MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-11-30030 November 2022 Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-11-18018 November 2022 Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .2022-10-27027 October 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-022022-10-27027 October 2022 Supplement to Authorized Relief Request HNP-ISI-RR-05-02 NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .2022-10-14014 October 2022 Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of . NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-09-30030 September 2022 Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NL-22-0687, Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 22022-08-31031 August 2022 Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2 NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes2022-08-19019 August 2022 Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-08-19019 August 2022 Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten2022-08-18018 August 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten NL-22-0672, Registration of Spent Fuel Cask Use2022-08-17017 August 2022 Registration of Spent Fuel Cask Use NL-22-0564, and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use2022-07-21021 July 2022 and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0499, Registration of Spent Fuel Cask Use2022-06-27027 June 2022 Registration of Spent Fuel Cask Use NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-22-0335, Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And.2022-05-17017 May 2022 Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And. NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0315, Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days2022-05-0404 May 2022 Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days NL-22-0325, Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-05-0303 May 2022 Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0283, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-04-29029 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. NL-22-0271, Changes to the Physical Security Plan2022-04-19019 April 2022 Changes to the Physical Security Plan NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations NL-21-0918, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 52022-03-31031 March 2022 License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 NL-22-0220, Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 20222022-03-28028 March 2022 Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 2022 NL-22-0221, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2022-03-28028 March 2022 Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) 2024-01-30
[Table view] |
Text
Charles A. Pierce Southern Nuclear Regulatory Affairs Director Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 Tel 205.992.7872 Fax 205.992.7601 sou August 5, 2014 Docket Nos.: 50-321 NL-14-1206 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Operating License Revision Associated with License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 Ladies and Gentlemen:
By letter dated July 23 , 2013 , Southern Nuclear Operating Company (SNC) submitted a request for an amendment to the technical specifications (TS) for Edwin I. Hatch Nuclear Plant (HNP), Units 1 and 2. This request proposed an operating license (OL) condition to support implementation of the proposed TS change. The Enclosure contains the "clean typed" OL pages with the condition incorporated. Please note that OL condition proposed in the July 23, 2013 SNC letter has been modified in the Enclosure to remove outdated information .
Please note, regarding Part c. of the new Unit 1 and Unit 2 OL condition , SNC considers the date of the last successful performance of current SR 3.7.4.4 to be the date of the most recent successful pressure measurement test. Current SR 3.7.4.4 states:
Verify each MCREC subsystem can maintain a positive pressure of::::: 0.1 inches water gauge relative to the turbine building during the pressurization mode of operation at a subsystem flow rate of::; 2750 cfm and an outside air flow rate ::; 400 cfm .
The current Unit 1 and Unit 2 SR 3.7.4.4 does not meet all the requirements of (proposed) Specification 5.5.14.d , which is referenced in Part c. However, based on SNC's interpretation , the last successful positive pressure test meets the intent of this requirement.
This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369 .
U. S. Nuclear Regulatory Commission NL-14-1206 Page2 Mr. C. R. Pierce states he is Regulatory Affairs Director of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are trlJe.
Respectfully submitted, c.rt.~ .:.-..... "~- ~
C. R. Pierce :.: ~*-
'~
Regulatory Affairs Director =.::: : . . . : ./.:: :~~
CRP/RMJ/Iac Sworn to and subscribed before me this ~day of Aujtt s"t 12014.
~-iS~ -
Notary Public r My commission expires: 1- Z- 2...0 I~
Enclosure:
HNP Unit 1 and Unit 2 Clean Typed Operating License Change cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Vineyard, Vice President- Hatch Mr. B. L. lvey, Vice President- Regulatory Affairs Mr. D. R. Madison, Vice President- Fleet Operations Mr. B. J. Adams, Vice President- Engineering Mr. G. L. Johnson, Regulatory Affairs Manager- Hatch RType: CHA02.004 U.S. Nuclear Regulatorv Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Senior Project Manager- Hatch Mr. D. H. Hardage, Senior Resident Inspector- Hatch State of Georaia Mr. J. H. Turner, Environmental Director Protection Division
Edwin I. Hatch Nuclear Plant Operating License Revision Associated with License Amendment Request to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3 Enclosure HNP Unit 1 and Unit 2 Clean Typed Operating License Change
that will be located in a seismically qualified manual transfer switch housing. The aforementioned circuit breaker and fuses shall be adequately coordinated with the upstream load center breaker over the entire range. These devices shall be adequately rated to prevent adverse effects of a fault to the rest of the distribution system.
- 2) SNC shall implement modifications by May 31, 2010, as described in Enclosure 1, section 2. 7 .3.2, of the LAR and section 5. 7 of SNC's letter dated February 25, 2008 (NL 08-0175) to modify the design for the air supply to the turbine building exhaust ventilation dampers, such that operating air to the dampers will be supplied from a non-interruptible instrument air source to eliminate single failure point vulnerability to loss of system/instrument air.
- 3) SNC shall complete actions by May 31, 2010, as described in SNC's letter dated February 25, 2008 (NL-08-0175) to install and implement the capability for Standby Liquid Control System hand switch jumpers for HNP Units 1 and 2.
