NL-12-0282, M. J. Ajluni Ltr Annual Radioactive Effluent Release Report

From kanterella
Jump to navigation Jump to search
M. J. Ajluni Ltr Annual Radioactive Effluent Release Report
ML12052A206
Person / Time
Site: Hatch, Farley, 07200042, 07200036  Southern Nuclear icon.png
Issue date: 02/21/2012
From: Ajluni M
Southern Nuclear Operating Co
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk
References
NL-12-0282
Download: ML12052A206 (2)


Text

Mark J. Ailuni, P.E. Southern Nuclear Nuclear Licensing Director Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alaba ma 35201 Tel 205.992.7673 Fax 205.992.7885 February 21 , 2012 Docket Nos.: 50-321 50-348 NL-12-0282 50-366 50-364 72-36 72-42 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington , D. C. 20555-0001 Joseph M. Farley Nuclear Plant Edwin I. Hatch Nuclear Plant Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report Ladies and Gentlemen:

In accordance with 10 CFR 72.44(d)(3) , Southern Nuclear Operating Company (SNC) hereby submits the annual report specifying the quantity of each of the principal radionuclides released to the environment in liquid and gaseous effluents during the period of operation of the Independent Spent Fuel Storage Installation (ISFSI) in the previous calendar year at Joseph M. Farley Nuclear Plant (FNP) and Edwin I. Hatch Nuclear Plant (HNP).

By the design of the seal welded storage canisters of the ISFSI , there are no plausible effluent release pathways . Periodic surveillances and radiological surveys of and around the facilities performed during the year confirm that the canister and overpack assemblies are performing as designed . The effluent releases from the ISFSI at FNP and HNP for the 2011 calendar year are zero .

This letter contains no NRC commitments . If you have any questions, please contact Jack Stringfellow at (205) 992-7037 Respectfully submitted,

~~~

1\J1. J. Ajluni Nuclear Licensing Director MJAlEGAliac

U. S. Nuclear Regulatory Commission NL-12-0282 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. T. A. Lynch, Vice President - Farley Mr. D. R. Madison, Vice President - Hatch Mr. B. L. Ivey, Vice President - Regulatory Affairs Mr. B. J. Adams, Vice President - Fleet Operations RType: Farley=CFA04.054; Hatch=CHA02.004 U. S. Nuclear Regulatorv Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, !\JRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley Mr. E. D. Morris, Senior Resident Inspector - Hatch Mr. P. G. Boyle, NRR Senior Project Manager - Hatch