation2015-08-31031 August 2015 Enclosure 13 - Vogtle (Units 3 and 4) Staffing - Detailed Description and Technical Evaluation NL-15-1392, Enclosure 14 - Vogtle (Units 3 and 4) Standard Emergency Plan Annex & Enclosure 15- Vogtle (Units 3 and 4) Justification Matrix2015-08-31031 August 2015 Enclosure 14 - Vogtle (Units 3 and 4) Standard Emergency Plan Annex & Enclosure 15- Vogtle (Units 3 and 4) Justification Matrix ML15246A0582015-08-31031 August 2015 Enclosure 13 - Vogtle (Units 3 and 4) Staffing - Detailed Description and Technical Evaluation 2023-08-04 Category:Letter type:NL MONTHYEARNL-24-0217, License Amendment Request: Source Range Neutron Flux Doubling Function Applicability2024-11-0101 November 2024
[Table view]License Amendment Request: Source Range Neutron Flux Doubling Function Applicability NL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0197, Registration of Spent Fuel Cask Use2024-05-20020 May 2024 Registration of Spent Fuel Cask Use NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) NL-24-0170, Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report2024-04-25025 April 2024 Responses to Second Round NRC Request for Additional Information for Refueling Outage 1 R24 Steam Generator Tube Inspection Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0154, Preservice Inspection Progam Owners Activity Report2024-04-16016 April 2024 Preservice Inspection Progam Owners Activity Report NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0128, License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency2024-04-0404 April 2024 License Amendment Request: Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) Testing Frequency NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0098, Report on Status of Decommissioning Funding2024-03-28028 March 2024 Report on Status of Decommissioning Funding NL-24-0112, Request for Revision to NRC Staff Assessment of Vogtle Site Updated Seismic Hazards2024-03-28028 March 2024 Request for Revision to NRC Staff Assessment of Vogtle Site Updated Seismic Hazards NL-24-0097, Exemption Request: Final Safety Analysis Report Update Schedule2024-03-22022 March 2024 Exemption Request: Final Safety Analysis Report Update Schedule NL-22-0267, License Amendment Request to Revise Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, AC Sources – Operating, Surveillance Requirements2024-03-20020 March 2024 License Amendment Request to Revise Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, AC Sources – Operating, Surveillance Requirements NL-24-0060, Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03)2024-02-15015 February 2024 Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03) NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0045, Supplement to Response to Requests for Additional Information for Proposed Alternative ALT-VR-022024-02-0808 February 2024 Supplement to Response to Requests for Additional Information for Proposed Alternative ALT-VR-02 NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0038, National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application2024-02-0202 February 2024 National Pollutant Discharge Elimination System (NPDES) Permit Renewal Application NL-24-0031, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R23 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0742, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications2023-09-20020 September 2023 To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters – Operating, Completion Time Extension (LAR-22-002S2) NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal 2024-09-09 |
Text
.t. Southern Nuclear Regulatory Affairs 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 205 992 5000 tel 205 992 7601 fax FEB 2 2 2018 Docket Nos.: 50-424 NL-18-0238 50-425 72-1039 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(g) Analysis Ladies and Gentlemen:
In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), Southern Nuclear Operating Company (SNC) hereby submits descriptions of changes to the emergency plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The emergency plan continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b). A description of the changes and a summary of the 50.54(q) analysis is enclosed.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.
Respectfully submitted, J.J.Hutto Regulatory Affairs Director jjh/efb/cgb
Enclosure:
- 1. Description of Emergency Plan Changes and Summary of 50.54(q) Analysis
U.S. Nuclear Regulatory Commission NL-18-0238 Page 2 cc: NRC Regional Administrator, Region II NRC NRR Project Manager- Vogtle Unit 1-2 NRC Senior Resident Inspector- Vogtle Unit 1 and 2 Georgia - State Director of Environmental Protection Division SNC Records RTYPE: CVC7000
Vogtle Electric Generating Plant Units 1 and 2 Report of Changes to Emergency Plan and Summary of 50.54(g) Analysis Enclosure 1 Description of Emergency Plan Changes and Summary of 50.54(q) Analysis to NL-18-0238 SNC Summary of 50.54(q) Analysis Description of Emergency Plan Changes and Summary of 50.54(q) Analysis On January 29, 2018, Vogtle Electric Generating Plant (VNP) Units 1 and 2 implemented changes to the procedures and wall charts for Emergency Action Levels (EALs) to implement the new NRC-approved EAL scheme based on NEI 99-01 Revision 6. The EALs are contained in procedure NMP-EP-141-003 Version 3.0 which supersedes the NEI 99-01 Revision 4 EAL scheme used previously at VNP. New wall charts were generated, removed from the superseded procedure, and changed to stand-alone documents. Changes from the NRC-approved EALs were limited to readability and human performance improvements and do not vary from the approved scheme.
These changes were evaluated in accordance with 10 CFR 50.54(q)(3), and SNC determined that the changes do not reduce the effectiveness of the SNC standard emergency plan, the site-specific annexes or the approved EAL scheme. The SNC emergency plan and EALs continue to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47(b).
Page E1-1