- 4) SNC shall complete actions by May 31, 2012 for HNP Unit 1, as described in SNC's letters dated February 25, 2008 (NL-08-0175) and July 2, 2008 (NL-08-1 022), to modify the following Main Steam Isolation Valve alternate leakage treatment boundary valves, such that they can be closed in the event of a loss of offsite power without requiring local operation:
1N38-F1 01 A, 1N38-F1 01 B, 1N33-F012, 1N33-F013
- 5) SNC shall implement actions by May 31, 2010, as described in SNC's letter dated February 27, 2008, to assure that temperature switches which monitor charcoal bed temperature meet the environmental qualification requirements of 10 CFR 50.49.
(1 0) TSTF-448. Control Room Habitabilitv Upon implementation of the Amendments adopting TSTF-448, Revision 3, the determination of control room envelope (CAE) unfiltered air inleakage as required by SA 3.7.4.4, in accordance with TS 5.5.14.c.(i), the assessment of CAE habitability as required by Specification 5.5.14.c.(ii), and the measurement of CAE pressure as required by Specification 5.5.14.d, shall be considered met. Following implementation:
- a. The first performance of SA 3.7.4.4, in accordance with Specification 5.5.14.c.(i), shall be within the next 18 months.
- b. The first performance of the periodic assessment of CAE habitability, Specification 5.5.14.c.(ii), shall be within 3 years, plus the 9-month allowance of SA 3.0.2, of the next successful tracer gas test.
Renewed License No. DPR-57 Amendment No.
- c. The first performance of the periodic measurement of CRE pressure, Specification 5.5.14.d, shall be within 24 months, plus the 6 months allowed by SR 3.0.2, from the date of the most recent successful pressure measurement test.
D. Southern Nuclear shall not market or broker power or energy from Edwin I. Hatch Nuclear Plant, Unit 1.
- 3. This renewed license is effective as of the date of issuance and shall expire at midnight, August 6, 2034.
FOR THE U.S. NUCLEAR REGULATORY COMMISSION Samuel J. Collins, Director Office of Nuclear Reactor Regulation Attachments:
Appendix A- Technical Specifications Appendix B - Environmental Protection Plan Date of Issuance: January 15, 2002 Renewed License No. DPR-57 Amendment No.
- 6a-manually switched over from normally operating power supplies, to a Class -
1E circuit that will be isolated by an appropriately rated safety related, environmentally and seismically qualified circuit breaker. For further protection and isolation, the licensee shall also use fuses that will be located in a seismically qualified manual transfer switch housing. The aforementioned circuit breaker and fuses shall be adequately coordinated with the upstream load center breaker over the entire range. These devices shall be adequately rated to prevent adverse effects of a fault to the rest of the .distribution system.
ii} SNC shall implement modifications by May 31, 2010, as described in Enclosure 1, section 2.7.3.2, of the LAR and section 5.7 of SNC's letter dated February 25, 2008, (NL 08-0175} to modify the design for the air supply to the turbine building exhaust ventilation dampers, such that operating air to the dampers will be supplied from a non-interruptible instrument air source to eliminate single failure point vulnerability to loss of system/instrument air.
iii} SNC shall complete actions by May 31, 2010, as described in SNC's letter dated February 25, 2008 (NL-08-0175} to install and implement the capability for Standby Liquid Control System hand switch jumpers for HNP Units 1 and 2.
iv} SNC shall complete actions by May 31, 2011, for HNP Unit 2, as described in SNC's letters dated February 25, 2008 (NL-08-0175} and July 2, 2008 (NL-08-1022}, to modify the following Main Steam Isolation Valve alternate leakage treatment boundary valves, such that they can be closed in the event of a loss of offsite power without requiring local operation:
2N11-F004A, 2N11-F004B, 2N33-F003, 2N33-F004 v} SNC shall implement actions by May 31, 2010, as described in SNC's letter dated February 27, 2008, to assure that temperature switches which monitor charcoal bed temperature meet the environmental qualification requirements of 10 CFR 50.49.
Renewed License No. NPF-5 Amendment No.
- 6b-(h) TSTF-448. Control Room Habitability Upon implementation of the Amendments adopting TSTF-448, Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by SR 3. 7.4.4, in accordance with TS 5.5.14.c.(i), the assessment of CRE habitability as required by Specification 5.5.14.c.(ii), and the measurement of CRE pressure as required by Specification 5.5.14.d, shall be considered met. Following implementation:
i) The first performance of SR 3.7.4.4, in accordance with Specification 5.5.14.c.(i), shall be within the next 18 months.
ii) The first performance of the periodic assessment of CRE habitability, Specification 5.5.14.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 3.0.2, of the next successful tracer gas test.
iii) The first performance of the periodic measurement of CRE pressure, Specification 5.5.14.d, shall be within 24 months, plus the 6 months allowed by SR 3.0.2, from the date of the most recent successful pressure measurement test.
D. This renewed license is subject to the following antitrust conditions:
(1) As used herein:
(a) "Entity means any financially responsible person, private or public corporation, municipality, county, cooperative, association, joint stock association or business trust, owning, operating or proposing to own or operate equipment or facilities within the state of Georgia (other than Chatham, Effingham, Fannin, Towns and Union Counties) for Renewed License No. NPF-5 Amendment No.