Edwin I. Hatch, Units 1 and 2 - Transmittal of Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))
ML15167A461
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/26/2015
From: Pierce C R
Southern Co, Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML15167A507 List:
References
NL-15-0577
Download: ML15167A461 (2)


Text

Charles R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL.. 35201 Tel 205.992.7872 Fax 205.992.7601

.. DANT March 26, 2015 Docket Nos.: 50-321 50-366 NL-15-0577 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))

Ladies and Gentlemen:

Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC the status of its decommissioning funding for each reactor or part of each reactor it owns on a calendar year basis, beginning on March 31,1999, and every two years thereafter.

Southern Nuclear Operating Company (Southern Nuclear) holds operating licenses DPR-57 and NPF-5 for Edwin I. Hatch Nuclear Plant Unit 1 and Unit 2, respectively.

On behalf of the licensed owners of the Edwin I. Hatch Nuclear Plant (Georgia Power Company, Oglethorpe Power Corporation, the Municipal Electric Authority of Georgia, and Dalton Utilities), Southern Nuclear provides the enclosed submittals in accordance with the requirements of 10 CFR 50.75(f)(1).

This letter contains no NRC commitments.

If you have any questions, please contact Ken McElroy at (205) 992-7369.Respectfully submitted, C. R. Pierce Regulatory Affairs Director CRP/RMJ

Enclosures:

1. Georgia Power Company Response 2. Oglethorpe Power Corporation Response 3. Municipal Electric Authority of Georgia Response 4. Dalton Utilities Response xA 0o I K(e-r U. S. Nuclear Regulatory Commission NL-15-0577 Page 2 cc: Georgia Power Company Mr. D. Poroch, Vice President

& Comptroller Oglethorpe Power Corporation Ms. A. F. Appleby, Vice President, Treasurer Municipal Electric Authority of Georgia Mr. J. E. Fuller, Senior Vice President, Chief Financial Officer Dalton Utilities Mr. D. Cope, President and CEO Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President

& CEO Mr. D. G. Bost, Executive Vice President

& Chief Nuclear Officer Mr. D. R. Vineyard, Vice President

-Hatch Mr. M. D. Meier, Vice President

-Regulatory Affairs Mr. D. R. Madison, Vice President

-Fleet Operations Mr. B. J. Adams, Vice President

-Engineering Mr. G. L. Johnson, Regulatory Affairs Manager -Hatch RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager -Hatch Mr. D. H. Hardage, Senior Resident Inspector